{"id":3397,"date":"2026-08-11T11:25:28","date_gmt":"2026-08-11T11:25:28","guid":{"rendered":"https:\/\/qualitanceindia.com\/?p=3397"},"modified":"2026-08-11T11:25:28","modified_gmt":"2026-08-11T11:25:28","slug":"bis-certification-for-electric-ceiling-type-fans-is-3742019-bis-licence-for-ceiling-fans","status":"publish","type":"post","link":"https:\/\/qualitanceindia.com\/bis-certification-for-electric-ceiling-type-fans-is-3742019-bis-licence-for-ceiling-fans\/","title":{"rendered":"BIS Certification for Electric Ceiling Type Fans \u2013 IS 374:2019 | BIS Licence for Ceiling Fans"},"content":{"rendered":"<h1>Introduction<\/h1>\n<p class=\"isSelectedEnd\"><strong>BIS Certification for Electric Ceiling Type Fans<\/strong> is a mandatory conformity requirement for covered electric ceiling fans under <strong>IS 374:2019 \u2013 Electric Ceiling Type Fans<\/strong>. BIS currently lists IS 374:2019 under compulsory certification through the <strong>Electric Ceiling Type Fans (Quality Control) Order, 2023<\/strong>, with an amendment to the QCO listed as <strong>S.O. 777(E), dated 13 February 2026<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">IS 374:2019 is the third revision of the Indian Standard for electric ceiling type fans and covers important requirements relating to construction, safety, air performance, speed, power input, endurance and other performance characteristics. The BIS Product Manual states that the standard covers ceiling fans driven by <strong>squirrel cage induction motors (capacitor type) or brushless DC motors<\/strong>, with or without speed regulators or remote-control devices.<\/p>\n<p class=\"isSelectedEnd\">The standard provides requirements for fan sizes, electrical safety, air delivery, performance and testing. BIS laboratory records also show testing against requirements such as air performance, fan speed, power factor and power input, endurance, harmonic distortion, electrical safety and other applicable tests.<\/p>\n<p class=\"isSelectedEnd\">For manufacturers and businesses dealing with covered ceiling fans, obtaining the applicable BIS licence and maintaining compliance with IS 374:2019 and the current QCO requirements is important for lawful market supply.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>About the Product<\/h1>\n<p class=\"isSelectedEnd\"><strong>Electric Ceiling Type Fans<\/strong> are electrically powered ceiling-mounted fans designed to circulate air within residential, commercial and similar spaces.<\/p>\n<p class=\"isSelectedEnd\">Under IS 374:2019, the product scope includes ceiling fans driven by:<\/p>\n<ul data-spread=\"false\">\n<li>Squirrel cage induction motor<\/li>\n<li>Capacitor-type induction motor<\/li>\n<li>Brushless DC motor (BLDC)<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The Product Manual also allows the licence scope to include fans:<\/p>\n<ul data-spread=\"false\">\n<li>With speed regulators<\/li>\n<li>Without speed regulators<\/li>\n<li>With remote-control devices<\/li>\n<li>Without remote-control devices<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The BIS Product Manual identifies the licence scope in terms of fan size, voltage, frequency, insulation class, motor type and control accessories.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What is BIS Certification?<\/h1>\n<p class=\"isSelectedEnd\"><strong>BIS Certification<\/strong> is a conformity-assessment system administered by the <strong>Bureau of Indian Standards (BIS)<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">For products covered under compulsory certification, manufacturers are required to demonstrate conformity with the applicable Indian Standard and comply with the relevant BIS certification requirements before using the Standard Mark in accordance with their licence.<\/p>\n<p class=\"isSelectedEnd\">Electric Ceiling Type Fans under <strong>IS 374:2019<\/strong> are currently included in BIS&#8217;s compulsory-certification framework.<\/p>\n<p class=\"isSelectedEnd\">The certification process generally involves:<\/p>\n<ul data-spread=\"false\">\n<li>Product applicability assessment<\/li>\n<li>Documentation<\/li>\n<li>Product testing<\/li>\n<li>Sample evaluation<\/li>\n<li>Factory assessment<\/li>\n<li>Quality-control verification<\/li>\n<li>BIS application<\/li>\n<li>Technical scrutiny<\/li>\n<li>Grant of licence<\/li>\n<li>Ongoing compliance and surveillance<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What is IS 374:2019?<\/h1>\n<p class=\"isSelectedEnd\"><strong>IS 374:2019<\/strong> is titled:<\/p>\n<p class=\"isSelectedEnd\"><strong>Electric Ceiling Type Fans<\/strong><\/p>\n<p class=\"isSelectedEnd\">It is the <strong>third revision<\/strong> of the standard.<\/p>\n<p class=\"isSelectedEnd\">The standard establishes requirements relating to:<\/p>\n<ul data-spread=\"false\">\n<li>Construction<\/li>\n<li>Electrical safety<\/li>\n<li>Fan performance<\/li>\n<li>Air delivery<\/li>\n<li>Fan speed<\/li>\n<li>Power input<\/li>\n<li>Power factor<\/li>\n<li>Endurance<\/li>\n<li>Speed regulators<\/li>\n<li>Harmonic distortion<\/li>\n<li>Mechanical and electrical safety<\/li>\n<li>Marking<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS&#8217;s Product Manual identifies the standard as <strong>IS 374:2019 \u2013 Electric Ceiling Type Fans<\/strong> and states that certification is operated under <strong>Scheme-I<\/strong>.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Scope of IS 374:2019<\/h1>\n<p class=\"isSelectedEnd\">IS 374:2019 covers electric ceiling type fans with applicable characteristics specified by the standard.<\/p>\n<p class=\"isSelectedEnd\">The BIS Product Manual describes the licence scope as including:<\/p>\n<p class=\"isSelectedEnd\"><strong>Electric ceiling type fans driven by squirrel cage induction motor (capacitor type) \/ Brushless DC motor fans, with or without Speed Regulators \/ Remote Control Device, for fan sizes in the applicable range, rated voltage, 50 Hz and applicable insulation class.<\/strong><\/p>\n<p class=\"isSelectedEnd\">The standard information published by BIS describes fan sizes from <strong>600 mm to 1500 mm<\/strong>, with requirements covering materials, blade balance, motor enclosures, air performance and electrical safety.