{"id":3496,"date":"2026-08-20T11:14:02","date_gmt":"2026-08-20T11:14:02","guid":{"rendered":"https:\/\/qualitanceindia.com\/?p=3496"},"modified":"2026-10-31T08:15:38","modified_gmt":"2026-10-31T08:15:38","slug":"bis-certification-consultancy-for-rim-latches-is-10191974-bis-isi-mark-certification","status":"publish","type":"post","link":"https:\/\/qualitanceindia.com\/bis-certification-consultancy-for-rim-latches-is-10191974-bis-isi-mark-certification\/","title":{"rendered":"BIS Certification Consultancy for Rim Latches | IS 1019:1974 | BIS &#038; ISI Mark Certification"},"content":{"rendered":"<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"fe33a76f-d187-4c64-adda-86736ad81e77\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5-6-mini\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\">\n<h2 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"12q1sue\" data-start=\"980\" data-end=\"994\">Introduction<\/h2>\n<p data-start=\"996\" data-end=\"1256\">Rim latches are commonly used as surface-mounted door hardware for residential, commercial and other general-purpose applications. Their construction, dimensions, material, manufacturing quality and finish directly affect their durability and proper operation.<\/p>\n<p data-start=\"1258\" data-end=\"1521\">For maintaining consistent quality in the Indian market, <strong data-start=\"1315\" data-end=\"1363\">IS 1019:1974 \u2013 Specification for Rim Latches<\/strong> lays down requirements relating to the <strong data-start=\"1403\" data-end=\"1482\">material, dimensions, manufacture and finish of rim latches for general use<\/strong>.<\/p>\n<p data-start=\"1523\" data-end=\"1758\">Rim latches are also included under the <strong data-start=\"1563\" data-end=\"1610\">Door Fittings (Quality Control) Order, 2023<\/strong>, and IS 1019:1974 appears in BIS&#8217;s current compulsory certification listing under the Door Fittings category.<\/p>\n<p data-start=\"1760\" data-end=\"1951\">Manufacturers supplying rim latches in India therefore need to understand the applicable BIS certification requirements and ensure that their products conform to the relevant Indian Standard.<\/p>\n<hr data-start=\"1953\" data-end=\"1956\" \/>\n<h2 data-section-id=\"1frsjq1\" data-start=\"1958\" data-end=\"1977\">About Rim Latches<\/h2>\n<p data-start=\"1979\" data-end=\"2212\">A rim latch is a type of door latch installed on the surface of a door rather than being fitted completely inside the door. It generally consists of components such as a body, back plate, latch bolt, follower and associated hardware.<\/p>\n<p data-start=\"2214\" data-end=\"2328\">Rim latches can be manufactured in different configurations and materials depending on the approved product scope.<\/p>\n<p data-start=\"2330\" data-end=\"2403\">The BIS Product Manual for IS 1019:1974 identifies the body materials as:<\/p>\n<ul data-start=\"2405\" data-end=\"2456\">\n<li data-section-id=\"s28ir3\" data-start=\"2405\" data-end=\"2417\">Mild Steel<\/li>\n<li data-section-id=\"1ekvh18\" data-start=\"2418\" data-end=\"2435\">Aluminium Alloy<\/li>\n<li data-section-id=\"16ybz15\" data-start=\"2436\" data-end=\"2443\">Brass<\/li>\n<li data-section-id=\"2eej41\" data-start=\"2444\" data-end=\"2456\">Zinc Alloy<\/li>\n<\/ul>\n<p data-start=\"2458\" data-end=\"2636\">The licence scope also identifies <strong data-start=\"2492\" data-end=\"2525\">Type 1 \u2013 Left Hand\/Right Hand<\/strong> and <strong data-start=\"2530\" data-end=\"2540\">Type 2<\/strong>, with the applicable size range specified in the licence.<\/p>\n<hr data-start=\"2638\" data-end=\"2641\" \/>\n<h2 data-section-id=\"18br80b\" data-start=\"2643\" data-end=\"2666\">What is IS 1019:1974?<\/h2>\n<p data-start=\"2668\" data-end=\"2695\"><strong data-start=\"2668\" data-end=\"2684\">IS 1019:1974<\/strong> is titled:<\/p>\n<p data-start=\"2697\" data-end=\"2748\"><strong data-start=\"2697\" data-end=\"2748\">Specification for Rim Latches (Second Revision)<\/strong><\/p>\n<p data-start=\"2750\" data-end=\"2864\">The standard specifies requirements for rim latches intended for general use. It covers important aspects such as:<\/p>\n<ul data-start=\"2866\" data-end=\"2977\">\n<li data-section-id=\"v2almr\" data-start=\"2866\" data-end=\"2876\">Material<\/li>\n<li data-section-id=\"zy1zez\" data-start=\"2877\" data-end=\"2889\">Dimensions<\/li>\n<li data-section-id=\"18mjlfx\" data-start=\"2890\" data-end=\"2903\">Manufacture<\/li>\n<li data-section-id=\"1y3kd2z\" data-start=\"2904\" data-end=\"2912\">Finish<\/li>\n<li data-section-id=\"1stkp7f\" data-start=\"2913\" data-end=\"2927\">Product type<\/li>\n<li data-section-id=\"1r54ft5\" data-start=\"2928\" data-end=\"2941\">Workmanship<\/li>\n<li data-section-id=\"nma46n\" data-start=\"2942\" data-end=\"2977\">Relevant performance requirements<\/li>\n<\/ul>\n<p data-start=\"2979\" data-end=\"3204\">The standard was originally published for rim latches and was subsequently revised; the second revision also permitted zinc-base alloy pressure die casting for manufacture of rim latches.<\/p>\n<hr data-start=\"3206\" data-end=\"3209\" \/>\n<h2 data-section-id=\"1j2k153\" data-start=\"3211\" data-end=\"3234\">Scope of IS 1019:1974<\/h2>\n<p data-start=\"3236\" data-end=\"3288\">IS 1019:1974 applies to rim latches for general use.<\/p>\n<p data-start=\"3290\" data-end=\"3462\">The standard addresses the requirements necessary to ensure that the product is properly manufactured and meets the specified dimensional, material and finish requirements.<\/p>\n<p data-start=\"3464\" data-end=\"3556\">The BIS Product Manual confirms that the certification scope can cover rim latches based on:<\/p>\n<p data-start=\"3558\" data-end=\"3631\"><strong data-start=\"3558\" data-end=\"3579\">Material of Body:<\/strong><br data-start=\"3579\" data-end=\"3582\" \/>Mild Steel \/ Aluminium Alloy \/ Brass \/ Zinc Alloy<\/p>\n<p data-start=\"3633\" data-end=\"3685\"><strong data-start=\"3633\" data-end=\"3642\">Type:<\/strong><br data-start=\"3642\" data-end=\"3645\" \/>Type 1 \u2013 Left Hand \/ Right Hand<br data-start=\"3676\" data-end=\"3679\" \/>Type 2<\/p>\n<p data-start=\"3687\" data-end=\"3781\"><strong data-start=\"3687\" data-end=\"3696\">Size:<\/strong><br data-start=\"3696\" data-end=\"3699\" \/>As applicable to the approved licence scope.<\/p>\n<hr data-start=\"3783\" data-end=\"3786\" \/>\n<h2 data-section-id=\"ph1xee\" data-start=\"3788\" data-end=\"3810\">Types of Rim Latches<\/h2>\n<h2 data-section-id=\"12tbt3y\" data-start=\"3812\" data-end=\"3833\">Type 1 Rim Latches<\/h2>\n<p data-start=\"3835\" data-end=\"3906\">Type 1 rim latches are identified according to the handing of the door.<\/p>\n<p data-start=\"3908\" data-end=\"3920\">They may be:<\/p>\n<ul data-start=\"3922\" data-end=\"3946\">\n<li data-section-id=\"538to0\" data-start=\"3922\" data-end=\"3933\">Left Hand<\/li>\n<li data-section-id=\"zbrrij\" data-start=\"3934\" data-end=\"3946\">Right Hand<\/li>\n<\/ul>\n<p data-start=\"3948\" data-end=\"4025\">The appropriate configuration is selected depending on the door installation.<\/p>\n<h2 data-section-id=\"9dt4f1\" data-start=\"4027\" data-end=\"4048\">Type 2 Rim Latches<\/h2>\n<p data-start=\"4050\" data-end=\"4237\">Type 2 rim latches are another configuration covered by IS 1019:1974. The BIS Product Manual specifically identifies Type 2 within the licence scope.<\/p>\n<hr data-start=\"4239\" data-end=\"4242\" \/>\n<h2 data-section-id=\"1ur3to0\" data-start=\"4244\" data-end=\"4276\">Materials Used for Rim Latches<\/h2>\n<p data-start=\"4278\" data-end=\"4361\">Depending on the product configuration, rim latch bodies may be manufactured using:<\/p>\n<h3 data-section-id=\"3djeo1\" data-start=\"4363\" data-end=\"4377\">Mild Steel<\/h3>\n<p data-start=\"4379\" data-end=\"4453\">Mild steel is commonly used for strong and economical hardware components.<\/p>\n<h3 data-section-id=\"dm1yqa\" data-start=\"4455\" data-end=\"4474\">Aluminium Alloy<\/h3>\n<p data-start=\"4476\" data-end=\"4582\">Aluminium alloy can be used where lightweight construction and suitable corrosion resistance are required.<\/p>\n<h3 data-section-id=\"6xg16f\" data-start=\"4584\" data-end=\"4593\">Brass<\/h3>\n<p data-start=\"4595\" data-end=\"4668\">Brass provides a combination of durability, machinability and appearance.