{"id":3582,"date":"2026-08-31T10:49:54","date_gmt":"2026-08-31T10:49:54","guid":{"rendered":"https:\/\/qualitanceindia.com\/?p=3582"},"modified":"2026-08-31T10:49:54","modified_gmt":"2026-08-31T10:49:54","slug":"bis-certification-for-hermetic-compressors-is-106172018-bis-certification-consultancy","status":"publish","type":"post","link":"https:\/\/qualitanceindia.com\/bis-certification-for-hermetic-compressors-is-106172018-bis-certification-consultancy\/","title":{"rendered":"BIS Certification for Hermetic Compressors | IS 10617:2018 | BIS Certification Consultancy"},"content":{"rendered":"<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"077c40a6-4f10-4a4f-b0cb-ddf34efbfa4a\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5-6\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\">\n<h1 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"12q1sue\" data-start=\"379\" data-end=\"393\">Introduction<\/h1>\n<p data-start=\"395\" data-end=\"686\">Hermetic Compressors are important components used in refrigeration and air-conditioning equipment. These compressors are designed with the motor and compressor mechanism enclosed within a gas-tight housing, making reliable construction, sealing, electrical safety and performance essential.<\/p>\n<p data-start=\"688\" data-end=\"1045\">In India, <strong data-start=\"698\" data-end=\"772\">IS 10617:2018 \u2013 Hermetic Compressors \u2014 Specification (Second Revision)<\/strong> specifies safety and performance requirements for hermetic sealed type standalone motor-compressors operating on the vapour compression cycle. BIS currently lists <strong data-start=\"936\" data-end=\"953\">IS 10617:2018<\/strong> under the compulsory product certification framework.<\/p>\n<p data-start=\"1047\" data-end=\"1335\">The standard covers compressors suitable for <strong data-start=\"1092\" data-end=\"1191\">low back pressure (LBP), commercial\/medium back pressure (CBP\/MBP) and high back pressure (HBP)<\/strong> applications and includes different compressor mechanisms such as reciprocating, rotary and scroll types.<\/p>\n<p data-start=\"1337\" data-end=\"1602\"><strong data-start=\"1337\" data-end=\"1357\">Qualitance India<\/strong> provides BIS Certification Consultancy for Hermetic Compressors as per IS 10617:2018, including product assessment, product grouping, documentation, laboratory testing coordination, BIS application assistance and factory inspection preparation.<\/p>\n<hr data-start=\"1604\" data-end=\"1607\" \/>\n<h1 data-section-id=\"18l68s9\" data-start=\"1609\" data-end=\"1632\">Product ke baare mein<\/h1>\n<p data-start=\"1634\" data-end=\"1866\">A Hermetic Compressor is a motor-compressor assembly enclosed inside a sealed housing. The housing is welded or brazed to form a gas-tight enclosure, and the internal moving components are not accessible without opening the housing.<\/p>\n<p data-start=\"1868\" data-end=\"1910\">Hermetic Compressors are commonly used in:<\/p>\n<ul data-start=\"1912\" data-end=\"2118\">\n<li data-section-id=\"18r9k89\" data-start=\"1912\" data-end=\"1927\">Refrigerators<\/li>\n<li data-section-id=\"ts5vky\" data-start=\"1928\" data-end=\"1938\">Freezers<\/li>\n<li data-section-id=\"1mpnlwm\" data-start=\"1939\" data-end=\"1967\">Air-conditioning equipment<\/li>\n<li data-section-id=\"1xujv2d\" data-start=\"1968\" data-end=\"2002\">Commercial refrigeration systems<\/li>\n<li data-section-id=\"522no2\" data-start=\"2003\" data-end=\"2027\">Cold-storage equipment<\/li>\n<li data-section-id=\"amcntm\" data-start=\"2028\" data-end=\"2049\">Refrigeration units<\/li>\n<li data-section-id=\"wmapkm\" data-start=\"2050\" data-end=\"2118\">Other household, commercial and industrial refrigeration equipment<\/li>\n<\/ul>\n<p data-start=\"2120\" data-end=\"2180\">The standard covers different pumping mechanisms, including:<\/p>\n<ul data-start=\"2182\" data-end=\"2272\">\n<li data-section-id=\"1f8w7mu\" data-start=\"2182\" data-end=\"2209\">Reciprocating compressors<\/li>\n<li data-section-id=\"6a7g4d\" data-start=\"2210\" data-end=\"2230\">Linear compressors<\/li>\n<li data-section-id=\"1rmwbhf\" data-start=\"2231\" data-end=\"2251\">Rotary compressors<\/li>\n<li data-section-id=\"15mhonh\" data-start=\"2252\" data-end=\"2272\">Scroll compressors<\/li>\n<\/ul>\n<p data-start=\"2274\" data-end=\"2311\">\n<hr data-start=\"2313\" data-end=\"2316\" \/>\n<h1 data-section-id=\"1stegyy\" data-start=\"2318\" data-end=\"2342\">Applicable IS Standard<\/h1>\n<p data-start=\"2344\" data-end=\"2378\">The applicable Indian Standard is:<\/p>\n<p data-start=\"2380\" data-end=\"2454\"><strong data-start=\"2380\" data-end=\"2454\">IS 10617:2018 \u2013 Hermetic Compressors \u2014 Specification (Second Revision)<\/strong><\/p>\n<p data-start=\"2456\" data-end=\"2569\">BIS identifies IS 10617:2018 as an <strong data-start=\"2491\" data-end=\"2510\">active standard<\/strong>, reaffirmed in 2022.<\/p>\n<p data-start=\"2571\" data-end=\"2815\">The BIS Product Manual for IS 10617:2018 provides certification-related information including grouping guidelines, sample requirements, testing equipment, Scheme of Inspection and Testing and licence scope.<\/p>\n<hr data-start=\"2817\" data-end=\"2820\" \/>\n<h1 data-section-id=\"p9r98e\" data-start=\"2822\" data-end=\"2841\">Scope of Standard<\/h1>\n<p data-start=\"2843\" data-end=\"3007\">IS 10617:2018 deals with the <strong data-start=\"2872\" data-end=\"3006\">safety and performance requirements of hermetic sealed type standalone motor-compressors operating on the vapour compression cycle<\/strong>.<\/p>\n<p data-start=\"3009\" data-end=\"3054\">The standard covers compressors suitable for:<\/p>\n<ul data-start=\"3056\" data-end=\"3152\">\n<li data-section-id=\"gafct0\" data-start=\"3056\" data-end=\"3086\">Low-temperature applications<\/li>\n<li data-section-id=\"1ldisvx\" data-start=\"3087\" data-end=\"3120\">Medium-temperature applications<\/li>\n<li data-section-id=\"1q42kj2\" data-start=\"3121\" data-end=\"3152\">High-temperature applications<\/li>\n<\/ul>\n<p data-start=\"3154\" data-end=\"3185\">It covers compressors based on:<\/p>\n<ul data-start=\"3187\" data-end=\"3273\">\n<li data-section-id=\"pbd4li\" data-start=\"3187\" data-end=\"3213\">Reciprocating mechanisms<\/li>\n<li data-section-id=\"z7aql\" data-start=\"3214\" data-end=\"3233\">Linear mechanisms<\/li>\n<li data-section-id=\"1t3nfqb\" data-start=\"3234\" data-end=\"3253\">Rotary mechanisms<\/li>\n<li data-section-id=\"x1847h\" data-start=\"3254\" data-end=\"3273\">Scroll mechanisms<\/li>\n<\/ul>\n<p data-start=\"3275\" data-end=\"3330\">The compressors may be intended for equipment used for:<\/p>\n<ul data-start=\"3332\" data-end=\"3396\">\n<li data-section-id=\"1sscelq\" data-start=\"3332\" data-end=\"3352\">Household purposes<\/li>\n<li data-section-id=\"rrqlg9\" data-start=\"3353\" data-end=\"3374\">Commercial purposes<\/li>\n<li data-section-id=\"1l5az4y\" data-start=\"3375\" data-end=\"3396\">Industrial purposes<\/li>\n<\/ul>\n<p data-start=\"3398\" data-end=\"3435\">\n<hr data-start=\"3437\" data-end=\"3440\" \/>\n<h1 data-section-id=\"1neb0m9\" data-start=\"3442\" data-end=\"3464\">Product Requirements<\/h1>\n<p data-start=\"3466\" data-end=\"3561\">Hermetic Compressors need to meet applicable safety, construction and performance requirements.<\/p>\n<p data-start=\"3563\" data-end=\"3597\">Important characteristics include:<\/p>\n<h3 data-section-id=\"4j8ov1\" data-start=\"3599\" data-end=\"3619\">Cooling Capacity<\/h3>\n<p data-start=\"3621\" data-end=\"3719\">The compressor should provide the specified cooling capacity under the applicable test conditions.<\/p>\n<h3 data-section-id=\"v4zld0\" data-start=\"3721\" data-end=\"3737\">Startability<\/h3>\n<p data-start=\"3739\" data-end=\"3825\">The compressor should be capable of starting under the specified operating conditions.