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Products Covered<\/h1>\n<p class=\"isSelectedEnd\">Depending on the applicable product scope, BIS certification can cover:<\/p>\n<ul data-spread=\"false\">\n<li>Electric ceiling fans<\/li>\n<li>Conventional ceiling fans<\/li>\n<li>Capacitor-type induction motor ceiling fans<\/li>\n<li>BLDC ceiling fans<\/li>\n<li>Ceiling fans with speed regulators<\/li>\n<li>Ceiling fans without speed regulators<\/li>\n<li>Ceiling fans with remote controls<\/li>\n<li>Ceiling fans without remote controls<\/li>\n<li>Residential ceiling fans<\/li>\n<li>Commercial-use ceiling fans within the standard scope<\/li>\n<li>Different fan sizes covered by the licence<\/li>\n<li>Different rated voltage configurations<\/li>\n<li>Different insulation classes<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The exact licence scope should be finalized according to the applicable BIS Product Manual and current requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Fan Sizes Covered<\/h1>\n<p class=\"isSelectedEnd\">The BIS standard information indicates a size range of:<\/p>\n<p class=\"isSelectedEnd\"><strong>600 mm to 1500 mm<\/strong><\/p>\n<p class=\"isSelectedEnd\">The exact sizes included in a manufacturer&#8217;s BIS licence depend on the proposed product range and applicable product-grouping provisions.<\/p>\n<p class=\"isSelectedEnd\">Common fan sizes may include:<\/p>\n<ul data-spread=\"false\">\n<li>600 mm<\/li>\n<li>900 mm<\/li>\n<li>1050 mm<\/li>\n<li>1200 mm<\/li>\n<li>1400 mm<\/li>\n<li>1500 mm<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The manufacturer should verify the exact proposed sizes against the current BIS requirements before submitting the application.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Motor Types Covered<\/h1>\n<h2>1. Squirrel Cage Induction Motor<\/h2>\n<p class=\"isSelectedEnd\">Traditional capacitor-type induction motor ceiling fans fall within the standard&#8217;s scope.<\/p>\n<h2>2. Brushless DC Motor \u2013 BLDC<\/h2>\n<p class=\"isSelectedEnd\">IS 374:2019 also includes ceiling fans powered by <strong>Brushless DC motors<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">The inclusion of BLDC technology is one of the important features of the revised standard.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Speed Regulators<\/h1>\n<p class=\"isSelectedEnd\">Ceiling fans may be supplied with or without speed regulators within the applicable licence scope.<\/p>\n<p class=\"isSelectedEnd\">The standard includes requirements relating to:<\/p>\n<ul data-spread=\"false\">\n<li>Speed control<\/li>\n<li>Reduction in speed<\/li>\n<li>Multiple speed positions<\/li>\n<li>Regulator performance<\/li>\n<li>Regulator endurance<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS testing records specifically include testing of speed regulators and mechanical endurance for regulators.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Remote Control Device<\/h1>\n<p class=\"isSelectedEnd\">Fans may also be provided with a remote-control device where applicable.<\/p>\n<p class=\"isSelectedEnd\">The BIS Product Manual identifies remote-control devices as a scope parameter and refers to applicable requirements for such devices.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Enforcement \/ Mandatory Certification Status<\/h1>\n<p class=\"isSelectedEnd\">Electric Ceiling Type Fans are currently under compulsory BIS certification.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s current Scheme-I list identifies:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 374:2019 \u2013 Electric Ceiling Type Fans<\/strong><\/p>\n<p class=\"isSelectedEnd\">under:<\/p>\n<p class=\"isSelectedEnd\"><strong>Electric Ceiling Type Fans (Quality Control) Order, 2023 \u2013 S.O. 3641(E), dated 9 August 2023<\/strong><\/p>\n<p class=\"isSelectedEnd\">The BIS list also records an amendment to the QCO:<\/p>\n<p class=\"isSelectedEnd\"><strong>S.O. 777(E), dated 13 February 2026.<\/strong><\/p>\n<h3>Important Website Note<\/h3>\n<p class=\"isSelectedEnd\">Because QCOs can be amended from time to time, manufacturers should verify the latest notification and applicability before relying on a historical implementation date.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Applicable QCO Details<\/h1>\n<table>\n<tbody>\n<tr>\n<th>Particular<\/th>\n<th>Details<\/th>\n<\/tr>\n<tr>\n<td>Product<\/td>\n<td>Electric Ceiling Type Fans<\/td>\n<\/tr>\n<tr>\n<td>Indian Standard<\/td>\n<td>IS 374:2019<\/td>\n<\/tr>\n<tr>\n<td>Standard Title<\/td>\n<td>Electric Ceiling Type Fans<\/td>\n<\/tr>\n<tr>\n<td>Certification<\/td>\n<td>Mandatory<\/td>\n<\/tr>\n<tr>\n<td>Certification Scheme<\/td>\n<td>Scheme-I<\/td>\n<\/tr>\n<tr>\n<td>QCO<\/td>\n<td>Electric Ceiling Type Fans (Quality Control) Order, 2023<\/td>\n<\/tr>\n<tr>\n<td>Original QCO Notification<\/td>\n<td>S.O. 3641(E), 9 August 2023<\/td>\n<\/tr>\n<tr>\n<td>2026 Amendment<\/td>\n<td>S.O. 777(E), 13 February 2026<\/td>\n<\/tr>\n<tr>\n<td>BIS Mark<\/td>\n<td>Standard Mark \/ ISI Mark as applicable<\/td>\n<\/tr>\n<tr>\n<td>Product Types<\/td>\n<td>Induction Motor \/ BLDC Fans<\/td>\n<\/tr>\n<tr>\n<td>Fan Size Range<\/td>\n<td>600 mm\u20131500 mm, subject to applicable scope<\/td>\n<\/tr>\n<tr>\n<td>Testing<\/td>\n<td>Mandatory as applicable<\/td>\n<\/tr>\n<tr>\n<td>Factory Assessment<\/td>\n<td>Applicable<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"isSelectedEnd\">BIS&#8217;s compulsory-certification list is the primary source for the current QCO linkage.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Who Needs BIS Certification?<\/h1>\n<p class=\"isSelectedEnd\">BIS certification can be applicable to manufacturers producing covered electric ceiling type fans.<\/p>\n<p class=\"isSelectedEnd\">This can include:<\/p>\n<ul data-spread=\"false\">\n<li>Ceiling fan manufacturers<\/li>\n<li>Electric fan manufacturers<\/li>\n<li>BLDC fan manufacturers<\/li>\n<li>Domestic fan manufacturers<\/li>\n<li>Commercial fan manufacturers within scope<\/li>\n<li>OEM fan manufacturers<\/li>\n<li>Private-label manufacturers<\/li>\n<li>Electrical appliance manufacturers producing covered fans<\/li>\n<li>Eligible foreign manufacturers<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Importers and sellers should also ensure that the products they place on the Indian market are covered by the required certification and QCO provisions.