<\/p>\n<h3 data-section-id=\"s7nr3j\" data-start=\"4670\" data-end=\"4684\">Zinc Alloy<\/h3>\n<p data-start=\"4686\" data-end=\"4819\">Zinc alloy pressure die casting is also permitted for rim latch manufacture under the standard.<\/p>\n<p data-start=\"4821\" data-end=\"4949\">The applicable raw materials must meet the requirements specified in the standard and the relevant BIS certification conditions.<\/p>\n<hr data-start=\"4951\" data-end=\"4954\" \/>\n<h2 data-section-id=\"1m9ja7j\" data-start=\"4956\" data-end=\"4991\">BIS Certification for Rim Latches<\/h2>\n<p data-start=\"4993\" data-end=\"5136\">BIS Certification demonstrates that the manufacturer&#8217;s rim latches have been evaluated against the applicable requirements of <strong data-start=\"5119\" data-end=\"5135\">IS 1019:1974<\/strong>.<\/p>\n<p data-start=\"5138\" data-end=\"5295\">For products covered by the applicable regulatory requirements, certification is provided under the <strong data-start=\"5238\" data-end=\"5294\">BIS Product Certification Scheme-I \/ ISI Mark Scheme<\/strong>.<\/p>\n<p data-start=\"5297\" data-end=\"5462\">BIS&#8217;s current Scheme-I listing places <strong data-start=\"5335\" data-end=\"5365\">IS 1019:1974 \u2013 Rim Latches<\/strong> under the <strong data-start=\"5376\" data-end=\"5423\">Door Fittings (Quality Control) Order, 2023<\/strong>.<\/p>\n<p data-start=\"5464\" data-end=\"5627\">After obtaining the licence, the manufacturer can use the BIS Standard Mark on products covered by the approved licence scope, subject to BIS marking requirements.<\/p>\n<hr data-start=\"5629\" data-end=\"5632\" \/>\n<h2 data-section-id=\"16jvw08\" data-start=\"5634\" data-end=\"5671\">Door Fittings Quality Control Order<\/h2>\n<p data-start=\"5673\" data-end=\"5812\">The <strong data-start=\"5677\" data-end=\"5724\">Door Fittings (Quality Control) Order, 2023<\/strong> covers several door-fitting products, including rim latches conforming to IS 1019:1974.<\/p>\n<p data-start=\"5814\" data-end=\"5872\">BIS&#8217;s current compulsory certification listing identifies:<\/p>\n<p data-start=\"5874\" data-end=\"5904\"><strong data-start=\"5874\" data-end=\"5904\">IS 1019:1974 \u2013 Rim Latches<\/strong><\/p>\n<p data-start=\"5906\" data-end=\"6039\">under the <strong data-start=\"5916\" data-end=\"6000\">Door Fittings (Quality Control) Order, 2023, S.O. 4646(E), dated 23 October 2023<\/strong>.<\/p>\n<p data-start=\"6041\" data-end=\"6203\">The QCO requires covered products to conform to the applicable Indian Standard and carry the Standard Mark under a BIS licence, subject to the order&#8217;s provisions.<\/p>\n<hr data-start=\"6205\" data-end=\"6208\" \/>\n<h2 data-section-id=\"1gvptll\" data-start=\"6210\" data-end=\"6237\">Implementation of the QCO<\/h2>\n<p data-start=\"6239\" data-end=\"6297\">The Door Fittings QCO was notified on <strong data-start=\"6277\" data-end=\"6296\">23 October 2023<\/strong>.<\/p>\n<p data-start=\"6299\" data-end=\"6360\">The commonly applicable implementation schedule provided for:<\/p>\n<ul data-start=\"6362\" data-end=\"6526\">\n<li data-section-id=\"h5ool9\" data-start=\"6362\" data-end=\"6422\">Medium and Large Enterprises \u2013 six months from publication<\/li>\n<li data-section-id=\"17f093\" data-start=\"6423\" data-end=\"6473\">Small Enterprises \u2013 nine months from publication<\/li>\n<li data-section-id=\"kqns0n\" data-start=\"6474\" data-end=\"6526\">Micro Enterprises \u2013 twelve months from publication<\/li>\n<\/ul>\n<p data-start=\"6528\" data-end=\"6768\">For rim latches, the implementation dates have consequently been reported as <strong data-start=\"6605\" data-end=\"6729\">23 April 2024 for medium\/large enterprises, 23 July 2024 for small enterprises and 23 October 2024 for micro enterprises<\/strong>.<\/p>\n<p data-start=\"6770\" data-end=\"6931\">Manufacturers and other stakeholders should always verify the latest government notification and any amendments applicable to their particular business category.<\/p>\n<hr data-start=\"6933\" data-end=\"6936\" \/>\n<h2 data-section-id=\"66amgp\" data-start=\"6938\" data-end=\"6984\">Who Needs BIS Certification for Rim Latches?<\/h2>\n<p data-start=\"6986\" data-end=\"7087\">BIS certification is relevant to businesses involved in manufacturing covered rim latches, including:<\/p>\n<ul data-start=\"7089\" data-end=\"7386\">\n<li data-section-id=\"wu0aw8\" data-start=\"7089\" data-end=\"7114\">Rim latch manufacturers<\/li>\n<li data-section-id=\"wd5g78\" data-start=\"7115\" data-end=\"7144\">Door hardware manufacturers<\/li>\n<li data-section-id=\"l9xhyr\" data-start=\"7145\" data-end=\"7177\">Builder hardware manufacturers<\/li>\n<li data-section-id=\"1hig5i6\" data-start=\"7178\" data-end=\"7208\">Lock and latch manufacturers<\/li>\n<li data-section-id=\"nlh04j\" data-start=\"7209\" data-end=\"7239\">Metal hardware manufacturers<\/li>\n<li data-section-id=\"1ucgx2p\" data-start=\"7240\" data-end=\"7274\">Aluminium hardware manufacturers<\/li>\n<li data-section-id=\"x76xc3\" data-start=\"7275\" data-end=\"7305\">Brass hardware manufacturers<\/li>\n<li data-section-id=\"1njgn5n\" data-start=\"7306\" data-end=\"7341\">Zinc alloy hardware manufacturers<\/li>\n<li data-section-id=\"1qjcsvf\" data-start=\"7342\" data-end=\"7361\">OEM manufacturers<\/li>\n<li data-section-id=\"1mi7k3i\" data-start=\"7362\" data-end=\"7386\">Contract manufacturers<\/li>\n<\/ul>\n<p data-start=\"7388\" data-end=\"7498\">Importers and sellers should also verify their responsibilities under the applicable QCO and BIS requirements.<\/p>\n<hr data-start=\"7500\" data-end=\"7503\" \/>\n<h2 data-section-id=\"173edxn\" data-start=\"7505\" data-end=\"7536\">BIS Certification Eligibility<\/h2>\n<p data-start=\"7538\" data-end=\"7606\">A manufacturer applying for BIS certification should generally have:<\/p>\n<ul data-start=\"7608\" data-end=\"7968\">\n<li data-section-id=\"k244lq\" data-start=\"7608\" data-end=\"7632\">Manufacturing premises<\/li>\n<li data-section-id=\"14euwn\" data-start=\"7633\" data-end=\"7667\">Suitable manufacturing machinery<\/li>\n<li data-section-id=\"1ipfuuo\" data-start=\"7668\" data-end=\"7686\">Product drawings<\/li>\n<li data-section-id=\"hzbrql\" data-start=\"7687\" data-end=\"7709\">Raw-material control<\/li>\n<li data-section-id=\"1woy5s2\" data-start=\"7710\" data-end=\"7740\">Quality-control arrangements<\/li>\n<li data-section-id=\"g74zl7\" data-start=\"7741\" data-end=\"7775\">Testing and measuring facilities<\/li>\n<li data-section-id=\"9qsu9t\" data-start=\"7776\" data-end=\"7798\">Calibrated equipment<\/li>\n<li data-section-id=\"vofemz\" data-start=\"7799\" data-end=\"7818\">Trained personnel<\/li>\n<li data-section-id=\"1bchm20\" data-start=\"7819\" data-end=\"7842\">Inspection procedures<\/li>\n<li data-section-id=\"qg7q9h\" data-start=\"7843\" data-end=\"7863\">Production records<\/li>\n<li data-section-id=\"2mkp8g\" data-start=\"7864\" data-end=\"7881\">Testing records<\/li>\n<li data-section-id=\"1ax674z\" data-start=\"7882\" data-end=\"7911\">Suitable storage facilities<\/li>\n<li data-section-id=\"6q2lao\" data-start=\"7912\" data-end=\"7968\">Proper product identification and marking arrangements<\/li>\n<\/ul>\n<p data-start=\"7970\" data-end=\"8056\">The exact requirements depend on the product configuration and proposed licence scope.<\/p>\n<hr data-start=\"8058\" data-end=\"8061\" \/>\n<h2 data-section-id=\"1oejytg\" data-start=\"8063\" data-end=\"8106\">BIS Certification Process for Rim Latches<\/h2>\n<h2 data-section-id=\"5ubjzc\" data-start=\"8108\" data-end=\"8138\">Step 1 \u2013 Product Assessment<\/h2>\n<p data-start=\"8140\" data-end=\"8191\">The product is first reviewed against IS 1019:1974.<\/p>\n<p data-start=\"8193\" data-end=\"8208\">The applicable:<\/p>\n<ul data-start=\"8210\" data-end=\"8273\">\n<li data-section-id=\"1j4cets\" data-start=\"8210\" data-end=\"8216\">Type<\/li>\n<li data-section-id=\"v2almr\" data-start=\"8217\" data-end=\"8227\">Material<\/li>\n<li data-section-id=\"1j4dcvh\" data-start=\"8228\" data-end=\"8234\">Size<\/li>\n<li data-section-id=\"ar2b79\" data-start=\"8235\" data-end=\"8249\">Construction<\/li>\n<li data-section-id=\"ti25f7\" data-start=\"8250\" data-end=\"8273\">Product configuration<\/li>\n<\/ul>\n<p data-start=\"8275\" data-end=\"8290\">are identified.