<\/p>\n<h3 data-section-id=\"1j9zvdg\" data-start=\"3827\" data-end=\"3848\">Electrical Safety<\/h3>\n<p data-start=\"3850\" data-end=\"3971\">Electrical characteristics such as insulation and high-voltage withstand need to comply with the applicable requirements.<\/p>\n<h3 data-section-id=\"1h917a6\" data-start=\"3973\" data-end=\"3990\">Gas Tightness<\/h3>\n<p data-start=\"3992\" data-end=\"4062\">The hermetic housing should maintain the required sealing performance.<\/p>\n<h3 data-section-id=\"qs1af1\" data-start=\"4064\" data-end=\"4082\">Shell Strength<\/h3>\n<p data-start=\"4084\" data-end=\"4174\">The compressor shell should withstand the applicable pneumatic and pressure-related tests.<\/p>\n<h3 data-section-id=\"1r3yl6h\" data-start=\"4176\" data-end=\"4199\">Running Performance<\/h3>\n<p data-start=\"4201\" data-end=\"4282\">The compressor should operate reliably under the applicable operating conditions.<\/p>\n<h3 data-section-id=\"r402im\" data-start=\"4284\" data-end=\"4309\">Resistance to Rusting<\/h3>\n<p data-start=\"4311\" data-end=\"4391\">Applicable parts should meet the requirements relating to resistance to rusting.<\/p>\n<h3 data-section-id=\"2u030g\" data-start=\"4393\" data-end=\"4414\">Protection System<\/h3>\n<p data-start=\"4416\" data-end=\"4535\">Where applicable, the compressor&#8217;s protection system should provide the required protection under specified conditions.<\/p>\n<hr data-start=\"4537\" data-end=\"4540\" \/>\n<h1 data-section-id=\"1ldlg8\" data-start=\"4542\" data-end=\"4582\">Classification of Hermetic Compressors<\/h1>\n<p data-start=\"4584\" data-end=\"4707\">Hermetic Compressors under IS 10617:2018 are classified into categories based on their operating\/back-pressure application.<\/p>\n<h3 data-section-id=\"1mjjokx\" data-start=\"4709\" data-end=\"4736\">Low Back Pressure \u2013 LBP<\/h3>\n<p data-start=\"4738\" data-end=\"4804\">Generally associated with refrigeration and freezing applications.<\/p>\n<h3 data-section-id=\"12yv3y2\" data-start=\"4806\" data-end=\"4867\">Commercial Back Pressure \/ Medium Back Pressure \u2013 CBP\/MBP<\/h3>\n<p data-start=\"4869\" data-end=\"4933\">Generally associated with commercial refrigeration applications.<\/p>\n<h3 data-section-id=\"1vg4i33\" data-start=\"4935\" data-end=\"4963\">High Back Pressure \u2013 HBP<\/h3>\n<p data-start=\"4965\" data-end=\"5049\">Used for applications requiring higher evaporating-temperature operating conditions.<\/p>\n<p data-start=\"5051\" data-end=\"5192\">The BIS Product Manual uses <strong data-start=\"5079\" data-end=\"5103\">LBP, CBP\/MBP and HBP<\/strong> categories for product grouping and licence scope.<\/p>\n<hr data-start=\"5194\" data-end=\"5197\" \/>\n<h1 data-section-id=\"1dr8hy4\" data-start=\"5199\" data-end=\"5221\">Testing Requirements<\/h1>\n<p data-start=\"5223\" data-end=\"5293\">Testing is a major part of BIS Certification for Hermetic Compressors.<\/p>\n<p data-start=\"5295\" data-end=\"5357\">The BIS material for IS 10617:2018 identifies tests including:<\/p>\n<ul data-start=\"5359\" data-end=\"5622\">\n<li data-section-id=\"1v843ee\" data-start=\"5359\" data-end=\"5392\">Compressor Capacity Rating Test<\/li>\n<li data-section-id=\"1kq1xjx\" data-start=\"5393\" data-end=\"5422\">Compressor Performance Test<\/li>\n<li data-section-id=\"1qfumkc\" data-start=\"5423\" data-end=\"5442\">Startability Test<\/li>\n<li data-section-id=\"1vyvclc\" data-start=\"5443\" data-end=\"5462\">Locked Rotor Test<\/li>\n<li data-section-id=\"xwewj6\" data-start=\"5463\" data-end=\"5482\">High Voltage Test<\/li>\n<li data-section-id=\"1eybc47\" data-start=\"5483\" data-end=\"5505\">Leakage Current Test<\/li>\n<li data-section-id=\"1fn1j85\" data-start=\"5506\" data-end=\"5531\">Pneumatic Test of Shell<\/li>\n<li data-section-id=\"1stp9cb\" data-start=\"5532\" data-end=\"5553\">Holding Charge Test<\/li>\n<li data-section-id=\"1o54dmk\" data-start=\"5554\" data-end=\"5569\">Bursting Test<\/li>\n<li data-section-id=\"1mt2u35\" data-start=\"5570\" data-end=\"5593\">Running Overload Test<\/li>\n<li data-section-id=\"1v5aajq\" data-start=\"5594\" data-end=\"5622\">Resistance to Rusting Test<\/li>\n<\/ul>\n<p data-start=\"5624\" data-end=\"5661\">\n<p data-start=\"5663\" data-end=\"5901\">The BIS Product Manual notes that most tests can potentially be completed in a day, except the <strong data-start=\"5758\" data-end=\"5779\">Locked Rotor Test<\/strong> and <strong data-start=\"5784\" data-end=\"5814\">Resistance to Rusting Test<\/strong>, subject to the applicable testing arrangements.<\/p>\n<hr data-start=\"5903\" data-end=\"5906\" \/>\n<h1 data-section-id=\"1qoe188\" data-start=\"5908\" data-end=\"5941\">Compressor Capacity Rating Test<\/h1>\n<p data-start=\"5943\" data-end=\"6026\">The compressor&#8217;s cooling capacity is evaluated under the specified test conditions.<\/p>\n<p data-start=\"6028\" data-end=\"6178\">Capacity testing is particularly important because the compressor needs to deliver the declared performance under the applicable operating conditions.<\/p>\n<p data-start=\"6180\" data-end=\"6408\">The BIS laboratory information currently lists separate testing charges according to cooling-capacity ranges, showing that capacity is an important part of the certification testing process.<\/p>\n<hr data-start=\"6410\" data-end=\"6413\" \/>\n<h1 data-section-id=\"1m6a7g2\" data-start=\"6415\" data-end=\"6434\">Startability Test<\/h1>\n<p data-start=\"6436\" data-end=\"6532\">The startability test evaluates whether the compressor can start under the specified conditions.<\/p>\n<p data-start=\"6534\" data-end=\"6662\">This is important because refrigeration compressors may experience different pressure and electrical conditions during starting.<\/p>\n<hr data-start=\"6664\" data-end=\"6667\" \/>\n<h1 data-section-id=\"a7xj0u\" data-start=\"6669\" data-end=\"6688\">Locked Rotor Test<\/h1>\n<p data-start=\"6690\" data-end=\"6781\">The Locked Rotor Test evaluates the compressor under the applicable locked-rotor condition.<\/p>\n<p data-start=\"6783\" data-end=\"6863\">This is an important electrical and performance-related test under the standard.<\/p>\n<hr data-start=\"6865\" data-end=\"6868\" \/>\n<h1 data-section-id=\"y3w2ws\" data-start=\"6870\" data-end=\"6889\">High Voltage Test<\/h1>\n<p data-start=\"6891\" data-end=\"7035\">The High Voltage Test checks the electrical insulation system of the compressor to ensure that it can withstand the specified electrical stress.<\/p>\n<hr data-start=\"7037\" data-end=\"7040\" \/>\n<h1 data-section-id=\"6jp7q1\" data-start=\"7042\" data-end=\"7064\">Leakage Current Test<\/h1>\n<p data-start=\"7066\" data-end=\"7154\">The Leakage Current Test evaluates leakage current under the applicable test conditions.<\/p>\n<p data-start=\"7156\" data-end=\"7210\">This helps assess electrical safety of the compressor.<\/p>\n<hr data-start=\"7212\" data-end=\"7215\" \/>\n<h1 data-section-id=\"1ke9tln\" data-start=\"7217\" data-end=\"7242\">Pneumatic Test of Shell<\/h1>\n<p data-start=\"7244\" data-end=\"7321\">The compressor shell is tested under the specified pneumatic test conditions.<\/p>\n<p data-start=\"7323\" data-end=\"7397\">The purpose is to verify the integrity of the hermetically sealed housing.<\/p>\n<hr data-start=\"7399\" data-end=\"7402\" \/>\n<h1 data-section-id=\"1vqxfgl\" data-start=\"7404\" data-end=\"7425\">Holding Charge Test<\/h1>\n<p data-start=\"7427\" data-end=\"7556\">The Holding Charge Test evaluates the compressor&#8217;s ability to maintain the specified holding charge without unacceptable leakage.<\/p>\n<hr data-start=\"7558\" data-end=\"7561\" \/>\n<h1 data-section-id=\"1hxirjm\" data-start=\"7563\" data-end=\"7578\">Bursting Test<\/h1>\n<p data-start=\"7580\" data-end=\"7726\">The Bursting Test evaluates the pressure strength of the compressor shell and helps assess its ability to withstand specified pressure conditions.