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Eligibility Criteria<\/h1>\n<p class=\"isSelectedEnd\">A manufacturer should have appropriate:<\/p>\n<h2>Manufacturing Facilities<\/h2>\n<ul data-spread=\"false\">\n<li>Motor assembly facilities<\/li>\n<li>Stator\/rotor assembly facilities<\/li>\n<li>Blade manufacturing\/assembly facilities<\/li>\n<li>Fan housing facilities<\/li>\n<li>Wiring facilities<\/li>\n<li>Electrical assembly<\/li>\n<li>Final assembly<\/li>\n<li>Finishing and packing facilities<\/li>\n<\/ul>\n<h2>Quality-Control Facilities<\/h2>\n<ul data-spread=\"false\">\n<li>Incoming material inspection<\/li>\n<li>In-process inspection<\/li>\n<li>Finished-product inspection<\/li>\n<li>Electrical testing<\/li>\n<li>Performance testing arrangements<\/li>\n<li>Calibration system<\/li>\n<li>Quality records<\/li>\n<\/ul>\n<h2>Documentation<\/h2>\n<ul data-spread=\"false\">\n<li>Manufacturing process<\/li>\n<li>Product specifications<\/li>\n<li>Drawings<\/li>\n<li>Component details<\/li>\n<li>Test records<\/li>\n<li>Quality-control plan<\/li>\n<li>Marking information<\/li>\n<li>Factory records<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Complete BIS Certification Process<\/h1>\n<h2>Step 1 \u2013 Product Applicability Assessment<\/h2>\n<p class=\"isSelectedEnd\">Determine whether the fan falls under <strong>IS 374:2019<\/strong>.<\/p>\n<h2>Step 2 \u2013 Product Specification Review<\/h2>\n<p class=\"isSelectedEnd\">Identify:<\/p>\n<ul data-spread=\"false\">\n<li>Motor type<\/li>\n<li>Fan size<\/li>\n<li>Rated voltage<\/li>\n<li>Frequency<\/li>\n<li>Insulation class<\/li>\n<li>Speed regulator<\/li>\n<li>Remote-control device<\/li>\n<\/ul>\n<h2>Step 3 \u2013 Product Grouping<\/h2>\n<p class=\"isSelectedEnd\">Determine the applicable grouping of fan variants.<\/p>\n<h2>Step 4 \u2013 Factory Readiness<\/h2>\n<p class=\"isSelectedEnd\">Evaluate manufacturing, testing and quality-control arrangements.<\/p>\n<h2>Step 5 \u2013 Documentation<\/h2>\n<p class=\"isSelectedEnd\">Prepare the required BIS application and technical documents.<\/p>\n<h2>Step 6 \u2013 Sample Preparation<\/h2>\n<p class=\"isSelectedEnd\">Prepare representative samples according to applicable BIS requirements.<\/p>\n<p class=\"isSelectedEnd\">The Product Manual specifies a sample size of <strong>3 units<\/strong> for the product.<\/p>\n<h2>Step 7 \u2013 Product Testing<\/h2>\n<p class=\"isSelectedEnd\">Conduct applicable tests through the appropriate testing arrangement\/laboratory.<\/p>\n<h2>Step 8 \u2013 BIS Application<\/h2>\n<p class=\"isSelectedEnd\">Submit the BIS application with supporting documents.<\/p>\n<h2>Step 9 \u2013 Application Scrutiny<\/h2>\n<p class=\"isSelectedEnd\">BIS reviews the submitted information.<\/p>\n<h2>Step 10 \u2013 Factory Inspection<\/h2>\n<p class=\"isSelectedEnd\">BIS evaluates the manufacturing and quality-control arrangements.<\/p>\n<h2>Step 11 \u2013 Sample\/Test Verification<\/h2>\n<p class=\"isSelectedEnd\">Test results and applicable samples are reviewed.<\/p>\n<h2>Step 12 \u2013 Observation Closure<\/h2>\n<p class=\"isSelectedEnd\">Address BIS technical or documentation observations.<\/p>\n<h2>Step 13 \u2013 Licence Grant<\/h2>\n<p class=\"isSelectedEnd\">After satisfying applicable requirements, BIS may grant the licence.<\/p>\n<h2>Step 14 \u2013 Standard Mark Compliance<\/h2>\n<p class=\"isSelectedEnd\">The manufacturer uses the Standard Mark according to the licence conditions.<\/p>\n<h2>Step 15 \u2013 Ongoing Compliance<\/h2>\n<p class=\"isSelectedEnd\">Maintain production testing, quality records and surveillance requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Required Documents<\/h1>\n<p class=\"isSelectedEnd\">Common documents can include:<\/p>\n<ul data-spread=\"false\">\n<li>Company registration documents<\/li>\n<li>Factory registration documents<\/li>\n<li>Factory address proof<\/li>\n<li>Factory layout<\/li>\n<li>Manufacturing process flow chart<\/li>\n<li>Machinery list<\/li>\n<li>Testing equipment list<\/li>\n<li>Calibration certificates<\/li>\n<li>Product specifications<\/li>\n<li>Product drawings<\/li>\n<li>Technical datasheets<\/li>\n<li>Motor specifications<\/li>\n<li>Blade specifications<\/li>\n<li>Regulator specifications<\/li>\n<li>Remote-control specifications<\/li>\n<li>Raw-material details<\/li>\n<li>Component details<\/li>\n<li>Supplier information<\/li>\n<li>Quality-control plan<\/li>\n<li>Internal test reports<\/li>\n<li>Finished-product test records<\/li>\n<li>Marking details<\/li>\n<li>Packaging details<\/li>\n<li>Trademark documents<\/li>\n<li>Authorized signatory documents<\/li>\n<li>BIS application documents<\/li>\n<li>Applicable declarations\/undertakings<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The exact documentation should be finalized according to the current BIS application requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Testing Requirements<\/h1>\n<p class=\"isSelectedEnd\">Testing is a major part of BIS Certification for Electric Ceiling Type Fans.<\/p>\n<p class=\"isSelectedEnd\">BIS laboratory records for IS 374:2019 show testing across electrical safety, performance and endurance requirements.<\/p>\n<p class=\"isSelectedEnd\">Important testing areas include:<\/p>\n<h2>1. Design and General Construction<\/h2>\n<p class=\"isSelectedEnd\">The fan is assessed for applicable construction requirements.<\/p>\n<h2>2. Electrical Safety<\/h2>\n<p class=\"isSelectedEnd\">Testing can include:<\/p>\n<ul data-spread=\"false\">\n<li>Protection against electric shock<\/li>\n<li>Electrical insulation<\/li>\n<li>Leakage current<\/li>\n<li>High-voltage\/electric-strength testing<\/li>\n<li>Earthing<\/li>\n<li>Creepage distances<\/li>\n<li>Clearances<\/li>\n<li>Insulation systems<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS laboratory scopes for IS 374:2019 include these electrical safety requirements.<\/p>\n<h2>3. Temperature Rise<\/h2>\n<p class=\"isSelectedEnd\">The temperature rise of relevant components is evaluated under applicable operating conditions.<\/p>\n<h2>4. Air Delivery Test<\/h2>\n<p class=\"isSelectedEnd\">Air performance is an important characteristic of ceiling fans.