<\/p>\n<h2 data-section-id=\"b3oq5z\" data-start=\"8292\" data-end=\"8317\">Step 2 \u2013 Product Scope<\/h2>\n<p data-start=\"8319\" data-end=\"8418\">The proposed BIS licence scope is determined according to the applicable BIS grouping requirements.<\/p>\n<h2 data-section-id=\"11mss5h\" data-start=\"8420\" data-end=\"8445\">Step 3 \u2013 Documentation<\/h2>\n<p data-start=\"8447\" data-end=\"8505\">The required technical and factory documents are prepared.<\/p>\n<h2 data-section-id=\"si231r\" data-start=\"8507\" data-end=\"8537\">Step 4 \u2013 Sample Preparation<\/h2>\n<p data-start=\"8539\" data-end=\"8634\">Representative rim latch samples are prepared according to the applicable testing requirements.<\/p>\n<p data-start=\"8636\" data-end=\"8754\">The BIS Product Manual specifies a <strong data-start=\"8671\" data-end=\"8696\">sample size of 2 nos.<\/strong> for IS 1019:1974.<\/p>\n<h2 data-section-id=\"ydzav8\" data-start=\"8756\" data-end=\"8786\">Step 5 \u2013 Laboratory Testing<\/h2>\n<p data-start=\"8788\" data-end=\"8859\">Samples are tested against the applicable requirements of IS 1019:1974.<\/p>\n<h2 data-section-id=\"1mg293k\" data-start=\"8861\" data-end=\"8888\">Step 6 \u2013 BIS Application<\/h2>\n<p data-start=\"8890\" data-end=\"8984\">The manufacturer submits the BIS application with the required documents and test information.<\/p>\n<h2 data-section-id=\"qvhdap\" data-start=\"8986\" data-end=\"9016\">Step 7 \u2013 Factory Assessment<\/h2>\n<p data-start=\"9018\" data-end=\"9091\">BIS assesses the manufacturing facility and quality-control arrangements.<\/p>\n<h2 data-section-id=\"1bg2d05\" data-start=\"9093\" data-end=\"9128\">Step 8 \u2013 Closure of Observations<\/h2>\n<p data-start=\"9130\" data-end=\"9237\">If any observations are raised, the manufacturer takes corrective action and submits the required evidence.<\/p>\n<h2 data-section-id=\"o6gp20\" data-start=\"9239\" data-end=\"9264\">Step 9 \u2013 Licence Grant<\/h2>\n<p data-start=\"9266\" data-end=\"9360\">After successful conformity assessment, BIS grants the licence for the approved product scope.<\/p>\n<h2 data-section-id=\"159mkf7\" data-start=\"9362\" data-end=\"9383\">Step 10 \u2013 ISI Mark<\/h2>\n<p data-start=\"9385\" data-end=\"9481\">The manufacturer can mark compliant products according to the applicable BIS licence conditions.<\/p>\n<hr data-start=\"9483\" data-end=\"9486\" \/>\n<h2 data-section-id=\"1dr8hy4\" data-start=\"9488\" data-end=\"9510\">Testing Requirements<\/h2>\n<p data-start=\"9512\" data-end=\"9590\">Testing is an important part of the BIS certification process for rim latches.<\/p>\n<p data-start=\"9592\" data-end=\"9716\">The BIS laboratory information for IS 1019:1974 includes testing related to various requirements of the standard, including:<\/p>\n<ul data-start=\"9718\" data-end=\"9856\">\n<li data-section-id=\"1fgsdjh\" data-start=\"9718\" data-end=\"9749\">Material-related requirements<\/li>\n<li data-section-id=\"zy1zez\" data-start=\"9750\" data-end=\"9762\">Dimensions<\/li>\n<li data-section-id=\"1r54ft5\" data-start=\"9763\" data-end=\"9776\">Workmanship<\/li>\n<li data-section-id=\"1y3kd2z\" data-start=\"9777\" data-end=\"9785\">Finish<\/li>\n<li data-section-id=\"1rysrs6\" data-start=\"9786\" data-end=\"9821\">Applicable component requirements<\/li>\n<li data-section-id=\"1bfizcu\" data-start=\"9822\" data-end=\"9856\">Performance-related requirements<\/li>\n<\/ul>\n<p data-start=\"9858\" data-end=\"10023\">BIS LIMS currently lists IS 1019:1974 testing facilities and charges for different clauses and material-related requirements.<\/p>\n<p data-start=\"10025\" data-end=\"10155\">The exact test programme should be determined from the latest applicable standard, amendment, Product Manual and BIS requirements.<\/p>\n<hr data-start=\"10157\" data-end=\"10160\" \/>\n<h2 data-section-id=\"1agk8md\" data-start=\"10162\" data-end=\"10189\">Raw Material Requirements<\/h2>\n<p data-start=\"10191\" data-end=\"10260\">Raw-material quality is an important part of rim latch certification.<\/p>\n<p data-start=\"10262\" data-end=\"10672\">The BIS Product Manual states that materials are to conform to the requirements given in <strong data-start=\"10351\" data-end=\"10378\">Table 1 of IS 1019:1974<\/strong>. It also notes that certain materials covered by <strong data-start=\"10428\" data-end=\"10468\">IS 1079, IS 280 and IS 4454 (Part 2)<\/strong> are under mandatory BIS certification, and the manufacturer is required to ensure that applicable ISI-marked material is used and received with a test certificate.<\/p>\n<p data-start=\"10674\" data-end=\"10733\">Manufacturers should therefore maintain proper records for:<\/p>\n<ul data-start=\"10735\" data-end=\"10879\">\n<li data-section-id=\"8wzkq0\" data-start=\"10735\" data-end=\"10754\">Material purchase<\/li>\n<li data-section-id=\"r5pkpi\" data-start=\"10755\" data-end=\"10771\">Material grade<\/li>\n<li data-section-id=\"1qi33mm\" data-start=\"10772\" data-end=\"10790\">Supplier details<\/li>\n<li data-section-id=\"1xxybf7\" data-start=\"10791\" data-end=\"10819\">Material test certificates<\/li>\n<li data-section-id=\"m8jnps\" data-start=\"10820\" data-end=\"10841\">Incoming inspection<\/li>\n<li data-section-id=\"pi9avy\" data-start=\"10842\" data-end=\"10864\">Batch identification<\/li>\n<li data-section-id=\"zc0p3f\" data-start=\"10865\" data-end=\"10879\">Traceability<\/li>\n<\/ul>\n<hr data-start=\"10881\" data-end=\"10884\" \/>\n<h2 data-section-id=\"14nyzla\" data-start=\"10886\" data-end=\"10906\">Product Dimensions<\/h2>\n<p data-start=\"10908\" data-end=\"10964\">Dimensions are an important requirement for rim latches.<\/p>\n<p data-start=\"10966\" data-end=\"11049\">The manufacturer should maintain appropriate dimensional control during production.<\/p>\n<p data-start=\"11051\" data-end=\"11079\">Important areas can include:<\/p>\n<ul data-start=\"11081\" data-end=\"11235\">\n<li data-section-id=\"9iiha3\" data-start=\"11081\" data-end=\"11098\">Body dimensions<\/li>\n<li data-section-id=\"1jdkmb0\" data-start=\"11099\" data-end=\"11122\">Back plate dimensions<\/li>\n<li data-section-id=\"1wwo28c\" data-start=\"11123\" data-end=\"11146\">Latch bolt dimensions<\/li>\n<li data-section-id=\"18g5f2c\" data-start=\"11147\" data-end=\"11169\">Component dimensions<\/li>\n<li data-section-id=\"1mqn25o\" data-start=\"11170\" data-end=\"11186\">Hole positions<\/li>\n<li data-section-id=\"1kfygu\" data-start=\"11187\" data-end=\"11198\">Thickness<\/li>\n<li data-section-id=\"115an7m\" data-start=\"11199\" data-end=\"11213\">Overall size<\/li>\n<li data-section-id=\"1dctjx1\" data-start=\"11214\" data-end=\"11235\">Assembly dimensions<\/li>\n<\/ul>\n<p data-start=\"11237\" data-end=\"11347\">The actual dimensional requirements must be checked against the applicable tables and figures in IS 1019:1974.<\/p>\n<hr data-start=\"11349\" data-end=\"11352\" \/>\n<h2 data-section-id=\"4gexsa\" data-start=\"11354\" data-end=\"11382\">Manufacturing Requirements<\/h2>\n<p data-start=\"11384\" data-end=\"11468\">The manufacturing process should be controlled to ensure consistent product quality.<\/p>\n<p data-start=\"11470\" data-end=\"11544\">Depending on the material and manufacturing method, processes may include:<\/p>\n<ol data-start=\"11546\" data-end=\"11771\">\n<li data-section-id=\"wfnrkr\" data-start=\"11546\" data-end=\"11571\">Raw material receiving<\/li>\n<li data-section-id=\"1pavyz3\" data-start=\"11572\" data-end=\"11582\">Cutting<\/li>\n<li data-section-id=\"18rm9ty\" data-start=\"11583\" data-end=\"11602\">Pressing\/forming<\/li>\n<li data-section-id=\"105fhee\" data-start=\"11603\" data-end=\"11631\">Casting, where applicable<\/li>\n<li data-section-id=\"3nl9j2\" data-start=\"11632\" data-end=\"11644\">Machining<\/li>\n<li data-section-id=\"1ojoe0y\" data-start=\"11645\" data-end=\"11656\">Drilling<\/li>\n<li data-section-id=\"bx4t56\" data-start=\"11657\" data-end=\"11681\">Component preparation<\/li>\n<li data-section-id=\"8yy8o2\" data-start=\"11682\" data-end=\"11702\">Surface treatment<\/li>\n<li data-section-id=\"1mgglvw\" data-start=\"11703\" data-end=\"11714\">Assembly<\/li>\n<li data-section-id=\"kmeq3n\" data-start=\"11715\" data-end=\"11738\">Functional checking<\/li>\n<li data-section-id=\"m94ok9\" data-start=\"11739\" data-end=\"11759\">Final inspection<\/li>\n<li data-section-id=\"4ysfld\" data-start=\"11760\" data-end=\"11771\">Packing<\/li>\n<\/ol>\n<p data-start=\"11773\" data-end=\"11832\">Manufacturing controls should be documented and maintained.