<\/p>\n<hr data-start=\"7728\" data-end=\"7731\" \/>\n<h1 data-section-id=\"hew5i7\" data-start=\"7733\" data-end=\"7756\">Running Overload Test<\/h1>\n<p data-start=\"7758\" data-end=\"7851\">The Running Overload Test evaluates compressor operation under specified overload conditions.<\/p>\n<p data-start=\"7853\" data-end=\"7942\">This helps assess the reliability of the compressor under demanding operating conditions.<\/p>\n<hr data-start=\"7944\" data-end=\"7947\" \/>\n<h1 data-section-id=\"x2t1yg\" data-start=\"7949\" data-end=\"7977\">Resistance to Rusting Test<\/h1>\n<p data-start=\"7979\" data-end=\"8096\">Applicable metallic components are evaluated for resistance to rusting according to the requirements of the standard.<\/p>\n<hr data-start=\"8098\" data-end=\"8101\" \/>\n<h1 data-section-id=\"1agk8md\" data-start=\"8103\" data-end=\"8130\">Raw Material Requirements<\/h1>\n<p data-start=\"8132\" data-end=\"8291\">The BIS Product Manual for IS 10617:2018 indicates <strong data-start=\"8183\" data-end=\"8192\">\u201cNil\u201d<\/strong> under the specific product raw-material requirement field.<\/p>\n<p data-start=\"8293\" data-end=\"8407\">However, manufacturers should still maintain proper control over materials used in the manufacture of compressors.<\/p>\n<p data-start=\"8409\" data-end=\"8442\">Important components may include:<\/p>\n<ul data-start=\"8444\" data-end=\"8622\">\n<li data-section-id=\"17a9vsv\" data-start=\"8444\" data-end=\"8462\">Motor components<\/li>\n<li data-section-id=\"6je13j\" data-start=\"8463\" data-end=\"8486\">Compressor components<\/li>\n<li data-section-id=\"jyly6w\" data-start=\"8487\" data-end=\"8502\">Shell\/housing<\/li>\n<li data-section-id=\"4685ri\" data-start=\"8503\" data-end=\"8536\">Electrical insulation materials<\/li>\n<li data-section-id=\"1p6jvi7\" data-start=\"8537\" data-end=\"8548\">Terminals<\/li>\n<li data-section-id=\"177n2m5\" data-start=\"8549\" data-end=\"8556\">Tubes<\/li>\n<li data-section-id=\"1awk08f\" data-start=\"8557\" data-end=\"8567\">Bearings<\/li>\n<li data-section-id=\"czqnrj\" data-start=\"8568\" data-end=\"8588\">Sealing components<\/li>\n<li data-section-id=\"lsgozf\" data-start=\"8589\" data-end=\"8622\">Refrigeration-system components<\/li>\n<\/ul>\n<p data-start=\"8624\" data-end=\"8795\">Manufacturers should maintain suitable material specifications, supplier information, inspection records and traceability as part of their internal quality-control system.<\/p>\n<hr data-start=\"8797\" data-end=\"8800\" \/>\n<h1 data-section-id=\"4gexsa\" data-start=\"8802\" data-end=\"8830\">Manufacturing Requirements<\/h1>\n<p data-start=\"8832\" data-end=\"8896\">A typical Hermetic Compressor manufacturing process may include:<\/p>\n<ol data-start=\"8898\" data-end=\"9354\">\n<li data-section-id=\"1euiyqz\" data-start=\"8898\" data-end=\"8922\">Component procurement<\/li>\n<li data-section-id=\"1845eui\" data-start=\"8923\" data-end=\"8954\">Incoming material inspection<\/li>\n<li data-section-id=\"ivs5sm\" data-start=\"8955\" data-end=\"8992\">Machining of compressor components<\/li>\n<li data-section-id=\"dfa9eq\" data-start=\"8993\" data-end=\"9023\">Motor component preparation<\/li>\n<li data-section-id=\"1mndd2j\" data-start=\"9024\" data-end=\"9041\">Motor assembly<\/li>\n<li data-section-id=\"1jsrif7\" data-start=\"9042\" data-end=\"9074\">Compressor mechanism assembly<\/li>\n<li data-section-id=\"m7m06c\" data-start=\"9075\" data-end=\"9099\">Electrical connection<\/li>\n<li data-section-id=\"1gw0bb1\" data-start=\"9100\" data-end=\"9125\">Housing\/shell assembly<\/li>\n<li data-section-id=\"hgjpvi\" data-start=\"9126\" data-end=\"9147\">Welding or brazing<\/li>\n<li data-section-id=\"y7wkmc\" data-start=\"9148\" data-end=\"9180\">Refrigerant-side preparation<\/li>\n<li data-section-id=\"1pwamdu\" data-start=\"9181\" data-end=\"9195\">Evacuation<\/li>\n<li data-section-id=\"1a797d9\" data-start=\"9196\" data-end=\"9223\">Charging\/holding charge<\/li>\n<li data-section-id=\"tswghd\" data-start=\"9224\" data-end=\"9246\">Electrical testing<\/li>\n<li data-section-id=\"bp46t4\" data-start=\"9247\" data-end=\"9266\">Leakage testing<\/li>\n<li data-section-id=\"xl9wu9\" data-start=\"9267\" data-end=\"9290\">Performance testing<\/li>\n<li data-section-id=\"1m2zuvy\" data-start=\"9291\" data-end=\"9311\">Final inspection<\/li>\n<li data-section-id=\"1tb3jbt\" data-start=\"9312\" data-end=\"9342\">Identification and marking<\/li>\n<li data-section-id=\"g5tgor\" data-start=\"9343\" data-end=\"9354\">Packing<\/li>\n<\/ol>\n<p data-start=\"9356\" data-end=\"9437\">The actual manufacturing process depends on the compressor design and technology.<\/p>\n<p data-start=\"9439\" data-end=\"9521\">Process controls should be maintained to ensure consistent performance and safety.<\/p>\n<hr data-start=\"9523\" data-end=\"9526\" \/>\n<h1 data-section-id=\"ayo1bh\" data-start=\"9528\" data-end=\"9555\">BIS Certification Process<\/h1>\n<h2 data-section-id=\"5ubjzc\" data-start=\"9557\" data-end=\"9587\">Step 1 \u2013 Product Assessment<\/h2>\n<p data-start=\"9589\" data-end=\"9642\">The compressor is reviewed against <strong data-start=\"9624\" data-end=\"9641\">IS 10617:2018<\/strong>.<\/p>\n<p data-start=\"9644\" data-end=\"9752\">Important characteristics such as compressor category, phase, cooling capacity and mechanism are identified.<\/p>\n<h2 data-section-id=\"pq43wi\" data-start=\"9754\" data-end=\"9782\">Step 2 \u2013 Product Grouping<\/h2>\n<p data-start=\"9784\" data-end=\"9857\">Product grouping is finalised according to the applicable BIS guidelines.<\/p>\n<p data-start=\"9859\" data-end=\"9896\">The BIS grouping guidelines consider:<\/p>\n<ul data-start=\"9898\" data-end=\"9967\">\n<li data-section-id=\"1o47ue\" data-start=\"9898\" data-end=\"9903\">LBP<\/li>\n<li data-section-id=\"1ochf3d\" data-start=\"9904\" data-end=\"9913\">CBP\/MBP<\/li>\n<li data-section-id=\"1o44he\" data-start=\"9914\" data-end=\"9919\">HBP<\/li>\n<li data-section-id=\"xm649p\" data-start=\"9920\" data-end=\"9934\">Single phase<\/li>\n<li data-section-id=\"12cozxl\" data-start=\"9935\" data-end=\"9948\">Three phase<\/li>\n<li data-section-id=\"jw9xlf\" data-start=\"9949\" data-end=\"9967\">Cooling capacity<\/li>\n<\/ul>\n<p data-start=\"9969\" data-end=\"10008\">\n<h2 data-section-id=\"14jrd5i\" data-start=\"10010\" data-end=\"10040\">Step 3 \u2013 Scope Finalisation<\/h2>\n<p data-start=\"10042\" data-end=\"10123\">The manufacturer declares the varieties intended to be covered under the licence.<\/p>\n<p data-start=\"10125\" data-end=\"10253\">The licence scope may be restricted according to manufacturing and testing capabilities.<\/p>\n<h2 data-section-id=\"btt0s2\" data-start=\"10255\" data-end=\"10285\">Step 4 \u2013 Factory Assessment<\/h2>\n<p data-start=\"10287\" data-end=\"10337\">Manufacturing and testing facilities are reviewed.<\/p>\n<h2 data-section-id=\"16mjvk3\" data-start=\"10339\" data-end=\"10364\">Step 5 \u2013 Documentation<\/h2>\n<p data-start=\"10366\" data-end=\"10424\">Required documents and technical information are prepared.<\/p>\n<h2 data-section-id=\"1t4bp2l\" data-start=\"10426\" data-end=\"10456\">Step 6 \u2013 Sample Preparation<\/h2>\n<p data-start=\"10458\" data-end=\"10548\">Representative compressors are selected according to the applicable grouping requirements.<\/p>\n<h2 data-section-id=\"1bh4pl2\" data-start=\"10550\" data-end=\"10580\">Step 7 \u2013 Laboratory Testing<\/h2>\n<p data-start=\"10582\" data-end=\"10623\">Samples are tested against IS 10617:2018.<\/p>\n<h2 data-section-id=\"pat1r2\" data-start=\"10625\" data-end=\"10652\">Step 8 \u2013 BIS Application<\/h2>\n<p data-start=\"10654\" data-end=\"10718\">The manufacturer submits the application and required documents.<\/p>\n<h2 data-section-id=\"1l6b2e2\" data-start=\"10720\" data-end=\"10752\">Step 9 \u2013 Application Scrutiny<\/h2>\n<p data-start=\"10754\" data-end=\"10809\">BIS reviews the application and supporting information.