<\/p>\n<p class=\"isSelectedEnd\">BIS laboratory listings specifically identify <strong>air performance testing<\/strong> for IS 374:2019.<\/p>\n<h2>5. Fan Speed<\/h2>\n<p class=\"isSelectedEnd\">The actual speed of the fan is measured according to the standard.<\/p>\n<h2>6. Power Input<\/h2>\n<p class=\"isSelectedEnd\">Power consumption\/input is evaluated.<\/p>\n<h2>7. Power Factor<\/h2>\n<p class=\"isSelectedEnd\">Power factor is measured for applicable fan configurations.<\/p>\n<h2>8. Endurance Test<\/h2>\n<p class=\"isSelectedEnd\">Fans and applicable regulators are subjected to endurance requirements.<\/p>\n<h2>9. Speed Regulator Testing<\/h2>\n<p class=\"isSelectedEnd\">Where a regulator is supplied, applicable requirements are tested.<\/p>\n<h2>10. Harmonic Distortion<\/h2>\n<p class=\"isSelectedEnd\">For applicable BLDC\/electronic fan configurations, harmonic distortion requirements are evaluated.<\/p>\n<p class=\"isSelectedEnd\">BIS laboratory records specifically list <strong>harmonic distortion testing<\/strong> under IS 374:2019.<\/p>\n<h2>11. Mechanical Strength<\/h2>\n<p class=\"isSelectedEnd\">Relevant mechanical safety and strength requirements are evaluated.<\/p>\n<h2>12. Resistance to Heat and Fire<\/h2>\n<p class=\"isSelectedEnd\">Applicable materials\/components may be evaluated for resistance to heat and fire.<\/p>\n<h2>13. Resistance to Rusting<\/h2>\n<p class=\"isSelectedEnd\">Applicable components are assessed against corrosion\/rusting requirements.<\/p>\n<h2>14. Marking<\/h2>\n<p class=\"isSelectedEnd\">The fan&#8217;s required markings are checked.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Important Performance Requirements<\/h1>\n<p class=\"isSelectedEnd\">IS 374:2019 focuses on important performance characteristics such as:<\/p>\n<ul data-spread=\"false\">\n<li>Air delivery<\/li>\n<li>Service value<\/li>\n<li>Fan speed<\/li>\n<li>Power input<\/li>\n<li>Power factor<\/li>\n<li>Starting<\/li>\n<li>Silent operation<\/li>\n<li>Endurance<\/li>\n<li>Harmonic distortion where applicable<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS&#8217;s laboratory testing records specifically list air performance, speed, power factor\/power input, endurance and harmonic distortion tests.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Safety Requirements<\/h1>\n<p class=\"isSelectedEnd\">Safety is an important part of BIS certification for ceiling fans.<\/p>\n<p class=\"isSelectedEnd\">Applicable requirements can include:<\/p>\n<ul data-spread=\"false\">\n<li>Protection against electric shock<\/li>\n<li>Electrical insulation<\/li>\n<li>Moisture resistance<\/li>\n<li>Electric strength<\/li>\n<li>Fault-condition safety<\/li>\n<li>Earthing<\/li>\n<li>Creepage distances<\/li>\n<li>Clearances<\/li>\n<li>Screws and connections<\/li>\n<li>Resistance to heat and fire<\/li>\n<li>Resistance to rusting<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS laboratory records for IS 374:2019 include these types of safety tests under the applicable test clauses.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Product Grouping<\/h1>\n<p class=\"isSelectedEnd\">Product grouping is important when a manufacturer produces multiple ceiling fan variants.<\/p>\n<p class=\"isSelectedEnd\">The BIS Product Manual provides grouping guidance in <strong>Annex A<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">A manufacturer may have variations in:<\/p>\n<ul data-spread=\"false\">\n<li>Fan size<\/li>\n<li>Motor type<\/li>\n<li>Voltage<\/li>\n<li>Insulation class<\/li>\n<li>Speed regulator<\/li>\n<li>Remote-control device<\/li>\n<li>Product construction<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The proposed licence scope should be prepared carefully so that representative products and variants are covered appropriately.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Sample Requirements<\/h1>\n<p class=\"isSelectedEnd\">The BIS Product Manual specifies:<\/p>\n<p class=\"isSelectedEnd\"><strong>Sample Size: 3 Nos.<\/strong><\/p>\n<p class=\"isSelectedEnd\">for IS 374:2019 certification.<\/p>\n<p class=\"isSelectedEnd\">The actual sample selection and testing should follow the current BIS Product Manual, grouping guidelines and instructions applicable to the certification application.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Factory Inspection Process<\/h1>\n<p class=\"isSelectedEnd\">During BIS factory inspection, the manufacturer should be prepared to demonstrate:<\/p>\n<h2>Raw Material Control<\/h2>\n<ul data-spread=\"false\">\n<li>Electrical components<\/li>\n<li>Motor components<\/li>\n<li>Capacitors<\/li>\n<li>Wiring<\/li>\n<li>Insulation materials<\/li>\n<li>Blades<\/li>\n<li>Housing materials<\/li>\n<li>Regulators<\/li>\n<li>Remote-control components<\/li>\n<\/ul>\n<h2>Manufacturing Control<\/h2>\n<ul data-spread=\"false\">\n<li>Motor assembly<\/li>\n<li>Winding\/assembly<\/li>\n<li>Rotor\/stator assembly<\/li>\n<li>Blade assembly<\/li>\n<li>Electrical wiring<\/li>\n<li>Fan balancing<\/li>\n<li>Final assembly<\/li>\n<li>Inspection<\/li>\n<li>Packing<\/li>\n<\/ul>\n<h2>Quality Control<\/h2>\n<ul data-spread=\"false\">\n<li>Incoming inspection<\/li>\n<li>In-process inspection<\/li>\n<li>Final inspection<\/li>\n<li>Electrical testing<\/li>\n<li>Performance testing<\/li>\n<li>Rejection control<\/li>\n<li>Corrective action<\/li>\n<li>Calibration<\/li>\n<\/ul>\n<h2>Testing Arrangement<\/h2>\n<p class=\"isSelectedEnd\">The manufacturer should have the required testing equipment or an acceptable testing arrangement according to BIS requirements.<\/p>\n<p class=\"isSelectedEnd\">The Product Manual provides a dedicated list of test equipment under <strong>Annex B<\/strong>.