<\/p>\n<hr data-start=\"11834\" data-end=\"11837\" \/>\n<h2 data-section-id=\"bnkhw9\" data-start=\"11839\" data-end=\"11860\">Finish Requirements<\/h2>\n<p data-start=\"11862\" data-end=\"11926\">Surface finish is another important aspect of rim latch quality.<\/p>\n<p data-start=\"11928\" data-end=\"12065\">The finished product should be properly processed and free from unacceptable defects that can affect appearance, operation or durability.<\/p>\n<p data-start=\"12067\" data-end=\"12171\">Where coating or surface treatment is applicable, appropriate controls and testing should be maintained.<\/p>\n<p data-start=\"12173\" data-end=\"12366\">The BIS Product Manual notes that finish testing is associated with <strong data-start=\"12241\" data-end=\"12252\">IS 1868<\/strong>, while coating thickness and coating quality can be tested as applicable.<\/p>\n<hr data-start=\"12368\" data-end=\"12371\" \/>\n<h2 data-section-id=\"1mfuv2k\" data-start=\"12373\" data-end=\"12393\">Factory Inspection<\/h2>\n<p data-start=\"12395\" data-end=\"12473\">During BIS factory assessment, the manufacturing facility may be examined for:<\/p>\n<h3 data-section-id=\"ihy9m0\" data-start=\"12475\" data-end=\"12502\">Manufacturing Machinery<\/h3>\n<p data-start=\"12504\" data-end=\"12567\">BIS may review machinery relevant to the manufacturing process.<\/p>\n<h3 data-section-id=\"67c1yo\" data-start=\"12569\" data-end=\"12593\">Raw Material Storage<\/h3>\n<p data-start=\"12595\" data-end=\"12659\">Material identification and storage arrangements may be checked.<\/p>\n<h3 data-section-id=\"5sl7zi\" data-start=\"12661\" data-end=\"12683\">Production Process<\/h3>\n<p data-start=\"12685\" data-end=\"12741\">The manufacturing process should be properly controlled.<\/p>\n<h3 data-section-id=\"1y0dmwj\" data-start=\"12743\" data-end=\"12765\">Testing Facilities<\/h3>\n<p data-start=\"12767\" data-end=\"12842\">Required testing and measuring equipment should be available as applicable.<\/p>\n<h3 data-section-id=\"wzkpnw\" data-start=\"12844\" data-end=\"12859\">Calibration<\/h3>\n<p data-start=\"12861\" data-end=\"12921\">Measuring instruments should have valid calibration records.<\/p>\n<h3 data-section-id=\"gr3tzg\" data-start=\"12923\" data-end=\"12942\">Quality Control<\/h3>\n<p data-start=\"12944\" data-end=\"13018\">Incoming, in-process and final inspection procedures should be maintained.<\/p>\n<h3 data-section-id=\"1pqkjmg\" data-start=\"13020\" data-end=\"13031\">Records<\/h3>\n<p data-start=\"13033\" data-end=\"13080\">Production and quality records may be reviewed.<\/p>\n<h3 data-section-id=\"15m401z\" data-start=\"13082\" data-end=\"13108\">Product Identification<\/h3>\n<p data-start=\"13110\" data-end=\"13175\">Product types, sizes and materials should be properly identified.<\/p>\n<hr data-start=\"13177\" data-end=\"13180\" \/>\n<h2 data-section-id=\"14s1v1v\" data-start=\"13182\" data-end=\"13202\">Documents Required<\/h2>\n<p data-start=\"13204\" data-end=\"13256\">Typical documents for BIS certification may include:<\/p>\n<ul data-start=\"13258\" data-end=\"13786\">\n<li data-section-id=\"b5ucvf\" data-start=\"13258\" data-end=\"13292\">Company registration certificate<\/li>\n<li data-section-id=\"a8o83y\" data-start=\"13293\" data-end=\"13316\">Factory address proof<\/li>\n<li data-section-id=\"17ibqzq\" data-start=\"13317\" data-end=\"13333\">Factory layout<\/li>\n<li data-section-id=\"18vosvl\" data-start=\"13334\" data-end=\"13362\">Manufacturing process flow<\/li>\n<li data-section-id=\"ef1hg\" data-start=\"13363\" data-end=\"13379\">Machinery list<\/li>\n<li data-section-id=\"1ipfuuo\" data-start=\"13380\" data-end=\"13398\">Product drawings<\/li>\n<li data-section-id=\"xvoj65\" data-start=\"13399\" data-end=\"13423\">Product specifications<\/li>\n<li data-section-id=\"hc0hhc\" data-start=\"13424\" data-end=\"13443\">Product catalogue<\/li>\n<li data-section-id=\"cjqh7s\" data-start=\"13444\" data-end=\"13466\">Raw-material details<\/li>\n<li data-section-id=\"1xxybf7\" data-start=\"13467\" data-end=\"13495\">Material test certificates<\/li>\n<li data-section-id=\"1qi33mm\" data-start=\"13496\" data-end=\"13514\">Supplier details<\/li>\n<li data-section-id=\"1fo8gvq\" data-start=\"13515\" data-end=\"13539\">Testing equipment list<\/li>\n<li data-section-id=\"1ymt51g\" data-start=\"13540\" data-end=\"13566\">Calibration certificates<\/li>\n<li data-section-id=\"ku0u1o\" data-start=\"13567\" data-end=\"13589\">Quality-control plan<\/li>\n<li data-section-id=\"1l6vqbz\" data-start=\"13590\" data-end=\"13619\">Internal inspection records<\/li>\n<li data-section-id=\"qg7q9h\" data-start=\"13620\" data-end=\"13640\">Production records<\/li>\n<li data-section-id=\"xl4mzn\" data-start=\"13641\" data-end=\"13655\">Test reports<\/li>\n<li data-section-id=\"684x8w\" data-start=\"13656\" data-end=\"13677\">Product photographs<\/li>\n<li data-section-id=\"1uio16b\" data-start=\"13678\" data-end=\"13695\">Packing details<\/li>\n<li data-section-id=\"1hcgcf\" data-start=\"13696\" data-end=\"13713\">Marking details<\/li>\n<li data-section-id=\"1gg3gcx\" data-start=\"13714\" data-end=\"13746\">Authorized signatory documents<\/li>\n<li data-section-id=\"8zjtnv\" data-start=\"13747\" data-end=\"13786\">Trademark documents, where applicable<\/li>\n<\/ul>\n<p data-start=\"13788\" data-end=\"13866\">The exact document list can vary according to the applicant and licence scope.<\/p>\n<hr data-start=\"13868\" data-end=\"13871\" \/>\n<h2 data-section-id=\"u9b84y\" data-start=\"13873\" data-end=\"13891\">Product Grouping<\/h2>\n<p data-start=\"13893\" data-end=\"13976\">Product grouping is important when a manufacturer produces rim latches in multiple:<\/p>\n<ul data-start=\"13978\" data-end=\"14022\">\n<li data-section-id=\"uo524w\" data-start=\"13978\" data-end=\"13989\">Materials<\/li>\n<li data-section-id=\"177k7z7\" data-start=\"13990\" data-end=\"13997\">Types<\/li>\n<li data-section-id=\"178ffjy\" data-start=\"13998\" data-end=\"14005\">Sizes<\/li>\n<li data-section-id=\"1fjrqzv\" data-start=\"14006\" data-end=\"14022\">Configurations<\/li>\n<\/ul>\n<p data-start=\"14024\" data-end=\"14203\">The BIS Product Manual contains specific grouping guidance in its annexure and provides for licence scope based on material, type and size.<\/p>\n<p data-start=\"14205\" data-end=\"14322\">A manufacturer should therefore determine the proposed product scope before arranging samples and laboratory testing.<\/p>\n<hr data-start=\"14324\" data-end=\"14327\" \/>\n<h2 data-section-id=\"1ufxuqp\" data-start=\"14329\" data-end=\"14374\">Common Reasons for BIS Certification Delays<\/h2>\n<p data-start=\"14376\" data-end=\"14403\">Some common issues include:<\/p>\n<ul data-start=\"14405\" data-end=\"14841\">\n<li data-section-id=\"h0xmh6\" data-start=\"14405\" data-end=\"14435\">Incorrect standard selection<\/li>\n<li data-section-id=\"1vlzjnw\" data-start=\"14436\" data-end=\"14470\">Incorrect product classification<\/li>\n<li data-section-id=\"khr81q\" data-start=\"14471\" data-end=\"14500\">Incomplete product drawings<\/li>\n<li data-section-id=\"1e5dcww\" data-start=\"14501\" data-end=\"14529\">Wrong material declaration<\/li>\n<li data-section-id=\"v1qpuv\" data-start=\"14530\" data-end=\"14563\">Inadequate raw-material records<\/li>\n<li data-section-id=\"1lyyp0l\" data-start=\"14564\" data-end=\"14592\">Incorrect product grouping<\/li>\n<li data-section-id=\"1tyl2ef\" data-start=\"14593\" data-end=\"14621\">Dimensional non-conformity<\/li>\n<li data-section-id=\"o11366\" data-start=\"14622\" data-end=\"14645\">Manufacturing defects<\/li>\n<li data-section-id=\"i9g989\" data-start=\"14646\" data-end=\"14659\">Poor finish<\/li>\n<li data-section-id=\"megstq\" data-start=\"14660\" data-end=\"14691\">Inadequate testing facilities<\/li>\n<li data-section-id=\"1waexq8\" data-start=\"14692\" data-end=\"14726\">Missing calibration certificates<\/li>\n<li data-section-id=\"ggwkkk\" data-start=\"14727\" data-end=\"14746\">Incorrect samples<\/li>\n<li data-section-id=\"bvdcok\" data-start=\"14747\" data-end=\"14773\">Incomplete documentation<\/li>\n<li data-section-id=\"15z8wbz\" data-start=\"14774\" data-end=\"14808\">Factory not ready for assessment<\/li>\n<li data-section-id=\"g3fcab\" data-start=\"14809\" data-end=\"14841\">Incorrect marking or labelling<\/li>\n<\/ul>\n<p data-start=\"14843\" data-end=\"14897\">Proper preparation can help reduce unnecessary delays.