<\/p>\n<h2 data-section-id=\"80dr\" data-start=\"10811\" data-end=\"10842\">Step 10 \u2013 Factory Inspection<\/h2>\n<p data-start=\"10844\" data-end=\"10935\">The manufacturing facility is assessed according to the applicable certification procedure.<\/p>\n<h2 data-section-id=\"z0dt9z\" data-start=\"10937\" data-end=\"10969\">Step 11 \u2013 Observation Closure<\/h2>\n<p data-start=\"10971\" data-end=\"11022\">Any observations or non-conformities are addressed.<\/p>\n<h2 data-section-id=\"aa6dwi\" data-start=\"11024\" data-end=\"11050\">Step 12 \u2013 Licence Grant<\/h2>\n<p data-start=\"11052\" data-end=\"11158\">After successful completion of the applicable requirements, BIS grants the licence for the approved scope.<\/p>\n<hr data-start=\"11160\" data-end=\"11163\" \/>\n<h1 data-section-id=\"14s1v1v\" data-start=\"11165\" data-end=\"11185\">Documents Required<\/h1>\n<p data-start=\"11187\" data-end=\"11217\">Typical documents may include:<\/p>\n<ul data-start=\"11219\" data-end=\"11792\">\n<li data-section-id=\"laj0jm\" data-start=\"11219\" data-end=\"11251\">Company registration documents<\/li>\n<li data-section-id=\"a8o83y\" data-start=\"11252\" data-end=\"11275\">Factory address proof<\/li>\n<li data-section-id=\"17ibqzq\" data-start=\"11276\" data-end=\"11292\">Factory layout<\/li>\n<li data-section-id=\"18vosvl\" data-start=\"11293\" data-end=\"11321\">Manufacturing process flow<\/li>\n<li data-section-id=\"ef1hg\" data-start=\"11322\" data-end=\"11338\">Machinery list<\/li>\n<li data-section-id=\"1dp9mql\" data-start=\"11339\" data-end=\"11366\">Compressor specifications<\/li>\n<li data-section-id=\"1ipfuuo\" data-start=\"11367\" data-end=\"11385\">Product drawings<\/li>\n<li data-section-id=\"15son13\" data-start=\"11386\" data-end=\"11408\">Technical datasheets<\/li>\n<li data-section-id=\"14brzoe\" data-start=\"11409\" data-end=\"11435\">Compressor model details<\/li>\n<li data-section-id=\"1ynwda\" data-start=\"11436\" data-end=\"11462\">Product grouping details<\/li>\n<li data-section-id=\"1l4jbc8\" data-start=\"11463\" data-end=\"11495\">Raw-material\/component details<\/li>\n<li data-section-id=\"7h9blc\" data-start=\"11496\" data-end=\"11518\">Supplier information<\/li>\n<li data-section-id=\"1fo8gvq\" data-start=\"11519\" data-end=\"11543\">Testing equipment list<\/li>\n<li data-section-id=\"1ymt51g\" data-start=\"11544\" data-end=\"11570\">Calibration certificates<\/li>\n<li data-section-id=\"16dybms\" data-start=\"11571\" data-end=\"11594\">Internal test reports<\/li>\n<li data-section-id=\"qg7q9h\" data-start=\"11595\" data-end=\"11615\">Production records<\/li>\n<li data-section-id=\"1mwzt1k\" data-start=\"11616\" data-end=\"11636\">Inspection records<\/li>\n<li data-section-id=\"ku0u1o\" data-start=\"11637\" data-end=\"11659\">Quality-control plan<\/li>\n<li data-section-id=\"684x8w\" data-start=\"11660\" data-end=\"11681\">Product photographs<\/li>\n<li data-section-id=\"74k6c5\" data-start=\"11682\" data-end=\"11701\">Packaging details<\/li>\n<li data-section-id=\"1hcgcf\" data-start=\"11702\" data-end=\"11719\">Marking details<\/li>\n<li data-section-id=\"lp672w\" data-start=\"11720\" data-end=\"11752\">Authorised signatory documents<\/li>\n<li data-section-id=\"8zjtnv\" data-start=\"11753\" data-end=\"11792\">Trademark documents, where applicable<\/li>\n<\/ul>\n<p data-start=\"11794\" data-end=\"11886\">The exact document requirement depends on the manufacturer and proposed certification scope.<\/p>\n<hr data-start=\"11888\" data-end=\"11891\" \/>\n<h1 data-section-id=\"1mfuv2k\" data-start=\"11893\" data-end=\"11913\">Factory Inspection<\/h1>\n<p data-start=\"11915\" data-end=\"12013\">During factory inspection, different aspects of manufacturing and quality control may be reviewed.<\/p>\n<h3 data-section-id=\"ihy9m0\" data-start=\"12015\" data-end=\"12042\">Manufacturing Machinery<\/h3>\n<p data-start=\"12044\" data-end=\"12139\">Equipment used for machining, assembly, welding\/brazing, testing and finishing may be assessed.<\/p>\n<h3 data-section-id=\"1y0dmwj\" data-start=\"12141\" data-end=\"12163\">Testing Facilities<\/h3>\n<p data-start=\"12165\" data-end=\"12296\">The manufacturer should have appropriate testing and measuring arrangements according to the applicable certification requirements.<\/p>\n<h3 data-section-id=\"wzkpnw\" data-start=\"12298\" data-end=\"12313\">Calibration<\/h3>\n<p data-start=\"12315\" data-end=\"12396\">Applicable measuring and testing equipment should have valid calibration records.<\/p>\n<h3 data-section-id=\"8x4vxe\" data-start=\"12398\" data-end=\"12420\">Production Control<\/h3>\n<p data-start=\"12422\" data-end=\"12492\">Important manufacturing processes should be controlled and documented.<\/p>\n<h3 data-section-id=\"1dr5p4y\" data-start=\"12494\" data-end=\"12523\">Electrical Safety Testing<\/h3>\n<p data-start=\"12525\" data-end=\"12599\">Suitable arrangements should be available for applicable electrical tests.<\/p>\n<h3 data-section-id=\"1nubl4\" data-start=\"12601\" data-end=\"12624\">Performance Testing<\/h3>\n<p data-start=\"12626\" data-end=\"12723\">The manufacturer should have appropriate arrangements for performance-related checks as required.<\/p>\n<h3 data-section-id=\"1gmxrcg\" data-start=\"12725\" data-end=\"12744\">Leakage Testing<\/h3>\n<p data-start=\"12746\" data-end=\"12830\">Suitable procedures should be maintained for detecting refrigerant or shell leakage.<\/p>\n<h3 data-section-id=\"1pqkjmg\" data-start=\"12832\" data-end=\"12843\">Records<\/h3>\n<p data-start=\"12845\" data-end=\"12915\">Production, inspection and test records should be properly maintained.<\/p>\n<h3 data-section-id=\"19oqqr0\" data-start=\"12917\" data-end=\"12938\">Finished Products<\/h3>\n<p data-start=\"12940\" data-end=\"13013\">Finished compressors should be properly identified, stored and traceable.<\/p>\n<hr data-start=\"13015\" data-end=\"13018\" \/>\n<h1 data-section-id=\"rgya45\" data-start=\"13020\" data-end=\"13044\">Product Quality Checks<\/h1>\n<p data-start=\"13046\" data-end=\"13113\">Manufacturers should maintain quality checks throughout production.<\/p>\n<p data-start=\"13115\" data-end=\"13133\">These may include:<\/p>\n<ul data-start=\"13135\" data-end=\"13415\">\n<li data-section-id=\"1petowv\" data-start=\"13135\" data-end=\"13166\">Incoming component inspection<\/li>\n<li data-section-id=\"16uwj7v\" data-start=\"13167\" data-end=\"13191\">Dimensional inspection<\/li>\n<li data-section-id=\"1u0zud9\" data-start=\"13192\" data-end=\"13210\">Motor inspection<\/li>\n<li data-section-id=\"19o8ky0\" data-start=\"13211\" data-end=\"13232\">Assembly inspection<\/li>\n<li data-section-id=\"1wniq1f\" data-start=\"13233\" data-end=\"13252\">Electrical checks<\/li>\n<li data-section-id=\"vvq6ul\" data-start=\"13253\" data-end=\"13272\">Insulation checks<\/li>\n<li data-section-id=\"7wzd25\" data-start=\"13273\" data-end=\"13289\">Leakage checks<\/li>\n<li data-section-id=\"hameq0\" data-start=\"13290\" data-end=\"13308\">Shell inspection<\/li>\n<li data-section-id=\"gz5n7e\" data-start=\"13309\" data-end=\"13334\">Pressure-related checks<\/li>\n<li data-section-id=\"1a6on2d\" data-start=\"13335\" data-end=\"13355\">Performance checks<\/li>\n<li data-section-id=\"fod1hl\" data-start=\"13356\" data-end=\"13373\">Capacity checks<\/li>\n<li data-section-id=\"a9sjtm\" data-start=\"13374\" data-end=\"13392\">Final inspection<\/li>\n<li data-section-id=\"1kxeg2s\" data-start=\"13393\" data-end=\"13415\">Marking verification<\/li>\n<\/ul>\n<p data-start=\"13417\" data-end=\"13519\">Consistent internal quality checks can help manufacturers identify problems before formal BIS testing.