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Common Reasons for BIS Certification Application Rejection<\/h1>\n<p class=\"isSelectedEnd\">Common compliance issues can include:<\/p>\n<ul data-spread=\"false\">\n<li>Incorrect standard selection<\/li>\n<li>Incorrect product scope<\/li>\n<li>Incomplete product grouping<\/li>\n<li>Incorrect fan size declaration<\/li>\n<li>Motor specification mismatch<\/li>\n<li>Failed air-delivery test<\/li>\n<li>Failed power-input test<\/li>\n<li>Failed power-factor test<\/li>\n<li>Failed endurance test<\/li>\n<li>Failed electrical safety test<\/li>\n<li>Failed insulation test<\/li>\n<li>Failed high-voltage test<\/li>\n<li>Failed earthing test<\/li>\n<li>Failed temperature-rise test<\/li>\n<li>Failed regulator test<\/li>\n<li>Harmonic-distortion non-compliance<\/li>\n<li>Inadequate testing equipment<\/li>\n<li>Calibration problems<\/li>\n<li>Incomplete manufacturing records<\/li>\n<li>Incomplete technical documents<\/li>\n<li>Incorrect marking<\/li>\n<li>Factory inspection observations<\/li>\n<li>Failure to close BIS observations<\/li>\n<li>Non-compliance with current QCO requirements<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS Certification Cost for Electric Ceiling Fans<\/h1>\n<p class=\"isSelectedEnd\">There is <strong>no single fixed BIS certification cost<\/strong> for every ceiling fan manufacturer.<\/p>\n<p class=\"isSelectedEnd\">The total cost can depend on:<\/p>\n<ul data-spread=\"false\">\n<li>Number of fan models<\/li>\n<li>Number of sizes<\/li>\n<li>Motor type<\/li>\n<li>BLDC or induction motor<\/li>\n<li>Number of variants<\/li>\n<li>Speed regulator<\/li>\n<li>Remote-control device<\/li>\n<li>Product grouping<\/li>\n<li>Laboratory testing charges<\/li>\n<li>BIS application charges<\/li>\n<li>Inspection expenses<\/li>\n<li>Testing equipment<\/li>\n<li>Calibration<\/li>\n<li>Consultancy<\/li>\n<li>Re-testing, if required<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS LIMS currently shows different laboratories with different testing charges for IS 374:2019. For example, current listings show complete\/partial testing packages at different rates depending on laboratory scope and exclusions.<\/p>\n<p class=\"isSelectedEnd\">Therefore, the actual project cost should be calculated after reviewing the manufacturer&#8217;s exact product range.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS Certification Timeline<\/h1>\n<p class=\"isSelectedEnd\">The timeline can vary depending on:<\/p>\n<ul data-spread=\"false\">\n<li>Product complexity<\/li>\n<li>Number of models<\/li>\n<li>Sample readiness<\/li>\n<li>Laboratory availability<\/li>\n<li>Test results<\/li>\n<li>Documentation<\/li>\n<li>Factory readiness<\/li>\n<li>BIS scrutiny<\/li>\n<li>Inspection scheduling<\/li>\n<li>Technical observations<\/li>\n<li>Re-testing<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">A manufacturer can reduce unnecessary delays by preparing technical documents, testing arrangements and factory quality-control systems before submitting the application.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Benefits of BIS Certification<\/h1>\n<h2>1. Regulatory Compliance<\/h2>\n<p class=\"isSelectedEnd\">Helps manufacturers comply with mandatory BIS requirements applicable to covered ceiling fans.<\/p>\n<h2>2. Product Safety<\/h2>\n<p class=\"isSelectedEnd\">Certification supports compliance with applicable electrical and mechanical safety requirements.<\/p>\n<h2>3. Quality Assurance<\/h2>\n<p class=\"isSelectedEnd\">Testing and quality-control requirements encourage consistent manufacturing quality.<\/p>\n<h2>4. Customer Confidence<\/h2>\n<p class=\"isSelectedEnd\">BIS certification can strengthen buyer confidence in the product.<\/p>\n<h2>5. Market Acceptance<\/h2>\n<p class=\"isSelectedEnd\">Compliance supports lawful supply of covered products in the Indian market.<\/p>\n<h2>6. Brand Credibility<\/h2>\n<p class=\"isSelectedEnd\">The applicable Standard Mark can improve product credibility when used according to BIS licence conditions.<\/p>\n<h2>7. Better Manufacturing Control<\/h2>\n<p class=\"isSelectedEnd\">The certification process encourages systematic control of:<\/p>\n<ul data-spread=\"false\">\n<li>Raw materials<\/li>\n<li>Production<\/li>\n<li>Testing<\/li>\n<li>Inspection<\/li>\n<li>Traceability<\/li>\n<li>Finished products<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Why Choose Qualitance India?<\/h1>\n<p class=\"isSelectedEnd\"><strong>Qualitance India<\/strong> provides professional BIS Certification Consultancy for electric ceiling fan manufacturers.<\/p>\n<h3>Our Consultancy Services Include:<\/h3>\n<p class=\"isSelectedEnd\">\u2713 IS 374:2019 Applicability Assessment<br \/>\n\u2713 Product Scope Assessment<br \/>\n\u2713 Product Grouping Guidance<br \/>\n\u2713 BLDC Fan Certification Guidance<br \/>\n\u2713 Conventional Fan Certification Guidance<br \/>\n\u2713 BIS Documentation Support<br \/>\n\u2713 Testing Coordination<br \/>\n\u2713 Laboratory Coordination<br \/>\n\u2713 Sample Preparation Guidance<br \/>\n\u2713 BIS Application Assistance<br \/>\n\u2713 Factory Inspection Preparation<br \/>\n\u2713 Quality-Control Documentation<br \/>\n\u2713 Technical Query Assistance<br \/>\n\u2713 ISI Mark Compliance Guidance<br \/>\n\u2713 End-to-End BIS Certification Support<\/p>\n<h3>Contact Qualitance India<\/h3>\n<p class=\"isSelectedEnd\"><strong>Phone:<\/strong> +91-9310-615-170<br \/>\n<strong>Email:<\/strong> <a href=\"mailto:info@qualitanceindia.com\">info@qualitanceindia.com<\/a><br \/>\n<strong>Website:<\/strong> <a href=\"https:\/\/qualitanceindia.com\/\">https:\/\/qualitanceindia.com\/<\/a><\/p>\n<p class=\"isSelectedEnd\"><strong>Qualitance India \u2013 Improving Quality and Competence<\/strong><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Step-by-Step BIS Certification Flow Chart<\/h1>\n<p class=\"isSelectedEnd\"><strong>Product Identification<\/strong><br \/>\n\u2193<br \/>\n<strong>IS 374:2019 Applicability Check<\/strong><br \/>\n\u2193<br \/>\n<strong>Motor Type Identification<\/strong><br \/>\n\u2193<br \/>\n<strong>Fan Size Identification<\/strong><br \/>\n\u2193<br \/>\n<strong>Voltage &amp; Frequency Assessment<\/strong><br \/>\n\u2193<br \/>\n<strong>Regulator \/ Remote-Control Assessment<\/strong><br \/>\n\u2193<br \/>\n<strong>Product Grouping<\/strong><br \/>\n\u2193<br \/>\n<strong>Factory Readiness Assessment<\/strong><br \/>\n\u2193<br \/>\n<strong>Documentation Preparation<\/strong><br \/>\n\u2193<br \/>\n<strong>Sample Selection<\/strong><br \/>\n\u2193<br \/>\n<strong>Product Testing<\/strong><br \/>\n\u2193<br \/>\n<strong>BIS Application Submission<\/strong><br \/>\n\u2193<br \/>\n<strong>Application Scrutiny<\/strong><br \/>\n\u2193<br \/>\n<strong>Factory Inspection<\/strong><br \/>\n\u2193<br \/>\n<strong>Technical Observation Closure<\/strong><br \/>\n\u2193<br \/>\n<strong>BIS Licence Grant<\/strong><br \/>\n\u2193<br \/>\n<strong>ISI\/Standard Mark Compliance<\/strong><br \/>\n\u2193<br \/>\n<strong>Regular Testing &amp; Surveillance<\/strong><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>25 SEO FAQs<\/h1>\n<h2>1. Is BIS Certification mandatory for electric ceiling fans?