<\/p>\n<hr data-start=\"14899\" data-end=\"14902\" \/>\n<h2 data-section-id=\"1jye7rh\" data-start=\"14904\" data-end=\"14928\">BIS Certification Cost<\/h2>\n<p data-start=\"14930\" data-end=\"14983\">The overall cost depends on several factors, such as:<\/p>\n<ul data-start=\"14985\" data-end=\"15242\">\n<li data-section-id=\"qbv4f3\" data-start=\"14985\" data-end=\"15007\">BIS application fees<\/li>\n<li data-section-id=\"xel55g\" data-start=\"15008\" data-end=\"15036\">Laboratory testing charges<\/li>\n<li data-section-id=\"il0m2q\" data-start=\"15037\" data-end=\"15062\">Number of product types<\/li>\n<li data-section-id=\"150fhwa\" data-start=\"15063\" data-end=\"15084\">Number of materials<\/li>\n<li data-section-id=\"1cjf8hg\" data-start=\"15085\" data-end=\"15102\">Number of sizes<\/li>\n<li data-section-id=\"1w02i1o\" data-start=\"15103\" data-end=\"15121\">Product grouping<\/li>\n<li data-section-id=\"1rqeiju\" data-start=\"15122\" data-end=\"15142\">Factory assessment<\/li>\n<li data-section-id=\"hrwpmc\" data-start=\"15143\" data-end=\"15162\">Testing equipment<\/li>\n<li data-section-id=\"zkwwle\" data-start=\"15163\" data-end=\"15176\">Calibration<\/li>\n<li data-section-id=\"1au0k3e\" data-start=\"15177\" data-end=\"15192\">Documentation<\/li>\n<li data-section-id=\"15lefmp\" data-start=\"15193\" data-end=\"15220\">Retesting, where required<\/li>\n<li data-section-id=\"1q8f3t4\" data-start=\"15221\" data-end=\"15242\">Consultancy charges<\/li>\n<\/ul>\n<p data-start=\"15244\" data-end=\"15423\">BIS LIMS currently lists testing charges for IS 1019:1974, but the final project cost depends on the actual scope and testing requirements.<\/p>\n<hr data-start=\"15425\" data-end=\"15428\" \/>\n<h2 data-section-id=\"1a3o6ed\" data-start=\"15430\" data-end=\"15454\">Certification Timeline<\/h2>\n<p data-start=\"15456\" data-end=\"15505\">The certification timeline can vary depending on:<\/p>\n<ul data-start=\"15507\" data-end=\"15691\">\n<li data-section-id=\"r60riv\" data-start=\"15507\" data-end=\"15527\">Document readiness<\/li>\n<li data-section-id=\"860kvd\" data-start=\"15528\" data-end=\"15543\">Product scope<\/li>\n<li data-section-id=\"xjlpof\" data-start=\"15544\" data-end=\"15565\">Sample availability<\/li>\n<li data-section-id=\"khts3h\" data-start=\"15566\" data-end=\"15586\">Laboratory testing<\/li>\n<li data-section-id=\"xkasf8\" data-start=\"15587\" data-end=\"15601\">Test results<\/li>\n<li data-section-id=\"kv72jz\" data-start=\"15602\" data-end=\"15624\">Application scrutiny<\/li>\n<li data-section-id=\"1213b4c\" data-start=\"15625\" data-end=\"15644\">Factory readiness<\/li>\n<li data-section-id=\"1rqeiju\" data-start=\"15645\" data-end=\"15665\">Factory assessment<\/li>\n<li data-section-id=\"1rqzqpt\" data-start=\"15666\" data-end=\"15691\">Closure of observations<\/li>\n<\/ul>\n<p data-start=\"15693\" data-end=\"15833\">Manufacturers can often avoid delays by finalising their product scope and technical documentation before beginning the application process.<\/p>\n<hr data-start=\"15835\" data-end=\"15838\" \/>\n<h2 data-section-id=\"wv2e8b\" data-start=\"15840\" data-end=\"15871\">Benefits of BIS Certification<\/h2>\n<h3 data-section-id=\"15cgiwz\" data-start=\"15873\" data-end=\"15898\">Regulatory Compliance<\/h3>\n<p data-start=\"15900\" data-end=\"15961\">Helps manufacturers meet applicable BIS and QCO requirements.<\/p>\n<h3 data-section-id=\"gey3k\" data-start=\"15963\" data-end=\"15993\">Consistent Product Quality<\/h3>\n<p data-start=\"15995\" data-end=\"16065\">Testing and production controls help maintain uniform product quality.<\/p>\n<h3 data-section-id=\"k08kti\" data-start=\"16067\" data-end=\"16090\">Customer Confidence<\/h3>\n<p data-start=\"16092\" data-end=\"16195\">The ISI Mark provides assurance that the product has been certified under the applicable BIS framework.<\/p>\n<h3 data-section-id=\"s62ca3\" data-start=\"16197\" data-end=\"16218\">Market Acceptance<\/h3>\n<p data-start=\"16220\" data-end=\"16300\">BIS certification supports legal market access where certification is mandatory.<\/p>\n<h3 data-section-id=\"jvxxdo\" data-start=\"16302\" data-end=\"16328\">Better Quality Control<\/h3>\n<p data-start=\"16330\" data-end=\"16401\">The certification process encourages systematic inspection and testing.<\/p>\n<h3 data-section-id=\"517a1m\" data-start=\"16403\" data-end=\"16427\">Business Credibility<\/h3>\n<p data-start=\"16429\" data-end=\"16540\">Certified products can strengthen the manufacturer&#8217;s position in the door hardware and builder hardware market.<\/p>\n<hr data-start=\"16542\" data-end=\"16545\" \/>\n<h2 data-section-id=\"18jhjpw\" data-start=\"16547\" data-end=\"16577\">Why Choose Qualitance India?<\/h2>\n<p data-start=\"16579\" data-end=\"16730\"><strong data-start=\"16579\" data-end=\"16599\">Qualitance India<\/strong> provides consultancy support for BIS certification and ISI Mark certification for various products covered under Indian Standards.<\/p>\n<p data-start=\"16732\" data-end=\"16797\">For <strong data-start=\"16736\" data-end=\"16771\">Rim Latches as per IS 1019:1974<\/strong>, our support can include:<\/p>\n<ul data-start=\"16799\" data-end=\"17177\">\n<li data-section-id=\"1mfdgr4\" data-start=\"16799\" data-end=\"16833\">Product applicability assessment<\/li>\n<li data-section-id=\"pkfmba\" data-start=\"16834\" data-end=\"16863\">Standard requirement review<\/li>\n<li data-section-id=\"9jdwsf\" data-start=\"16864\" data-end=\"16888\">Product scope guidance<\/li>\n<li data-section-id=\"y101wm\" data-start=\"16889\" data-end=\"16919\">Type and material assessment<\/li>\n<li data-section-id=\"ykvcbu\" data-start=\"16920\" data-end=\"16947\">Product grouping guidance<\/li>\n<li data-section-id=\"zrfurn\" data-start=\"16948\" data-end=\"16975\">Documentation preparation<\/li>\n<li data-section-id=\"1qg0zyp\" data-start=\"16976\" data-end=\"16998\">Testing coordination<\/li>\n<li data-section-id=\"1vcb8rl\" data-start=\"16999\" data-end=\"17028\">Sample preparation guidance<\/li>\n<li data-section-id=\"maajyk\" data-start=\"17029\" data-end=\"17057\">BIS application assistance<\/li>\n<li data-section-id=\"sy9ixn\" data-start=\"17058\" data-end=\"17090\">Factory inspection preparation<\/li>\n<li data-section-id=\"1bxrev1\" data-start=\"17091\" data-end=\"17122\">Quality-control documentation<\/li>\n<li data-section-id=\"3i8g1g\" data-start=\"17123\" data-end=\"17152\">Observation closure support<\/li>\n<li data-section-id=\"kobqql\" data-start=\"17153\" data-end=\"17177\">BIS licence assistance<\/li>\n<\/ul>\n<h3 data-section-id=\"16z2skw\" data-start=\"17179\" data-end=\"17207\">Contact Qualitance India<\/h3>\n<p data-start=\"17209\" data-end=\"17308\"><strong data-start=\"17209\" data-end=\"17219\">Phone:<\/strong> +91 93106 15170<br data-start=\"17235\" data-end=\"17238\" \/><strong data-start=\"17238\" data-end=\"17248\">Email:<\/strong> <a class=\"decorated-link cursor-pointer\" rel=\"noopener\" data-start=\"17249\" data-end=\"17273\">info@qualitanceindia.com<\/a><br data-start=\"17273\" data-end=\"17276\" \/><strong data-start=\"17276\" data-end=\"17288\">Website:<\/strong> qualitanceindia.com<\/p>\n<hr data-start=\"17310\" data-end=\"17313\" \/>\n<h2 data-section-id=\"reypxl\" data-start=\"17315\" data-end=\"17352\">Rim Latch BIS Certification Process<\/h2>\n<p data-start=\"17354\" data-end=\"17779\"><strong data-start=\"17354\" data-end=\"17380\">Product Identification<\/strong><br data-start=\"17380\" data-end=\"17383\" \/>\u2193<br