<\/p>\n<hr data-start=\"13521\" data-end=\"13524\" \/>\n<h1 data-section-id=\"7kcn5y\" data-start=\"13526\" data-end=\"13576\">Common Reasons for Testing\/Certification Failure<\/h1>\n<p data-start=\"13578\" data-end=\"13621\">Manufacturers may face problems because of:<\/p>\n<ul data-start=\"13623\" data-end=\"14108\">\n<li data-section-id=\"1lyyp0l\" data-start=\"13623\" data-end=\"13651\">Incorrect product grouping<\/li>\n<li data-section-id=\"u79cra\" data-start=\"13652\" data-end=\"13689\">Incorrect declared cooling capacity<\/li>\n<li data-section-id=\"posrc3\" data-start=\"13690\" data-end=\"13714\">Inadequate performance<\/li>\n<li data-section-id=\"8cafsa\" data-start=\"13715\" data-end=\"13737\">Startability failure<\/li>\n<li data-section-id=\"1h6z68w\" data-start=\"13738\" data-end=\"13765\">Locked rotor test failure<\/li>\n<li data-section-id=\"1p571jz\" data-start=\"13766\" data-end=\"13793\">High-voltage test failure<\/li>\n<li data-section-id=\"lsq875\" data-start=\"13794\" data-end=\"13819\">Leakage current failure<\/li>\n<li data-section-id=\"1k2u4ba\" data-start=\"13820\" data-end=\"13835\">Shell leakage<\/li>\n<li data-section-id=\"o6b5lu\" data-start=\"13836\" data-end=\"13860\">Pneumatic test failure<\/li>\n<li data-section-id=\"12jkoho\" data-start=\"13861\" data-end=\"13884\">Bursting test failure<\/li>\n<li data-section-id=\"1pnh2kn\" data-start=\"13885\" data-end=\"13911\">Running overload failure<\/li>\n<li data-section-id=\"fgyns8\" data-start=\"13912\" data-end=\"13929\">Rusting failure<\/li>\n<li data-section-id=\"megstq\" data-start=\"13930\" data-end=\"13961\">Inadequate testing facilities<\/li>\n<li data-section-id=\"1ritz6f\" data-start=\"13962\" data-end=\"13990\">Incorrect sample selection<\/li>\n<li data-section-id=\"jaist4\" data-start=\"13991\" data-end=\"14020\">Missing calibration records<\/li>\n<li data-section-id=\"bvdcok\" data-start=\"14021\" data-end=\"14047\">Incomplete documentation<\/li>\n<li data-section-id=\"15z8wbz\" data-start=\"14048\" data-end=\"14082\">Factory not ready for assessment<\/li>\n<li data-section-id=\"qnzs1c\" data-start=\"14083\" data-end=\"14108\">Incorrect product scope<\/li>\n<\/ul>\n<p data-start=\"14110\" data-end=\"14199\">Proper product assessment and pre-testing can help reduce avoidable certification delays.<\/p>\n<hr data-start=\"14201\" data-end=\"14204\" \/>\n<h1 data-section-id=\"868b57\" data-start=\"14206\" data-end=\"14219\">BIS Marking<\/h1>\n<p data-start=\"14221\" data-end=\"14322\">After grant of the BIS licence, the manufacturer must follow the applicable BIS marking requirements.<\/p>\n<p data-start=\"14324\" data-end=\"14360\">The manufacturer should ensure that:<\/p>\n<ul data-start=\"14362\" data-end=\"14615\">\n<li data-section-id=\"577kkj\" data-start=\"14362\" data-end=\"14398\">Product identification is correct.<\/li>\n<li data-section-id=\"1wrlf68\" data-start=\"14399\" data-end=\"14458\">Applicable standard information is correctly represented.<\/li>\n<li data-section-id=\"1upmv99\" data-start=\"14459\" data-end=\"14502\">BIS licence details are used as required.<\/li>\n<li data-section-id=\"1sasxk7\" data-start=\"14503\" data-end=\"14566\">BIS Standard Mark is applied according to licence conditions.<\/li>\n<li data-section-id=\"gtlneh\" data-start=\"14567\" data-end=\"14615\">Product and packaging information is accurate.<\/li>\n<\/ul>\n<p data-start=\"14617\" data-end=\"14735\">The exact marking requirements should be followed from the applicable BIS licence and current certification documents.<\/p>\n<hr data-start=\"14737\" data-end=\"14740\" \/>\n<h1 data-section-id=\"yixlnz\" data-start=\"14742\" data-end=\"14771\">Who Needs BIS Certification<\/h1>\n<p data-start=\"14773\" data-end=\"14827\">BIS certification may be relevant to manufacturers of:<\/p>\n<ul data-start=\"14829\" data-end=\"15089\">\n<li data-section-id=\"acgcuh\" data-start=\"14829\" data-end=\"14851\">Hermetic Compressors<\/li>\n<li data-section-id=\"4kgx8n\" data-start=\"14852\" data-end=\"14879\">Refrigeration Compressors<\/li>\n<li data-section-id=\"1pi08wi\" data-start=\"14880\" data-end=\"14906\">Refrigerator Compressors<\/li>\n<li data-section-id=\"ssu4op\" data-start=\"14907\" data-end=\"14928\">Freezer Compressors<\/li>\n<li data-section-id=\"d9grms\" data-start=\"14929\" data-end=\"14959\">Air-Conditioning Compressors<\/li>\n<li data-section-id=\"1g0kt6j\" data-start=\"14960\" data-end=\"14998\">Commercial Refrigeration Compressors<\/li>\n<li data-section-id=\"1ak7nwm\" data-start=\"14999\" data-end=\"15026\">Reciprocating Compressors<\/li>\n<li data-section-id=\"be935v\" data-start=\"15027\" data-end=\"15047\">Rotary Compressors<\/li>\n<li data-section-id=\"1oxisbx\" data-start=\"15048\" data-end=\"15068\">Scroll Compressors<\/li>\n<li data-section-id=\"1rvwf99\" data-start=\"15069\" data-end=\"15089\">Linear Compressors<\/li>\n<\/ul>\n<p data-start=\"15091\" data-end=\"15224\">IS 10617:2018 is listed by BIS under the compulsory Scheme-I product certification framework.<\/p>\n<hr data-start=\"15226\" data-end=\"15229\" \/>\n<h1 data-section-id=\"1htfr7x\" data-start=\"15231\" data-end=\"15237\">Cost<\/h1>\n<p data-start=\"15239\" data-end=\"15322\">The total cost of BIS certification depends on the product and certification scope.<\/p>\n<p data-start=\"15324\" data-end=\"15355\">Important cost factors include:<\/p>\n<ul data-start=\"15357\" data-end=\"15629\">\n<li data-section-id=\"wndo83\" data-start=\"15357\" data-end=\"15382\">BIS application charges<\/li>\n<li data-section-id=\"xel55g\" data-start=\"15383\" data-end=\"15411\">Laboratory testing charges<\/li>\n<li data-section-id=\"ws3gw1\" data-start=\"15412\" data-end=\"15436\">Cooling-capacity range<\/li>\n<li data-section-id=\"9rnzvz\" data-start=\"15437\" data-end=\"15470\">Number of compressor categories<\/li>\n<li data-section-id=\"12ietsu\" data-start=\"15471\" data-end=\"15489\">Number of phases<\/li>\n<li data-section-id=\"13ujn9a\" data-start=\"15490\" data-end=\"15508\">Number of models<\/li>\n<li data-section-id=\"1w02i1o\" data-start=\"15509\" data-end=\"15527\">Product grouping<\/li>\n<li data-section-id=\"1ci9n36\" data-start=\"15528\" data-end=\"15548\">Factory inspection<\/li>\n<li data-section-id=\"hrwpmc\" data-start=\"15549\" data-end=\"15568\">Testing equipment<\/li>\n<li data-section-id=\"zkwwle\" data-start=\"15569\" data-end=\"15582\">Calibration<\/li>\n<li data-section-id=\"w80kxv\" data-start=\"15583\" data-end=\"15607\">Retesting, if required<\/li>\n<li data-section-id=\"1q8f3t4\" data-start=\"15608\" data-end=\"15629\">Consultancy charges<\/li>\n<\/ul>\n<p data-start=\"15631\" data-end=\"15948\">Laboratory charges for IS 10617:2018 vary substantially with cooling-capacity range. BIS LIMS currently lists different testing charges for different capacity ranges, so manufacturers should obtain the applicable current laboratory quotation before budgeting the certification.<\/p>\n<hr data-start=\"15950\" data-end=\"15953\" \/>\n<h1 data-section-id=\"1evq9p\" data-start=\"15955\" data-end=\"15965\">Timeline<\/h1>\n<p data-start=\"15967\" data-end=\"16005\">The certification timeline depends on:<\/p>\n<ul data-start=\"16007\" data-end=\"16236\">\n<li data-section-id=\"r86jf7\" data-start=\"16007\" data-end=\"16026\">Product readiness<\/li>\n<li data-section-id=\"1w02i1o\" data-start=\"16027\" data-end=\"16045\">Product grouping<\/li>\n<li data-section-id=\"10w0ysy\" data-start=\"16046\" data-end=\"16068\">Testing requirements<\/li>\n<li data-section-id=\"1n720d6\" data-start=\"16069\" data-end=\"16094\">Laboratory availability<\/li>\n<li data-section-id=\"1l0m60n\" data-start=\"16095\" data-end=\"16115\">Sample preparation<\/li>\n<li data-section-id=\"xkasf8\" data-start=\"16116\" data-end=\"16130\">Test results<\/li>\n<li data-section-id=\"1au0k3e\" data-start=\"16131\" data-end=\"16146\">Documentation<\/li>\n<li data-section-id=\"czyv2v\" data-start=\"16147\" data-end=\"16173\">BIS application scrutiny<\/li>\n<li data-section-id=\"1213b4c\" data-start=\"16174\" data-end=\"16193\">Factory readiness<\/li>\n<li data-section-id=\"1ci9n36\" data-start=\"16194\" data-end=\"16214\">Factory inspection<\/li>\n<li data-section-id=\"2xyyqj\" data-start=\"16215\" data-end=\"16236\">Observation closure<\/li>\n<\/ul>\n<p data-start=\"16238\" data-end=\"16437\">Hermetic Compressor certification can require significant laboratory testing, particularly for performance and capacity-related requirements, so manufacturers should plan the testing stage carefully.