<\/h2>\n<p class=\"isSelectedEnd\">Yes. BIS currently lists <strong>IS 374:2019 \u2013 Electric Ceiling Type Fans<\/strong> under compulsory certification through the Electric Ceiling Type Fans Quality Control Order.<\/p>\n<h2>2. What is IS 374:2019?<\/h2>\n<p class=\"isSelectedEnd\">IS 374:2019 is the Indian Standard for <strong>Electric Ceiling Type Fans<\/strong>.<\/p>\n<h2>3. What types of motors are covered under IS 374:2019?<\/h2>\n<p class=\"isSelectedEnd\">The BIS Product Manual covers ceiling fans driven by <strong>squirrel cage induction motors (capacitor type)<\/strong> and <strong>brushless DC motors<\/strong>.<\/p>\n<h2>4. Are BLDC ceiling fans covered by BIS?<\/h2>\n<p class=\"isSelectedEnd\">Yes. BLDC ceiling fans are included within the applicable scope of IS 374:2019.<\/p>\n<h2>5. Are speed regulators covered?<\/h2>\n<p class=\"isSelectedEnd\">Yes. Fans can be covered with or without speed regulators, subject to the applicable licence scope.<\/p>\n<h2>6. Are remote-controlled ceiling fans covered?<\/h2>\n<p class=\"isSelectedEnd\">Yes. The BIS Product Manual includes remote-control devices as an applicable scope parameter.<\/p>\n<h2>7. What fan sizes are covered?<\/h2>\n<p class=\"isSelectedEnd\">The standard information published by BIS indicates fan sizes from <strong>600 mm to 1500 mm<\/strong>.<\/p>\n<h2>8. What is the sample size for IS 374:2019?<\/h2>\n<p class=\"isSelectedEnd\">The BIS Product Manual specifies <strong>3 units<\/strong> as the product sample size.<\/p>\n<h2>9. What tests are required for ceiling fans?<\/h2>\n<p class=\"isSelectedEnd\">Testing can include air performance, fan speed, power input, power factor, endurance, electrical safety, temperature rise, insulation, earthing, mechanical strength and other applicable requirements.<\/p>\n<h2>10. Is air delivery testing required?<\/h2>\n<p class=\"isSelectedEnd\">Yes. Air performance\/air delivery is an important performance test under IS 374:2019.<\/p>\n<h2>11. Is endurance testing required?<\/h2>\n<p class=\"isSelectedEnd\">Yes. Endurance testing is included in the BIS testing framework for IS 374:2019.<\/p>\n<h2>12. Is harmonic distortion testing required?<\/h2>\n<p class=\"isSelectedEnd\">Harmonic distortion testing is included in the applicable BIS testing scope, particularly relevant to electronic\/BLDC fan configurations.<\/p>\n<h2>13. Is factory inspection required?<\/h2>\n<p class=\"isSelectedEnd\">Factory assessment is part of the applicable BIS certification process.<\/p>\n<h2>14. What documents are required for BIS certification of ceiling fans?<\/h2>\n<p class=\"isSelectedEnd\">Documents can include factory details, product specifications, drawings, manufacturing process, machinery details, testing equipment, calibration records, quality-control documents and marking information.<\/p>\n<h2>15. What is the BIS certification cost for ceiling fans?<\/h2>\n<p class=\"isSelectedEnd\">The cost depends on the number of models, sizes, motor types, tests, laboratory charges, inspection and other applicable expenses.<\/p>\n<h2>16. How long does BIS certification take?<\/h2>\n<p class=\"isSelectedEnd\">The timeline depends on testing, documentation, factory readiness, laboratory availability, BIS scrutiny and inspection scheduling.<\/p>\n<h2>17. Can a manufacturer get BIS certification for multiple fan sizes?<\/h2>\n<p class=\"isSelectedEnd\">Yes, multiple sizes can potentially be included subject to the applicable product grouping and BIS licence scope.<\/p>\n<h2>18. Can both BLDC and induction motor fans be covered?<\/h2>\n<p class=\"isSelectedEnd\">The standard covers both motor types, but the exact licence scope and grouping should be assessed for the manufacturer&#8217;s products.<\/p>\n<h2>19. What is the BIS Mark for ceiling fans?<\/h2>\n<p class=\"isSelectedEnd\">The applicable Standard Mark\/ISI Mark can be used according to the BIS licence and marking requirements.<\/p>\n<h2>20. What QCO applies to electric ceiling fans?<\/h2>\n<p class=\"isSelectedEnd\">The <strong>Electric Ceiling Type Fans (Quality Control) Order, 2023<\/strong> applies, and BIS&#8217;s current listing also records a <strong>2026 amendment<\/strong> to the QCO.<\/p>\n<h2>21. What is S.O. 777(E) for ceiling fans?<\/h2>\n<p class=\"isSelectedEnd\">S.O. 777(E), dated <strong>13 February 2026<\/strong>, is listed by BIS as an amendment to the Electric Ceiling Type Fans Quality Control Order, 2023.<\/p>\n<h2>22. Can foreign manufacturers obtain BIS certification?<\/h2>\n<p class=\"isSelectedEnd\">Eligible foreign manufacturers can apply under the applicable BIS foreign-manufacturer certification route, subject to the relevant BIS requirements.<\/p>\n<h2>23. Is testing available for IS 374:2019?<\/h2>\n<p class=\"isSelectedEnd\">Yes. BIS LIMS lists laboratories and testing scopes for IS 374:2019.<\/p>\n<h2>24. Is BIS certification required before selling covered ceiling fans in India?<\/h2>\n<p class=\"isSelectedEnd\">Manufacturers and other regulated parties should comply with the applicable mandatory BIS certification and QCO requirements before placing covered products on the Indian market.<\/p>\n<h2>25. How can I get BIS Certification for Electric Ceiling Fans?<\/h2>\n<p class=\"isSelectedEnd\">You should first confirm applicability, identify the fan&#8217;s motor type, size and accessories, prepare product grouping and documents, complete required testing, submit the BIS application, undergo factory assessment and satisfy applicable BIS requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>FAQ Schema Content<\/h1>\n<p class=\"isSelectedEnd\"><strong>Recommended Schema:<\/strong> FAQPage<\/p>\n<p class=\"isSelectedEnd\">Use the 25 FAQs above as visible FAQ content and create matching FAQ structured data.<\/p>\n<p class=\"isSelectedEnd\">The FAQ structured-data answers should exactly reflect the visible answers on the webpage.