data-start=\"17384\" data-end=\"17387\" \/><strong data-start=\"17387\" data-end=\"17422\">IS 1019:1974 Requirement Review<\/strong><br data-start=\"17422\" data-end=\"17425\" \/>\u2193<br data-start=\"17426\" data-end=\"17429\" \/><strong data-start=\"17429\" data-end=\"17463\">Material &amp; Type Identification<\/strong><br data-start=\"17463\" data-end=\"17466\" \/>\u2193<br data-start=\"17467\" data-end=\"17470\" \/><strong data-start=\"17470\" data-end=\"17501\">Size and Scope Finalisation<\/strong><br data-start=\"17501\" data-end=\"17504\" \/>\u2193<br data-start=\"17505\" data-end=\"17508\" \/><strong data-start=\"17508\" data-end=\"17537\">Documentation Preparation<\/strong><br data-start=\"17537\" data-end=\"17540\" \/>\u2193<br data-start=\"17541\" data-end=\"17544\" \/><strong data-start=\"17544\" data-end=\"17566\">Sample Preparation<\/strong><br data-start=\"17566\" data-end=\"17569\" \/>\u2193<br data-start=\"17570\" data-end=\"17573\" \/><strong data-start=\"17573\" data-end=\"17595\">Laboratory Testing<\/strong><br data-start=\"17595\" data-end=\"17598\" \/>\u2193<br data-start=\"17599\" data-end=\"17602\" \/><strong data-start=\"17602\" data-end=\"17621\">BIS Application<\/strong><br data-start=\"17621\" data-end=\"17624\" \/>\u2193<br data-start=\"17625\" data-end=\"17628\" \/><strong data-start=\"17628\" data-end=\"17652\">Application Scrutiny<\/strong><br data-start=\"17652\" data-end=\"17655\" \/>\u2193<br data-start=\"17656\" data-end=\"17659\" \/><strong data-start=\"17659\" data-end=\"17681\">Factory Assessment<\/strong><br data-start=\"17681\" data-end=\"17684\" \/>\u2193<br data-start=\"17685\" data-end=\"17688\" \/><strong data-start=\"17688\" data-end=\"17711\">Observation Closure<\/strong><br data-start=\"17711\" data-end=\"17714\" \/>\u2193<br data-start=\"17715\" data-end=\"17718\" \/><strong data-start=\"17718\" data-end=\"17739\">BIS Licence Grant<\/strong><br data-start=\"17739\" data-end=\"17742\" \/>\u2193<br data-start=\"17743\" data-end=\"17746\" \/><strong data-start=\"17746\" data-end=\"17779\">ISI Mark on Approved Products<\/strong><\/p>\n<hr data-start=\"17781\" data-end=\"17784\" \/>\n<h2 data-section-id=\"hkd5a4\" data-start=\"17786\" data-end=\"17814\">Frequently Asked Questions<\/h2>\n<h3 data-section-id=\"1cgt7b9\" data-start=\"17816\" data-end=\"17864\">1. What is the BIS standard for rim latches?<\/h3>\n<p data-start=\"17866\" data-end=\"17982\">The applicable standard is <strong data-start=\"17893\" data-end=\"17941\">IS 1019:1974 \u2013 Specification for Rim Latches<\/strong>.<\/p>\n<h3 data-section-id=\"1435i8x\" data-start=\"17984\" data-end=\"18038\">2. Is BIS certification mandatory for rim latches?<\/h3>\n<p data-start=\"18040\" data-end=\"18209\">Rim latches are included in the BIS compulsory certification framework under the <strong data-start=\"18121\" data-end=\"18168\">Door Fittings (Quality Control) Order, 2023<\/strong>.<\/p>\n<h3 data-section-id=\"u7bqgy\" data-start=\"18211\" data-end=\"18255\">3. What is the ISI Mark for rim latches?<\/h3>\n<p data-start=\"18257\" data-end=\"18378\">The applicable Standard Mark is the BIS Standard Mark used under the BIS licence for products conforming to IS 1019:1974.<\/p>\n<h3 data-section-id=\"jl5y7b\" data-start=\"18380\" data-end=\"18429\">4. Which materials are covered under IS 1019?<\/h3>\n<p data-start=\"18431\" data-end=\"18598\">The BIS Product Manual identifies mild steel, aluminium alloy, brass and zinc alloy as body materials within the licence scope.<\/p>\n<h3 data-section-id=\"zvzejm\" data-start=\"18600\" data-end=\"18645\">5. What types of rim latches are covered?<\/h3>\n<p data-start=\"18647\" data-end=\"18794\">The BIS Product Manual identifies Type 1 and Type 2 rim latches, with Type 1 being left-hand or right-hand.<\/p>\n<h3 data-section-id=\"19vi9w1\" data-start=\"18796\" data-end=\"18834\">6. What is the sample requirement?<\/h3>\n<p data-start=\"18836\" data-end=\"18939\">The BIS Product Manual specifies <strong data-start=\"18869\" data-end=\"18879\">2 nos.<\/strong> as the sample size.<\/p>\n<h3 data-section-id=\"npgcex\" data-start=\"18941\" data-end=\"18979\">7. Is factory inspection required?<\/h3>\n<p data-start=\"18981\" data-end=\"19072\">Yes, factory assessment forms part of the BIS Product Certification process under Scheme-I.<\/p>\n<h3 data-section-id=\"askc3a\" data-start=\"19074\" data-end=\"19121\">8. What tests are required for rim latches?<\/h3>\n<p data-start=\"19123\" data-end=\"19264\">Testing covers applicable requirements of IS 1019:1974, including material, dimensions, workmanship, finish and other specified requirements.<\/p>\n<h3 data-section-id=\"1un3k9a\" data-start=\"19266\" data-end=\"19320\">9. Are raw materials required to be BIS certified?<\/h3>\n<p data-start=\"19322\" data-end=\"19557\">For the applicable materials identified by the Product Manual, manufacturers must ensure the required conformity and documentation, including applicable ISI-marked material and test certificates.<\/p>\n<h3 data-section-id=\"qy875\" data-start=\"19559\" data-end=\"19626\">10. Can different rim latch sizes be covered under one licence?<\/h3>\n<p data-start=\"19628\" data-end=\"19772\">The licence scope can cover a specified size range, subject to BIS grouping and conformity requirements.<\/p>\n<h3 data-section-id=\"lzw7ht\" data-start=\"19774\" data-end=\"19837\">11. Is BIS certification required for imported rim latches?<\/h3>\n<p data-start=\"19839\" data-end=\"19951\">Importers should verify the applicable QCO and BIS requirements before importing covered rim latches into India.<\/p>\n<h3 data-section-id=\"1f1bhvo\" data-start=\"19953\" data-end=\"20012\">12. Is the Door Fittings QCO applicable to rim latches?<\/h3>\n<p data-start=\"20014\" data-end=\"20137\">Yes. IS 1019:1974 \u2013 Rim Latches is specifically listed under the Door Fittings QCO.<\/p>\n<h3 data-section-id=\"13wzelq\" data-start=\"20139\" data-end=\"20195\">13. When did the QCO requirements become applicable?<\/h3>\n<p data-start=\"20197\" data-end=\"20463\">The implementation schedule depends on the enterprise category, with the commonly applicable dates being 23 April 2024 for medium\/large enterprises, 23 July 2024 for small enterprises and 23 October 2024 for micro enterprises.<\/p>\n<h3 data-section-id=\"4nkgf6\" data-start=\"20465\" data-end=\"20521\">14. What documents are needed for BIS certification?<\/h3>\n<p data-start=\"20523\" data-end=\"20695\">Documents generally include factory details, drawings, manufacturing process, machinery details, raw-material information, testing arrangements and quality-control records.<\/p>\n<h3 data-section-id=\"1xgt73\" data-start=\"20697\" data-end=\"20742\">15. How long does BIS certification take?<\/h3>\n<p data-start=\"20744\" data-end=\"20861\">The timeline depends on testing, documentation, application scrutiny, factory assessment and closure of observations.<\/p>\n<h3 data-section-id=\"1vnkuex\" data-start=\"20863\" data-end=\"20920\">16. Can Qualitance India help with BIS certification?<\/h3>\n<p data-start=\"20922\" data-end=\"21068\">Yes. Qualitance India can assist with product assessment, documentation, testing coordination, BIS application and factory inspection preparation.<\/p>\n<h3 data-section-id=\"12bg8b5\" data-start=\"21070\" data-end=\"21144\">17. What is the difference between BIS certification and the ISI Mark?<\/h3>\n<p data-start=\"21146\" data-end=\"21309\">BIS certification is the conformity assessment approval, while the ISI Mark is the Standard Mark applied to products under the relevant BIS licence and conditions.<\/p>\n<h3 data-section-id=\"12j5wk1\" data-start=\"21311\" data-end=\"21382\">18. Can a manufacturer apply for BIS certification without testing?<\/h3>\n<p data-start=\"21384\" data-end=\"21513\">The applicable product testing and conformity assessment requirements must be completed as part of the BIS certification process.<\/p>\n<h3 data-section-id=\"57odu1\" data-start=\"21515\" data-end=\"21565\">19. What happens if a rim latch fails testing?<\/h3>\n<p data-start=\"21567\" data-end=\"21731\">The manufacturer may need to investigate the non-conformity, make necessary corrections and undertake testing again as permitted under the applicable BIS procedure.