<\/p>\n<hr data-start=\"16439\" data-end=\"16442\" \/>\n<h1 data-section-id=\"b8y6te\" data-start=\"16444\" data-end=\"16454\">Benefits<\/h1>\n<h3 data-section-id=\"1s6jna8\" data-start=\"16456\" data-end=\"16475\">Product Quality<\/h3>\n<p data-start=\"16477\" data-end=\"16578\">Testing helps verify the compressor&#8217;s conformity with applicable performance and safety requirements.<\/p>\n<h3 data-section-id=\"1j9zvdg\" data-start=\"16580\" data-end=\"16601\">Electrical Safety<\/h3>\n<p data-start=\"16603\" data-end=\"16679\">Applicable electrical testing helps assess important safety characteristics.<\/p>\n<h3 data-section-id=\"10ywkiv\" data-start=\"16681\" data-end=\"16709\">Performance Verification<\/h3>\n<p data-start=\"16711\" data-end=\"16809\">Capacity and performance testing helps establish conformity with specified operating requirements.<\/p>\n<h3 data-section-id=\"k08kti\" data-start=\"16811\" data-end=\"16834\">Customer Confidence<\/h3>\n<p data-start=\"16836\" data-end=\"16914\">Certification can provide greater confidence to OEMs and industrial customers.<\/p>\n<h3 data-section-id=\"s62ca3\" data-start=\"16916\" data-end=\"16937\">Market Acceptance<\/h3>\n<p data-start=\"16939\" data-end=\"17014\">BIS certification supports market access where certification is compulsory.<\/p>\n<h3 data-section-id=\"19kw9oh\" data-start=\"17016\" data-end=\"17041\">Manufacturing Control<\/h3>\n<p data-start=\"17043\" data-end=\"17118\">The certification process encourages systematic quality-control procedures.<\/p>\n<h3 data-section-id=\"517a1m\" data-start=\"17120\" data-end=\"17144\">Business Credibility<\/h3>\n<p data-start=\"17146\" data-end=\"17258\">BIS certification can strengthen the manufacturer&#8217;s position in the refrigeration and air-conditioning industry.<\/p>\n<hr data-start=\"17260\" data-end=\"17263\" \/>\n<h1 data-section-id=\"p0ylzf\" data-start=\"17265\" data-end=\"17294\">Why Choose Qualitance India<\/h1>\n<p data-start=\"17296\" data-end=\"17449\"><strong data-start=\"17296\" data-end=\"17316\">Qualitance India<\/strong> provides BIS Certification Consultancy for manufacturers dealing with electrical, mechanical, refrigeration and industrial products.<\/p>\n<p data-start=\"17451\" data-end=\"17538\">For <strong data-start=\"17455\" data-end=\"17500\">Hermetic Compressors as per IS 10617:2018<\/strong>, our consultancy support can include:<\/p>\n<ul data-start=\"17540\" data-end=\"17981\">\n<li data-section-id=\"1mfdgr4\" data-start=\"17540\" data-end=\"17574\">Product applicability assessment<\/li>\n<li data-section-id=\"1eoki8n\" data-start=\"17575\" data-end=\"17609\">IS 10617:2018 requirement review<\/li>\n<li data-section-id=\"ykvcbu\" data-start=\"17610\" data-end=\"17637\">Product grouping guidance<\/li>\n<li data-section-id=\"1awmyv6\" data-start=\"17638\" data-end=\"17673\">Cooling-capacity scope assessment<\/li>\n<li data-section-id=\"8z5yq7\" data-start=\"17674\" data-end=\"17715\">Single-phase\/three-phase scope guidance<\/li>\n<li data-section-id=\"16jeez9\" data-start=\"17716\" data-end=\"17739\">Documentation support<\/li>\n<li data-section-id=\"1vcb8rl\" data-start=\"17740\" data-end=\"17769\">Sample preparation guidance<\/li>\n<li data-section-id=\"18njl3m\" data-start=\"17770\" data-end=\"17803\">Laboratory testing coordination<\/li>\n<li data-section-id=\"maajyk\" data-start=\"17804\" data-end=\"17832\">BIS application assistance<\/li>\n<li data-section-id=\"sy9ixn\" data-start=\"17833\" data-end=\"17865\">Factory inspection preparation<\/li>\n<li data-section-id=\"14qpm0y\" data-start=\"17866\" data-end=\"17894\">Testing equipment guidance<\/li>\n<li data-section-id=\"1bxrev1\" data-start=\"17895\" data-end=\"17926\">Quality-control documentation<\/li>\n<li data-section-id=\"3i8g1g\" data-start=\"17927\" data-end=\"17956\">Observation closure support<\/li>\n<li data-section-id=\"kobqql\" data-start=\"17957\" data-end=\"17981\">BIS licence assistance<\/li>\n<\/ul>\n<p data-start=\"17983\" data-end=\"18156\">Our objective is to help manufacturers manage the certification process systematically from initial product assessment through testing, factory inspection and licence grant.<\/p>\n<hr data-start=\"18158\" data-end=\"18161\" \/>\n<h1 data-section-id=\"1n842zo\" data-start=\"18163\" data-end=\"18181\">Complete Process<\/h1>\n<p data-start=\"18183\" data-end=\"18711\"><strong data-start=\"18183\" data-end=\"18209\">Product Identification<\/strong><br data-start=\"18209\" data-end=\"18212\" \/>\u2193<br data-start=\"18213\" data-end=\"18216\" \/><strong data-start=\"18216\" data-end=\"18252\">IS 10617:2018 Requirement Review<\/strong><br data-start=\"18252\" data-end=\"18255\" \/>\u2193<br data-start=\"18256\" data-end=\"18259\" \/><strong data-start=\"18259\" data-end=\"18297\">LBP \/ CBP-MBP \/ HBP Classification<\/strong><br data-start=\"18297\" data-end=\"18300\" \/>\u2193<br data-start=\"18301\" data-end=\"18304\" \/><strong data-start=\"18304\" data-end=\"18335\">Cooling Capacity Assessment<\/strong><br data-start=\"18335\" data-end=\"18338\" \/>\u2193<br data-start=\"18339\" data-end=\"18342\" \/><strong data-start=\"18342\" data-end=\"18383\">Single Phase \/ Three Phase Assessment<\/strong><br data-start=\"18383\" data-end=\"18386\" \/>\u2193<br data-start=\"18387\" data-end=\"18390\" \/><strong data-start=\"18390\" data-end=\"18410\">Product Grouping<\/strong><br data-start=\"18410\" data-end=\"18413\" \/>\u2193<br data-start=\"18414\" data-end=\"18417\" \/><strong data-start=\"18417\" data-end=\"18453\">Certification Scope Finalisation<\/strong><br data-start=\"18453\" data-end=\"18456\" \/>\u2193<br data-start=\"18457\" data-end=\"18460\" \/><strong data-start=\"18460\" data-end=\"18489\">Documentation Preparation<\/strong><br data-start=\"18489\" data-end=\"18492\" \/>\u2193<br data-start=\"18493\" data-end=\"18496\" \/><strong data-start=\"18496\" data-end=\"18516\">Sample Selection<\/strong><br data-start=\"18516\" data-end=\"18519\" \/>\u2193<br data-start=\"18520\" data-end=\"18523\" \/><strong data-start=\"18523\" data-end=\"18545\">Laboratory Testing<\/strong><br data-start=\"18545\" data-end=\"18548\" \/>\u2193<br data-start=\"18549\" data-end=\"18552\" \/><strong data-start=\"18552\" data-end=\"18571\">BIS Application<\/strong><br data-start=\"18571\" data-end=\"18574\" \/>\u2193<br data-start=\"18575\" data-end=\"18578\" \/><strong data-start=\"18578\" data-end=\"18602\">Application Scrutiny<\/strong><br data-start=\"18602\" data-end=\"18605\" \/>\u2193<br data-start=\"18606\" data-end=\"18609\" \/><strong data-start=\"18609\" data-end=\"18631\">Factory Inspection<\/strong><br data-start=\"18631\" data-end=\"18634\" \/>\u2193<br data-start=\"18635\" data-end=\"18638\" \/><strong data-start=\"18638\" data-end=\"18661\">Observation Closure<\/strong><br data-start=\"18661\" data-end=\"18664\" \/>\u2193<br data-start=\"18665\" data-end=\"18668\" \/><strong data-start=\"18668\" data-end=\"18689\">BIS Licence Grant<\/strong><br data-start=\"18689\" data-end=\"18692\" \/>\u2193<br data-start=\"18693\" data-end=\"18696\" \/><strong data-start=\"18696\" data-end=\"18711\">BIS Marking<\/strong><\/p>\n<p data-start=\"18713\" data-end=\"18977\">The BIS Product Manual specifies grouping based on compressor category, phase and cooling capacity, with the highest cooling capacity from each applicable category tested separately for single-phase and three-phase products.<\/p>\n<hr data-start=\"18979\" data-end=\"18982\" \/>\n<h1 data-section-id=\"aayzby\" data-start=\"18984\" data-end=\"19015\">20 Frequently Asked Questions<\/h1>\n<h3 data-section-id=\"7vjq5o\" data-start=\"19017\" data-end=\"19046\">1. What is IS 10617:2018?