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Service Schema Suggestion<\/h1>\n<p class=\"isSelectedEnd\"><strong>Schema Type:<\/strong> Service<\/p>\n<p class=\"isSelectedEnd\"><strong>Service Name:<\/strong> BIS Certification Consultancy for Electric Ceiling Type Fans<\/p>\n<p class=\"isSelectedEnd\"><strong>Service Type:<\/strong> BIS Certification Consultancy<\/p>\n<p class=\"isSelectedEnd\"><strong>Standard:<\/strong> IS 374:2019<\/p>\n<p class=\"isSelectedEnd\"><strong>Provider:<\/strong> Qualitance India<\/p>\n<p class=\"isSelectedEnd\"><strong>Area Served:<\/strong> India<\/p>\n<p class=\"isSelectedEnd\"><strong>Description:<\/strong> BIS certification consultancy for electric ceiling type fan manufacturers as per IS 374:2019, including product scope assessment, product grouping, documentation, testing coordination, BIS application and factory inspection support.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Organization Schema Suggestion<\/h1>\n<p class=\"isSelectedEnd\"><strong>Schema Type:<\/strong> Organization<\/p>\n<p class=\"isSelectedEnd\"><strong>Organization Name:<\/strong> Qualitance India<\/p>\n<p class=\"isSelectedEnd\"><strong>Tagline:<\/strong> Improving Quality and Competence<\/p>\n<p class=\"isSelectedEnd\"><strong>Telephone:<\/strong> +91-9310-615-170<\/p>\n<p class=\"isSelectedEnd\"><strong>Email:<\/strong> <a href=\"mailto:info@qualitanceindia.com\">info@qualitanceindia.com<\/a><\/p>\n<p class=\"isSelectedEnd\"><strong>Website:<\/strong> <a href=\"https:\/\/qualitanceindia.com\/\">https:\/\/qualitanceindia.com\/<\/a><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Breadcrumb Schema Suggestion<\/h1>\n<p class=\"isSelectedEnd\"><strong>Home<\/strong><br \/>\n\u2192 <strong>BIS Certification<\/strong><br \/>\n\u2192 <strong>Electrical Products BIS Certification<\/strong><br \/>\n\u2192 <strong>Electric Ceiling Fan Certification<\/strong><br \/>\n\u2192 <strong>IS 374:2019<\/strong><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Article Schema Suggestion<\/h1>\n<p class=\"isSelectedEnd\"><strong>Schema Type:<\/strong> Article \/ BlogPosting<\/p>\n<p class=\"isSelectedEnd\"><strong>Headline:<\/strong> BIS Certification for Electric Ceiling Type Fans \u2013 IS 374:2019<\/p>\n<p class=\"isSelectedEnd\"><strong>Author:<\/strong> Qualitance India<\/p>\n<p class=\"isSelectedEnd\"><strong>Publisher:<\/strong> Qualitance India<\/p>\n<p class=\"isSelectedEnd\"><strong>Article Section:<\/strong> BIS Certification \/ Electrical Products<\/p>\n<p class=\"isSelectedEnd\"><strong>Keywords:<\/strong> BIS Certification for Electric Ceiling Type Fans, IS 374:2019, Ceiling Fan BIS Certification, Ceiling Fan ISI Mark<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Image ALT Tags \u2013 15<\/h1>\n<ol start=\"1\" data-spread=\"false\">\n<li>BIS Certification for Electric Ceiling Type Fans<\/li>\n<li>IS 374:2019 BIS Certification<\/li>\n<li>Electric Ceiling Fan BIS Certification India<\/li>\n<li>BIS Licence for Ceiling Fan Manufacturer<\/li>\n<li>Ceiling Fan ISI Mark Certification<\/li>\n<li>Electric Ceiling Fan Testing as per IS 374:2019<\/li>\n<li>BIS Testing for Ceiling Fans<\/li>\n<li>BLDC Fan BIS Certification<\/li>\n<li>Ceiling Fan Factory Inspection<\/li>\n<li>Electric Fan BIS Licence<\/li>\n<li>IS 374:2019 Ceiling Fan Testing<\/li>\n<li>Ceiling Fan QCO Certification<\/li>\n<li>BIS Certification for Fan Manufacturers<\/li>\n<li>Electric Ceiling Type Fan ISI Mark<\/li>\n<li>Qualitance India Ceiling Fan BIS Consultancy<\/li>\n<\/ol>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Internal Linking Strategy<\/h1>\n<p class=\"isSelectedEnd\">Is blog ko website ke relevant BIS service pages ke saath internally link karein.<\/p>\n<h3>Recommended Internal Links<\/h3>\n<ul data-spread=\"false\">\n<li>BIS Certification Consultancy<\/li>\n<li>BIS Certification Process<\/li>\n<li>BIS Certification Cost<\/li>\n<li>BIS Certification Documents<\/li>\n<li>BIS Product Testing<\/li>\n<li>BIS Factory Inspection<\/li>\n<li>BIS ISI Mark Certification<\/li>\n<li>Electrical Product BIS Certification<\/li>\n<li>BIS QCO Services<\/li>\n<li>BIS Certification for Electrical Appliances<\/li>\n<li>BIS Certification for BLDC Fans<\/li>\n<li>BIS Certification for Electric Fans<\/li>\n<\/ul>\n<h3>Recommended Anchor Text<\/h3>\n<ul data-spread=\"false\">\n<li>BIS Certification Process<\/li>\n<li>BIS Certification Cost<\/li>\n<li>BIS Certification Documents<\/li>\n<li>BIS Product Testing<\/li>\n<li>BIS Factory Inspection<\/li>\n<li>Electrical Product BIS Certification<\/li>\n<li>Ceiling Fan BIS Certification<\/li>\n<li>BLDC Fan BIS Certification<\/li>\n<li>BIS QCO Compliance<\/li>\n<li>ISI Mark Certification<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>External Authority References \u2013 BIS\/QCO<\/h1>\n<p class=\"isSelectedEnd\">Website E-E-A-T improve karne ke liye official BIS sources ko primary external references rakhein:<\/p>\n<ol start=\"1\" data-spread=\"false\">\n<li>BIS Scheme-I \/ Compulsory Certification List<\/li>\n<li>BIS IS 374:2019 Product Information<\/li>\n<li>BIS Product Manual for IS 374:2019<\/li>\n<li>Electric Ceiling Type Fans Quality Control Order, 2023<\/li>\n<li>2026 Amendment to Electric Ceiling Type Fans QCO<\/li>\n<li>BIS LIMS Testing Scope<\/li>\n<li>Applicable Scheme of Inspection and Testing<\/li>\n<\/ol>\n<p class=\"isSelectedEnd\">BIS&#8217;s current compulsory-certification list is particularly important because it now records the <strong>2026 QCO amendment<\/strong> as well.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Related BIS Services<\/h1>\n<ul data-spread=\"false\">\n<li>BIS Certification for Electric Ceiling Fans<\/li>\n<li>BIS Certification for BLDC Fans<\/li>\n<li>BIS Certification for Electrical Appliances<\/li>\n<li>BIS ISI Mark Certification<\/li>\n<li>BIS Product Testing<\/li>\n<li>BIS Factory Inspection Assistance<\/li>\n<li>BIS Documentation Support<\/li>\n<li>BIS Application Assistance<\/li>\n<li>BIS QCO Compliance<\/li>\n<li>BIS Testing Coordination<\/li>\n<li>Foreign Manufacturer BIS Certification<\/li>\n<li>Electrical Product Certification Consultancy<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Related Blog Suggestions<\/h1>\n<ol start=\"1\" data-spread=\"false\">\n<li>BIS Certification for Electric Ceiling Fans \u2013 Complete Guide<\/li>\n<li>IS 374:2019 \u2013 Complete BIS Certification Guide<\/li>\n<li>BIS Certification Process for Ceiling Fans<\/li>\n<li>BIS Certification Cost for Electric Ceiling