<\/p>\n<h3 data-section-id=\"n4wqfi\" data-start=\"21733\" data-end=\"21815\">20. Can a manufacturer get BIS certification for multiple rim latch materials?<\/h3>\n<p data-start=\"21817\" data-end=\"21957\">Potentially yes, but the proposed licence scope must be assessed according to the applicable material, type, size and grouping requirements.<\/p>\n<hr data-start=\"21959\" data-end=\"21962\" \/>\n<h2 data-section-id=\"g38lxp\" data-start=\"21964\" data-end=\"21981\">People Also Ask<\/h2>\n<h3 data-section-id=\"ljh9gr\" data-start=\"21983\" data-end=\"22008\">What is IS 1019:1974?<\/h3>\n<p data-start=\"22010\" data-end=\"22102\">IS 1019:1974 is the Indian Standard specifying requirements for rim latches for general use.<\/p>\n<h3 data-section-id=\"21c3jp\" data-start=\"22104\" data-end=\"22136\">Is IS 1019:1974 under a QCO?<\/h3>\n<p data-start=\"22138\" data-end=\"22281\">Yes. Rim Latches under IS 1019:1974 are included under the Door Fittings (Quality Control) Order, 2023.<\/p>\n<h3 data-section-id=\"1sje6un\" data-start=\"22283\" data-end=\"22326\">What materials are used in rim latches?<\/h3>\n<p data-start=\"22328\" data-end=\"22479\">Mild steel, aluminium alloy, brass and zinc alloy are identified within the BIS Product Manual&#8217;s licence scope.<\/p>\n<h3 data-section-id=\"1ll3f76\" data-start=\"22481\" data-end=\"22539\">What is the BIS certification process for rim latches?<\/h3>\n<p data-start=\"22541\" data-end=\"22675\">It generally involves product assessment, documentation, sample testing, BIS application, factory assessment and grant of the licence.<\/p>\n<h3 data-section-id=\"iqmtff\" data-start=\"22677\" data-end=\"22719\">Is ISI Mark mandatory for rim latches?<\/h3>\n<p data-start=\"22721\" data-end=\"22894\">For rim latches covered by the applicable QCO, conformity and Standard Mark requirements apply under the BIS certification framework.<\/p>\n<hr data-start=\"22896\" data-end=\"22899\" \/>\n<h2 data-section-id=\"dr8eaz\" data-start=\"22901\" data-end=\"22932\">Frequently Searched Questions<\/h2>\n<p data-start=\"22934\" data-end=\"22971\"><strong data-start=\"22934\" data-end=\"22971\">BIS certification for rim latches<\/strong><\/p>\n<p data-start=\"22973\" data-end=\"23004\"><strong data-start=\"22973\" data-end=\"23004\">BIS licence for rim latches<\/strong><\/p>\n<p data-start=\"23006\" data-end=\"23034\"><strong data-start=\"23006\" data-end=\"23034\">ISI Mark for rim latches<\/strong><\/p>\n<p data-start=\"23036\" data-end=\"23066\"><strong data-start=\"23036\" data-end=\"23066\">IS 1019:1974 certification<\/strong><\/p>\n<p data-start=\"23068\" data-end=\"23098\"><strong data-start=\"23068\" data-end=\"23098\">Rim latch testing in India<\/strong><\/p>\n<p data-start=\"23100\" data-end=\"23117\"><strong data-start=\"23100\" data-end=\"23117\">Rim latch QCO<\/strong><\/p>\n<p data-start=\"23119\" data-end=\"23154\"><strong data-start=\"23119\" data-end=\"23154\">Door fittings BIS certification<\/strong><\/p>\n<p data-start=\"23156\" data-end=\"23195\"><strong data-start=\"23156\" data-end=\"23195\">BIS certification for door hardware<\/strong><\/p>\n<p data-start=\"23197\" data-end=\"23231\"><strong data-start=\"23197\" data-end=\"23231\">BIS consultant for rim latches<\/strong><\/p>\n<p data-start=\"23233\" data-end=\"23271\"><strong data-start=\"23233\" data-end=\"23271\">Rim latch manufacturer BIS licence<\/strong><\/p>\n<hr data-start=\"23273\" data-end=\"23276\" \/>\n<h2 data-section-id=\"fphl3b\" data-start=\"23278\" data-end=\"23314\">Related BIS Certification Services<\/h2>\n<ul data-start=\"23316\" data-end=\"23837\">\n<li data-section-id=\"f9k1ed\" data-start=\"23316\" data-end=\"23366\">BIS Certification for Door Handles \u2013 IS 208:2020<\/li>\n<li data-section-id=\"1uldx6p\" data-start=\"23367\" data-end=\"23418\">BIS Certification for Door Closers \u2013 IS 6343:1982<\/li>\n<li data-section-id=\"hwgbbl\" data-start=\"23419\" data-end=\"23494\">BIS Certification for Hydraulically Regulated Door Closers \u2013 IS 3564:1995<\/li>\n<li data-section-id=\"tui5x4\" data-start=\"23495\" data-end=\"23547\">BIS Certification for Floor Springs \u2013 IS 6315:1992<\/li>\n<li data-section-id=\"2mz4e\" data-start=\"23548\" data-end=\"23583\">BIS Certification for Tower Bolts<\/li>\n<li data-section-id=\"mfvf81\" data-start=\"23584\" data-end=\"23626\">BIS Certification for Sliding Door Bolts<\/li>\n<li data-section-id=\"ctgdmj\" data-start=\"23627\" data-end=\"23665\">BIS Certification for Cabinet Hinges<\/li>\n<li data-section-id=\"mrbha2\" data-start=\"23666\" data-end=\"23701\">BIS Certification for Butt Hinges<\/li>\n<li data-section-id=\"63i758\" data-start=\"23702\" data-end=\"23742\">BIS Certification for Builder Hardware<\/li>\n<li data-section-id=\"se0zy4\" data-start=\"23743\" data-end=\"23776\">BIS Certification for Fasteners<\/li>\n<li data-section-id=\"nf47x2\" data-start=\"23777\" data-end=\"23801\">ISI Mark Certification<\/li>\n<li data-section-id=\"1rdhe7w\" data-start=\"23802\" data-end=\"23837\">BIS Factory Inspection Assistance<\/li>\n<\/ul>\n<hr data-start=\"23839\" data-end=\"23842\" \/>\n<h2 data-section-id=\"1ytdxe2\" data-start=\"23844\" data-end=\"23877\">Related Topics for\u00a0 Website<\/h2>\n<ol data-start=\"23879\" data-end=\"24373\">\n<li data-section-id=\"16huowx\" data-start=\"23879\" data-end=\"23935\">BIS Certification for Door Handles as per IS 208:2020<\/li>\n<li data-section-id=\"145ktbq\" data-start=\"23936\" data-end=\"23993\">BIS Certification for Door Closers as per IS 6343:1982<\/li>\n<li data-section-id=\"1epebla\" data-start=\"23994\" data-end=\"24052\">BIS Certification for Floor Springs as per IS 6315:1992<\/li>\n<li data-section-id=\"8118ti\" data-start=\"24053\" data-end=\"24098\">BIS Certification for Tower Bolts \u2013 IS 204<\/li>\n<li data-section-id=\"17g5quf\" data-start=\"24099\" data-end=\"24142\">BIS Certification for Sliding Door Bolts<\/li>\n<li data-section-id=\"1pkks0e\" data-start=\"24143\" data-end=\"24182\">BIS Certification for Cabinet Hinges<\/li>\n<li data-section-id=\"174rbot\" data-start=\"24183\" data-end=\"24235\">BIS Certification for Stainless Steel Butt Hinges<\/li>\n<li data-section-id=\"jcuuxz\" data-start=\"24236\" data-end=\"24278\">Door Fittings QCO 2023 \u2013 Complete Guide<\/li>\n<li data-section-id=\"1k1uzj1\" data-start=\"24279\" data-end=\"24328\">BIS Certification Process for Builder Hardware<\/li>\n<li data-section-id=\"gnsdwn\" data-start=\"24329\" data-end=\"24373\">ISI Mark Certification for Door Hardware<\/li>\n<\/ol>\n<hr data-start=\"24375\" data-end=\"24378\" \/>\n<h2 data-section-id=\"n0kmrv\" data-start=\"24380\" data-end=\"24411\">Image Text for Website \/ Post<\/h2>\n<p data-start=\"24413\" data-end=\"24434\"><strong data-start=\"24413\" data-end=\"24434\">BIS CERTIFICATION<\/strong><\/p>\n<p data-start=\"24436\" data-end=\"24443\"><strong data-start=\"24436\" data-end=\"24443\">FOR<\/strong><\/p>\n<h2 data-section-id=\"vyrxg4\" data-start=\"24445\" data-end=\"24458\">RIM LATCHES<\/h2>\n<h3 data-section-id=\"19kswjo\" data-start=\"24460\" data-end=\"24476\">IS 1019:1974<\/h3>\n<p data-start=\"24478\" data-end=\"24510\"><strong data-start=\"24478\" data-end=\"24510\">BIS &amp; ISI MARK CERTIFICATION<\/strong><\/p>\n<p data-start=\"24512\" data-end=\"24561\"><strong data-start=\"24512\" data-end=\"24561\">Get BIS Certification with Expert Consultancy<\/strong><\/p>\n<p data-start=\"24563\" data-end=\"24726\"><strong data-start=\"24563\" data-end=\"24596\">BIS Certification Consultancy<\/strong><br data-start=\"24596\" data-end=\"24599\" \/><strong data-start=\"24599\" data-end=\"24624\">Documentation Support<\/strong><br data-start=\"24624\" data-end=\"24627\" \/><strong data-start=\"24627\" data-end=\"24651\">Testing Coordination<\/strong><br data-start=\"24651\" data-end=\"24654\" \/><strong data-start=\"24654\" data-end=\"24687\">Factory Inspection Assistance<\/strong><br data-start=\"24687\" data-end=\"24690\" \/><strong data-start=\"24690\" data-end=\"24726\">End-to-End Certification Support<\/strong><\/p>\n<p data-start=\"24728\" data-end=\"24748\"><strong data-start=\"24728\" data-end=\"24748\">Qualitance India<\/strong><\/p>\n<p data-start=\"24750\" data-end=\"24830\"><strong data-start=\"24750\" data-end=\"24769\">+91 93106 15170<\/strong><br data-start=\"24769\" data-end=\"24772\" \/><strong data-start=\"24772\" data-end=\"24800\"><a class=\"decorated-link cursor-pointer\" rel=\"noopener\" data-start=\"24774\" data-end=\"24798\">info@qualitanceindia.com<\/a><\/strong><br data-start=\"24800\" data-end=\"24803\" \/><strong data-start=\"24803\" data-end=\"24830\"><a class=\"decorated-link\" href=\"http:\/\/www.qualitanceindia.com\" target=\"_new\" rel=\"noopener\" data-start=\"24805\" data-end=\"24828\">www.qualitanceindia.com<\/a><\/strong><\/p>\n<hr data-start=\"24832\" data-end=\"24835\" \/>\n<h2 data-section-id=\"uwv6qt\" data-start=\"24837\" data-end=\"24863\">Suggested Page Structure<\/h2>\n<h2 data-section-id=\"4y24hp\" data-start=\"24865\" data-end=\"24916\">BIS Certification for Rim Latches \u2013 IS 1019:1974<\/h2>\n<h3 data-section-id=\"zamd46\" data-start=\"24918\" data-end=\"24934\">Introduction<\/h3>\n<h3 data-section-id=\"7jsx89\" data-start=\"24936\" data-end=\"24957\">About Rim Latches<\/h3>\n<h3 data-section-id=\"ljh9gr\" data-start=\"24959\" data-end=\"24984\">What is IS 1019:1974?