<\/h3>\n<p data-start=\"19048\" data-end=\"19148\">IS 10617:2018 is the Indian Standard for <strong data-start=\"19089\" data-end=\"19147\">Hermetic Compressors \u2014 Specification (Second Revision)<\/strong>.<\/p>\n<h3 data-section-id=\"21hup2\" data-start=\"19150\" data-end=\"19187\">2. What is a Hermetic Compressor?<\/h3>\n<p data-start=\"19189\" data-end=\"19306\">It is a motor-compressor assembly enclosed in a gas-tight housing with no normal access to the internal moving parts.<\/p>\n<h3 data-section-id=\"16vm2p9\" data-start=\"19308\" data-end=\"19370\">3. Is BIS Certification required for Hermetic Compressors?<\/h3>\n<p data-start=\"19372\" data-end=\"19499\">IS 10617:2018 is included in BIS&#8217;s compulsory Scheme-I product certification framework.<\/p>\n<h3 data-section-id=\"zx2spl\" data-start=\"19501\" data-end=\"19546\">4. What types of compressors are covered?<\/h3>\n<p data-start=\"19548\" data-end=\"19668\">The standard covers reciprocating, linear, rotary and scroll pumping mechanisms.<\/p>\n<h3 data-section-id=\"xvk30g\" data-start=\"19670\" data-end=\"19723\">5. What categories are used for product grouping?<\/h3>\n<p data-start=\"19725\" data-end=\"19899\">The BIS grouping guidelines identify LBP, CBP\/MBP and HBP categories and consider single-phase and three-phase compressors separately.<\/p>\n<h3 data-section-id=\"ssy0en\" data-start=\"19901\" data-end=\"19920\">6. What is LBP?<\/h3>\n<p data-start=\"19922\" data-end=\"20037\">LBP means <strong data-start=\"19932\" data-end=\"19953\">Low Back Pressure<\/strong>, generally associated with low-temperature refrigeration and freezing applications.<\/p>\n<h3 data-section-id=\"1opb3g1\" data-start=\"20039\" data-end=\"20062\">7. What is CBP\/MBP?<\/h3>\n<p data-start=\"20064\" data-end=\"20146\">CBP\/MBP refers to <strong data-start=\"20082\" data-end=\"20133\">Commercial Back Pressure \/ Medium Back Pressure<\/strong> compressors.<\/p>\n<h3 data-section-id=\"1ba9if9\" data-start=\"20148\" data-end=\"20167\">8. What is HBP?<\/h3>\n<p data-start=\"20169\" data-end=\"20285\">HBP means <strong data-start=\"20179\" data-end=\"20201\">High Back Pressure<\/strong> and refers to compressors intended for higher evaporating-temperature applications.<\/p>\n<h3 data-section-id=\"gx1x6m\" data-start=\"20287\" data-end=\"20318\">9. What tests are required?<\/h3>\n<p data-start=\"20320\" data-end=\"20553\">Tests can include capacity rating, performance, startability, locked rotor, high voltage, leakage current, pneumatic shell, holding charge, bursting, running overload and resistance to rusting.<\/p>\n<h3 data-section-id=\"r1lx6w\" data-start=\"20555\" data-end=\"20600\">10. Is cooling capacity testing required?<\/h3>\n<p data-start=\"20602\" data-end=\"20689\">Yes. Compressor Capacity Rating Testing is part of the applicable testing requirements.<\/p>\n<h3 data-section-id=\"mues4g\" data-start=\"20691\" data-end=\"20737\">11. Is electrical safety testing required?<\/h3>\n<p data-start=\"20739\" data-end=\"20810\">Yes. Applicable tests include High Voltage and Leakage Current testing.<\/p>\n<h3 data-section-id=\"1aejgvj\" data-start=\"20812\" data-end=\"20854\">12. Is shell leakage testing required?<\/h3>\n<p data-start=\"20856\" data-end=\"20944\">Yes. The applicable testing includes pneumatic shell testing and holding-charge testing.<\/p>\n<h3 data-section-id=\"wt9ctu\" data-start=\"20946\" data-end=\"20983\">13. Is bursting testing required?<\/h3>\n<p data-start=\"20985\" data-end=\"21088\">Yes. Bursting is one of the tests identified for IS 10617:2018.<\/p>\n<h3 data-section-id=\"1hb4k2w\" data-start=\"21090\" data-end=\"21139\">14. How many compressor samples are required?<\/h3>\n<p data-start=\"21141\" data-end=\"21263\">The BIS Product Manual specifies <strong data-start=\"21174\" data-end=\"21195\">three compressors<\/strong> as the product sample size.<\/p>\n<h3 data-section-id=\"128n5ok\" data-start=\"21265\" data-end=\"21316\">15. Can different compressor models be grouped?<\/h3>\n<p data-start=\"21318\" data-end=\"21442\">Yes, grouping guidelines are provided based on category, phase and cooling capacity.<\/p>\n<h3 data-section-id=\"n7kidc\" data-start=\"21444\" data-end=\"21508\">16. Can single-phase and three-phase compressors be covered?<\/h3>\n<p data-start=\"21510\" data-end=\"21635\">The grouping guidelines consider single-phase and three-phase compressors separately.<\/p>\n<h3 data-section-id=\"1ktrk1k\" data-start=\"21637\" data-end=\"21673\">17. What documents are required?<\/h3>\n<p data-start=\"21675\" data-end=\"21773\">Factory, product, technical, testing, manufacturing and quality-control documents may be required.<\/p>\n<h3 data-section-id=\"zzl7jf\" data-start=\"21775\" data-end=\"21820\">18. How much does BIS certification cost?<\/h3>\n<p data-start=\"21822\" data-end=\"21951\">The cost depends heavily on the cooling-capacity range, product scope, testing, factory assessment and other applicable expenses.<\/p>\n<h3 data-section-id=\"3s1vkr\" data-start=\"21953\" data-end=\"21994\">19. How long does certification take?<\/h3>\n<p data-start=\"21996\" data-end=\"22134\">The timeline depends on product grouping, laboratory testing, documentation, BIS scrutiny, factory inspection and closure of observations.<\/p>\n<h3 data-section-id=\"51fsp2\" data-start=\"22136\" data-end=\"22189\">20. Can Qualitance India help with IS 10617:2018?<\/h3>\n<p data-start=\"22191\" data-end=\"22371\">Yes. Qualitance India provides support for product assessment, product grouping, documentation, laboratory testing coordination, BIS application and factory inspection preparation.<\/p>\n<hr data-start=\"22373\" data-end=\"22376\" \/>\n<h1 data-section-id=\"g38lxp\" data-start=\"22378\" data-end=\"22395\">People Also Ask<\/h1>\n<h3 data-section-id=\"hb5jih\" data-start=\"22397\" data-end=\"22451\">What is the BIS standard for Hermetic Compressors?<\/h3>\n<p data-start=\"22453\" data-end=\"22555\">The applicable standard is <strong data-start=\"22480\" data-end=\"22554\">IS 10617:2018 \u2013 Hermetic Compressors \u2014 Specification (Second Revision)<\/strong>.<\/p>\n<h3 data-section-id=\"wl6ecu\" data-start=\"22557\" data-end=\"22617\">Is BIS certification mandatory for Hermetic Compressors?<\/h3>\n<p data-start=\"22619\" data-end=\"22752\">IS 10617:2018 is listed by BIS under the compulsory Scheme-I product certification framework.<\/p>\n<h3 data-section-id=\"h4hfgf\" data-start=\"22754\" data-end=\"22801\">What are the types of Hermetic Compressors?<\/h3>\n<p data-start=\"22803\" data-end=\"22886\">The standard covers reciprocating, linear, rotary and scroll compressor mechanisms.<\/p>\n<h3 data-section-id=\"luz4tt\" data-start=\"22888\" data-end=\"22930\">What are LBP, MBP and HBP compressors?<\/h3>\n<p data-start=\"22932\" data-end=\"23079\">They refer to Low Back Pressure, Medium\/Commercial Back Pressure and High Back Pressure categories used for compressor classification and grouping.<\/p>\n<h3 data-section-id=\"gbk4jc\" data-start=\"23081\" data-end=\"23124\">What is tested in Hermetic Compressors?<\/h3>\n<p data-start=\"23126\" data-end=\"23259\">Testing includes performance and capacity tests along with electrical, pressure, leakage, overload and other applicable safety tests.<\/p>\n<h3 data-section-id=\"17uvkul\" data-start=\"23261\" data-end=\"23311\">How many samples are required for BIS testing?<\/h3>\n<p data-start=\"23313\" data-end=\"23423\">The BIS Product Manual specifies three compressors as the sample size.<\/p>\n<h3 data-section-id=\"1iid5ah\" data-start=\"23425\" data-end=\"23489\">How can I obtain BIS Certification for Hermetic Compressors?<\/h3>\n<p data-start=\"23491\" data-end=\"23637\">The process generally involves product assessment, grouping, sample testing, documentation, BIS application, factory inspection and licence grant.