Fans<\/li>\n<li>Documents Required for Ceiling Fan BIS Certification<\/li>\n<li>IS 374:2019 Testing Requirements<\/li>\n<li>BIS Testing for Electric Ceiling Fans<\/li>\n<li>Ceiling Fan Product Grouping Under BIS<\/li>\n<li>BIS Factory Inspection for Fan Manufacturers<\/li>\n<li>BLDC Fan BIS Certification in India<\/li>\n<li>Difference Between BLDC and Conventional Ceiling Fan Certification<\/li>\n<li>Ceiling Fan Air Delivery Testing<\/li>\n<li>Ceiling Fan Endurance Testing<\/li>\n<li>Ceiling Fan Power Consumption Testing<\/li>\n<li>Ceiling Fan Power Factor Testing<\/li>\n<li>Ceiling Fan Harmonic Distortion Testing<\/li>\n<li>Ceiling Fan Electrical Safety Testing<\/li>\n<li>Ceiling Fan ISI Mark Requirements<\/li>\n<li>Electric Fan QCO 2023 Explained<\/li>\n<li>Electric Ceiling Fan QCO Amendment 2026<\/li>\n<li>BIS Certification for Fan Regulators<\/li>\n<li>BIS Certification for Remote-Controlled Ceiling Fans<\/li>\n<li>Common Reasons for Ceiling Fan BIS Rejection<\/li>\n<li>How to Prepare Ceiling Fan Factory for BIS Inspection<\/li>\n<li>BIS Certification Guide for Electrical Product Manufacturers<\/li>\n<\/ol>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Strong Lead Generation CTA<\/h1>\n<h2>Need BIS Certification for Electric Ceiling Fans?<\/h2>\n<p class=\"isSelectedEnd\">Are you a <strong>Ceiling Fan Manufacturer, BLDC Fan Manufacturer, Electrical Appliance Manufacturer or OEM Fan Manufacturer<\/strong> looking for BIS certification support?<\/p>\n<p class=\"isSelectedEnd\"><strong>Qualitance India<\/strong> can assist you with:<\/p>\n<p class=\"isSelectedEnd\">\u2713 IS 374:2019 Applicability Assessment<br \/>\n\u2713 Product Scope Assessment<br \/>\n\u2713 Fan Size &amp; Motor Type Assessment<br \/>\n\u2713 Product Grouping<br \/>\n\u2713 BLDC Fan Certification Guidance<br \/>\n\u2713 BIS Documentation<br \/>\n\u2713 Testing Coordination<br \/>\n\u2713 Laboratory Coordination<br \/>\n\u2713 Sample Preparation<br \/>\n\u2713 BIS Application Assistance<br \/>\n\u2713 Factory Inspection Preparation<br \/>\n\u2713 Quality-Control Documentation<br \/>\n\u2713 Technical Query Support<br \/>\n\u2713 ISI Mark Compliance<br \/>\n\u2713 End-to-End BIS Certification Consultancy<\/p>\n<h3>Get Expert BIS Certification Support<\/h3>\n<p class=\"isSelectedEnd\"><strong>Call \/ WhatsApp:<\/strong> +91-9310-615-170<br \/>\n<strong>Email:<\/strong> <a href=\"mailto:info@qualitanceindia.com\">info@qualitanceindia.com<\/a><br \/>\n<strong>Website:<\/strong> <a href=\"https:\/\/qualitanceindia.com\/\">https:\/\/qualitanceindia.com\/<\/a><\/p>\n<p class=\"isSelectedEnd\"><strong>Qualitance India \u2013 Improving Quality and Competence<\/strong><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>SEO-Optimized Conclusion<\/h1>\n<p class=\"isSelectedEnd\"><strong>BIS Certification for Electric Ceiling Type Fans<\/strong> is a mandatory compliance requirement for covered products under <strong>IS 374:2019<\/strong>. BIS currently lists IS 374:2019 under compulsory certification through the <strong>Electric Ceiling Type Fans (Quality Control) Order, 2023<\/strong>, with a further amendment listed on <strong>13 February 2026<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">IS 374:2019 covers important requirements for electric ceiling fans, including construction, electrical safety, air performance, fan speed, power input, power factor, endurance and other applicable performance characteristics. The standard also covers ceiling fans using <strong>capacitor-type induction motors and BLDC motors<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">The BIS certification process involves product applicability assessment, product grouping, documentation, sample testing, BIS application, factory inspection and continuing compliance.<\/p>\n<p class=\"isSelectedEnd\">For manufacturers planning to obtain or maintain BIS certification, proper preparation of technical documentation, product samples, testing arrangements and factory quality-control systems can significantly reduce avoidable delays.<\/p>\n<p class=\"isSelectedEnd\"><strong>Qualitance India<\/strong> provides end-to-end BIS Certification Consultancy for electric ceiling fan manufacturers, including <strong>documentation support, testing coordination, product grouping, BIS application assistance, factory inspection preparation and ISI Mark compliance guidance<\/strong>.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Introduction BIS Certification for Electric Ceiling Type Fans is a mandatory conformity requirement for covered electric ceiling fans under IS 374:2019 \u2013 Electric Ceiling Type Fans. BIS currently lists IS 374:2019 under compulsory certification through the Electric Ceiling Type Fans (Quality Control) Order, 2023, with an amendment to the QCO listed as S.O. 777(E), dated [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3398,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"inline_featured_image":false,"slim_seo":{"title":"BIS Certification for Electric Ceiling Type Fans \u2013 IS 374:2019 | BIS Licence for Ceiling Fans - Qualitance India","description":"Introduction BIS Certification for Electric Ceiling Type Fans is a mandatory conformity requirement for covered electric ceiling fans under IS 374:2019 \u2013 Electr"},"_slim_seo_primary_term_category":0,"_slim_seo_primary_term_post_tag":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3397","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/comments?post=3397"}],"version-history":[{"count":1,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3397\/revisions"}],"predecessor-version":[{"id":3399,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3397\/revisions\/3399"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media\/3398"}],"wp:attachment":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media?parent=3397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/categories?post=3397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/tags?post=3397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<!-- This website is optimized by Airlift. Learn more: https://airlift.net. Template:. Learn more: https://airlift.net. Template: 6a4cebdea01328942bf8f471. Config Timestamp: 2026-07-07 12:06:54 UTC, Cached Timestamp: 2026-09-10 16:54:20 UTC, Optimization Time: 2.51ms -->