<\/h3>\n<h3 data-section-id=\"17qd2uf\" data-start=\"24986\" data-end=\"25011\">Scope of IS 1019:1974<\/h3>\n<h3 data-section-id=\"sxy1yu\" data-start=\"25013\" data-end=\"25037\">Types of Rim Latches<\/h3>\n<h3 data-section-id=\"915jea\" data-start=\"25039\" data-end=\"25060\">Materials Covered<\/h3>\n<h3 data-section-id=\"1gc7g1l\" data-start=\"25062\" data-end=\"25095\">BIS Certification Requirement<\/h3>\n<h3 data-section-id=\"hs4jhj\" data-start=\"25097\" data-end=\"25142\">Door Fittings Quality Control Order, 2023<\/h3>\n<h3 data-section-id=\"10wesoo\" data-start=\"25144\" data-end=\"25175\">Implementation Requirements<\/h3>\n<h3 data-section-id=\"1eo3m8\" data-start=\"25177\" data-end=\"25209\">Who Needs BIS Certification?<\/h3>\n<h3 data-section-id=\"1k0xf5z\" data-start=\"25211\" data-end=\"25239\">Eligibility Requirements<\/h3>\n<h3 data-section-id=\"18enf65\" data-start=\"25241\" data-end=\"25270\">BIS Certification Process<\/h3>\n<h3 data-section-id=\"f5xlq4\" data-start=\"25272\" data-end=\"25296\">Testing Requirements<\/h3>\n<h3 data-section-id=\"ytx405\" data-start=\"25298\" data-end=\"25327\">Raw Material Requirements<\/h3>\n<h3 data-section-id=\"hvlxn2\" data-start=\"25329\" data-end=\"25351\">Product Dimensions<\/h3>\n<h3 data-section-id=\"6x5ip6\" data-start=\"25353\" data-end=\"25383\">Manufacturing Requirements<\/h3>\n<h3 data-section-id=\"1tuz3jt\" data-start=\"25385\" data-end=\"25408\">Finish Requirements<\/h3>\n<h3 data-section-id=\"4gs6jw\" data-start=\"25410\" data-end=\"25432\">Factory Inspection<\/h3>\n<h3 data-section-id=\"8z1ntf\" data-start=\"25434\" data-end=\"25456\">Documents Required<\/h3>\n<h3 data-section-id=\"1ynf0eq\" data-start=\"25458\" data-end=\"25478\">Product Grouping<\/h3>\n<h3 data-section-id=\"bfdjkp\" data-start=\"25480\" data-end=\"25511\">Common Certification Issues<\/h3>\n<h3 data-section-id=\"ia9x9x\" data-start=\"25513\" data-end=\"25535\">Certification Cost<\/h3>\n<h3 data-section-id=\"u8hhol\" data-start=\"25537\" data-end=\"25563\">Certification Timeline<\/h3>\n<h3 data-section-id=\"1oi6dbf\" data-start=\"25565\" data-end=\"25598\">Benefits of BIS Certification<\/h3>\n<h3 data-section-id=\"11xy6pg\" data-start=\"25600\" data-end=\"25632\">Why Choose Qualitance India?<\/h3>\n<h3 data-section-id=\"ul2pwc\" data-start=\"25634\" data-end=\"25664\">Frequently Asked Questions<\/h3>\n<h3 data-section-id=\"oes8vh\" data-start=\"25666\" data-end=\"25685\">People Also Ask<\/h3>\n<h3 data-section-id=\"1e7pyv3\" data-start=\"25687\" data-end=\"25711\">Related BIS Services<\/h3>\n<h3 data-section-id=\"16z2skw\" data-start=\"25713\" data-end=\"25741\">Contact Qualitance India<\/h3>\n<hr data-start=\"25743\" data-end=\"25746\" \/>\n<h2 data-section-id=\"1hpckqy\" data-start=\"25748\" data-end=\"25810\">BIS Certification for Rim Latches \u2013 Contact Qualitance India<\/h2>\n<p data-start=\"25812\" data-end=\"26026\">If you manufacture <strong data-start=\"25831\" data-end=\"25866\">Rim Latches as per IS 1019:1974<\/strong>, getting the applicable BIS certification and maintaining the required quality-control system is important for supplying covered products in the Indian market.<\/p>\n<p data-start=\"26028\" data-end=\"26217\">Qualitance India can assist you with the complete process, from <strong data-start=\"26092\" data-end=\"26216\">product applicability and scope assessment to testing, documentation, BIS application and factory inspection preparation<\/strong>.<\/p>\n<p data-start=\"26219\" data-end=\"26282\"><strong data-start=\"26219\" data-end=\"26282\">Qualitance India \u2013 BIS &amp; ISI Mark Certification Consultancy<\/strong><\/p>\n<p data-start=\"26284\" data-end=\"26382\"><strong data-start=\"26284\" data-end=\"26293\">Call:<\/strong> +91 93106 15170<br data-start=\"26309\" data-end=\"26312\" \/><strong data-start=\"26312\" data-end=\"26322\">Email:<\/strong> <a class=\"decorated-link cursor-pointer\" rel=\"noopener\" data-start=\"26323\" data-end=\"26347\">info@qualitanceindia.com<\/a><br data-start=\"26347\" data-end=\"26350\" \/><strong data-start=\"26350\" data-end=\"26362\">Website:<\/strong> qualitanceindia.com<\/p>\n<p data-start=\"26384\" data-end=\"26643\">The BIS Product Manual confirms that IS 1019:1974 certification is operated under Scheme-I and provides specific guidance on raw materials, product grouping, sample requirements, testing equipment and the licence scope.<\/p>\n<h3 data-section-id=\"7122xm\" data-start=\"26645\" data-end=\"26659\">Final Note<\/h3>\n<p data-start=\"26661\" data-end=\"27133\">Rim latches are an important category of door hardware, and <strong data-start=\"26721\" data-end=\"26737\">IS 1019:1974<\/strong> establishes requirements for their material, dimensions, manufacture and finish. Because rim latches are included under the <strong data-start=\"26862\" data-end=\"26909\">Door Fittings (Quality Control) Order, 2023<\/strong>, manufacturers should ensure that their products, manufacturing facilities, testing arrangements and documentation are ready for the applicable BIS conformity assessment requirements.<\/p>\n<p data-start=\"27135\" data-end=\"27227\" data-is-last-node=\"\" data-is-only-node=\"\"><strong data-start=\"27135\" data-end=\"27227\" data-is-last-node=\"\">For BIS Certification and ISI Mark assistance for Rim Latches, contact Qualitance India.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"z-0 flex min-h-[46px] justify-start\"><\/div>\n<div class=\"pointer-events-none -mb-px h-px w-full opacity-0\" aria-hidden=\"true\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Introduction Rim latches are commonly used as surface-mounted door hardware for residential, commercial and other general-purpose applications. Their construction, dimensions, material, manufacturing quality and finish directly affect their durability and proper operation. For maintaining consistent quality in the Indian market, IS 1019:1974 \u2013 Specification for Rim Latches lays down requirements relating to the material, dimensions, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3497,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"slim_seo":{"title":"BIS Certification for Rim Latches | IS 1019","description":"Get BIS Certification for Rim Latches as per IS 1019:1974. Learn about BIS and ISI Mark requirements, Door Fittings QCO, testing, documents, factory inspection"},"_slim_seo_primary_term_category":0,"_slim_seo_primary_term_post_tag":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/comments?post=3496"}],"version-history":[{"count":2,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3496\/revisions"}],"predecessor-version":[{"id":4493,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3496\/revisions\/4493"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media\/3497"}],"wp:attachment":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media?parent=3496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/categories?post=3496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/tags?post=3496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}