<\/p>\n<hr data-start=\"23639\" data-end=\"23642\" \/>\n<h1 data-section-id=\"fphl3b\" data-start=\"23644\" data-end=\"23680\">Related BIS Certification Services<\/h1>\n<ul data-start=\"23682\" data-end=\"24106\">\n<li data-section-id=\"l08ry9\" data-start=\"23682\" data-end=\"23727\">BIS Certification for Room Air Conditioners<\/li>\n<li data-section-id=\"mlpizw\" data-start=\"23728\" data-end=\"23774\">BIS Certification for Split Air Conditioners<\/li>\n<li data-section-id=\"1b6wygc\" data-start=\"23775\" data-end=\"23821\">BIS Certification for Refrigeration Products<\/li>\n<li data-section-id=\"1rb1dax\" data-start=\"23822\" data-end=\"23874\">BIS Certification for Refrigerant Condensing Units<\/li>\n<li data-section-id=\"ddiite\" data-start=\"23875\" data-end=\"23934\">BIS Certification for Self-Contained Automatic Ice Makers<\/li>\n<li data-section-id=\"votbgo\" data-start=\"23935\" data-end=\"23974\">BIS Certification for Electric Motors<\/li>\n<li data-section-id=\"1fb6x1f\" data-start=\"23975\" data-end=\"24020\">BIS Certification for Electrical Appliances<\/li>\n<li data-section-id=\"nf47x2\" data-start=\"24021\" data-end=\"24045\">ISI Mark Certification<\/li>\n<li data-section-id=\"yqg6jk\" data-start=\"24046\" data-end=\"24070\">BIS Testing Assistance<\/li>\n<li data-section-id=\"1rdhe7w\" data-start=\"24071\" data-end=\"24106\">BIS Factory Inspection Assistance<\/li>\n<\/ul>\n<hr data-start=\"24108\" data-end=\"24111\" \/>\n<h1 data-section-id=\"109mcrf\" data-start=\"24113\" data-end=\"24129\">Related Topics<\/h1>\n<ol data-start=\"24131\" data-end=\"24531\">\n<li data-section-id=\"4bhsm9\" data-start=\"24131\" data-end=\"24168\">IS 10617:2018 Hermetic Compressors<\/li>\n<li data-section-id=\"gciwyr\" data-start=\"24169\" data-end=\"24214\">BIS Certification for Hermetic Compressors<\/li>\n<li data-section-id=\"1ym8j0w\" data-start=\"24215\" data-end=\"24258\">Hermetic Compressor Testing Requirements<\/li>\n<li data-section-id=\"1ewoatr\" data-start=\"24259\" data-end=\"24298\">Hermetic Compressor Capacity Testing<\/li>\n<li data-section-id=\"19f7k4b\" data-start=\"24299\" data-end=\"24334\">LBP Compressor BIS Certification<\/li>\n<li data-section-id=\"13xh5q1\" data-start=\"24335\" data-end=\"24370\">MBP Compressor BIS Certification<\/li>\n<li data-section-id=\"e67mot\" data-start=\"24371\" data-end=\"24406\">HBP Compressor BIS Certification<\/li>\n<li data-section-id=\"mhux6d\" data-start=\"24407\" data-end=\"24446\">Hermetic Compressor Product Grouping<\/li>\n<li data-section-id=\"1rhhx1v\" data-start=\"24447\" data-end=\"24488\">BIS Factory Inspection for Compressors<\/li>\n<li data-section-id=\"1hg36j3\" data-start=\"24489\" data-end=\"24531\">BIS Certification Consultancy in India<\/li>\n<\/ol>\n<hr data-start=\"24533\" data-end=\"24536\" \/>\n<h1 data-section-id=\"li5dlc\" data-start=\"24538\" data-end=\"24564\">Contact Qualitance India<\/h1>\n<p data-start=\"24566\" data-end=\"24665\"><strong data-start=\"24566\" data-end=\"24576\">Phone:<\/strong> +91 93106 15170<br data-start=\"24592\" data-end=\"24595\" \/><strong data-start=\"24595\" data-end=\"24605\">Email:<\/strong> <a class=\"decorated-link\" href=\"mailto:info@qualitanceindia.com\" rel=\"noopener\" data-start=\"24606\" data-end=\"24630\">info@qualitanceindia.com<\/a><br data-start=\"24630\" data-end=\"24633\" \/><strong data-start=\"24633\" data-end=\"24645\">Website:<\/strong> qualitanceindia.com<\/p>\n<p data-start=\"24667\" data-end=\"24900\">For assistance with <strong data-start=\"24687\" data-end=\"24754\">BIS Certification for Hermetic Compressors as per IS 10617:2018<\/strong>, contact Qualitance India for product assessment, product grouping, documentation, laboratory testing coordination and BIS certification support.<\/p>\n<hr data-start=\"24902\" data-end=\"24905\" \/>\n<h1 data-section-id=\"fsb6xx\" data-start=\"24907\" data-end=\"24919\">Conclusion<\/h1>\n<p data-start=\"24921\" data-end=\"25303\"><strong data-start=\"24921\" data-end=\"24995\">IS 10617:2018 \u2013 Hermetic Compressors \u2014 Specification (Second Revision)<\/strong> covers safety and performance requirements for hermetic sealed standalone motor-compressors used in household, commercial and industrial refrigeration applications. The standard covers different compressor mechanisms and categories including <strong data-start=\"25238\" data-end=\"25262\">LBP, CBP\/MBP and HBP<\/strong>.<\/p>\n<p data-start=\"25305\" data-end=\"25605\">BIS lists IS 10617:2018 under its compulsory Scheme-I product certification framework. Manufacturers therefore need to pay close attention to product grouping, cooling capacity, testing, documentation, manufacturing facilities and quality-control arrangements.<\/p>\n<p data-start=\"25607\" data-end=\"25805\">The certification process involves product assessment, scope finalisation, sample testing, BIS application, factory assessment and compliance with the applicable inspection and testing requirements.<\/p>\n<p data-start=\"25807\" data-end=\"26077\"><strong data-start=\"25807\" data-end=\"25827\">Qualitance India<\/strong> provides BIS Certification Consultancy for Hermetic Compressors as per <strong data-start=\"25899\" data-end=\"25916\">IS 10617:2018<\/strong>, supporting manufacturers with product assessment, grouping, documentation, laboratory testing coordination, BIS application and factory inspection preparation.<\/p>\n<p data-start=\"26079\" data-end=\"26178\" data-is-last-node=\"\" data-is-only-node=\"\"><strong data-start=\"26079\" data-end=\"26089\">Phone:<\/strong> +91 93106 15170<br data-start=\"26105\" data-end=\"26108\" \/><strong data-start=\"26108\" data-end=\"26118\">Email:<\/strong> <a class=\"decorated-link\" href=\"mailto:info@qualitanceindia.com\" rel=\"noopener\" data-start=\"26119\" data-end=\"26143\">info@qualitanceindia.com<\/a><br data-start=\"26143\" data-end=\"26146\" \/><strong data-start=\"26146\" data-end=\"26158\">Website:<\/strong> qualitanceindia.com<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"z-0 flex min-h-[46px] justify-start\"><\/div>\n<div class=\"pointer-events-none -mb-px h-px w-full opacity-0\" aria-hidden=\"true\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Introduction Hermetic Compressors are important components used in refrigeration and air-conditioning equipment. These compressors are designed with the motor and compressor mechanism enclosed within a gas-tight housing, making reliable construction, sealing, electrical safety and performance essential. In India, IS 10617:2018 \u2013 Hermetic Compressors \u2014 Specification (Second Revision) specifies safety and performance requirements for hermetic sealed [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3583,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"inline_featured_image":false,"slim_seo":{"title":"BIS Certification for Hermetic Compressors | IS 10617:2018 | BIS Certification Consultancy - Qualitance India","description":"Introduction Hermetic Compressors are important components used in refrigeration and air-conditioning equipment. These compressors are designed with the motor a"},"_slim_seo_primary_term_category":0,"_slim_seo_primary_term_post_tag":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3582","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/comments?post=3582"}],"version-history":[{"count":1,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3582\/revisions"}],"predecessor-version":[{"id":3584,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3582\/revisions\/3584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media\/3583"}],"wp:attachment":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media?parent=3582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/categories?post=3582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/tags?post=3582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<!-- This website is optimized by Airlift. Learn more: https://airlift.net. Template:. Learn more: https://airlift.net. Template: 6a4cebdea01328942bf8f471. Config Timestamp: 2026-07-07 12:06:54 UTC, Cached Timestamp: 2026-09-10 15:52:12 UTC, Optimization Time: 2.47ms -->