{"id":3821,"date":"2026-09-18T10:32:28","date_gmt":"2026-09-18T10:32:28","guid":{"rendered":"https:\/\/qualitanceindia.com\/?p=3821"},"modified":"2026-09-18T10:32:28","modified_gmt":"2026-09-18T10:32:28","slug":"bis-crs-certification-for-led-lighting-chains-is-10322-part-5-section-72017-bis-consultancy","status":"publish","type":"post","link":"https:\/\/qualitanceindia.com\/bis-crs-certification-for-led-lighting-chains-is-10322-part-5-section-72017-bis-consultancy\/","title":{"rendered":"BIS CRS Certification for LED Lighting Chains | IS 10322 (Part 5\/Section 7):2017 | BIS Consultancy"},"content":{"rendered":"<h1>Introduction<\/h1>\n<p class=\"isSelectedEnd\">LED Lighting Chains are widely used for decorative, festive and celebratory lighting in homes, commercial establishments, events, exhibitions, hotels, shopping areas and public spaces. They are commonly known as <strong>LED string lights, decorative light chains, festival lights or Christmas lights<\/strong> depending on their design and application.<\/p>\n<p class=\"isSelectedEnd\">A lighting chain generally consists of a series of lamps, parallel-connected lamps, or series\/parallel-connected lamps connected through insulated conductors. BIS describes lighting chains as an assembly of lamps and interconnecting insulated conductors, with decorative festival and celebratory lights being typical examples.<\/p>\n<p class=\"isSelectedEnd\">The earlier BIS CRS framework for this product was based on:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 7):2017 \/ IEC 60598-2-20:2014 \u2013 Luminaires \u2013 Part 5: Particular Requirements \u2013 Section 7: Lighting Chains.<\/strong><\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s CRS database specifically identifies <strong>LED Lighting Chains<\/strong> against this standard.<\/p>\n<h3>Important Current Update for 2026<\/h3>\n<p class=\"isSelectedEnd\">BIS has now revised the standard to:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 7):2026 \/ IEC 60598-2-20:2022<\/strong><\/p>\n<p class=\"isSelectedEnd\">for LED Lighting Chains. BIS issued implementation guidelines dated <strong>20 March 2026<\/strong>, stating that the 2017 standard and the new 2026 standard could run concurrently only up to <strong>2 August 2026<\/strong>. From <strong>3 August 2026<\/strong>, new licences cannot be granted under the old 2017 standard. Existing licensees were required to implement the revised standard by the same date.<\/p>\n<p class=\"isSelectedEnd\">Therefore, this article covers the <strong>2017 standard because it remains an important search and legacy reference<\/strong>, while clearly explaining the <strong>current 2026 compliance position<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">Qualitance India provides BIS CRS consultancy for LED Lighting Chains, including product classification, laboratory coordination, technical documentation, CRS application support and transition assistance to the revised 2026 standard.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What Is IS 10322 (Part 5\/Section 7):2017?<\/h1>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 7):2017<\/strong> is the Indian Standard for:<\/p>\n<p class=\"isSelectedEnd\"><strong>Luminaires \u2013 Part 5: Particular Requirements \u2013 Section 7: Lighting Chains<\/strong><\/p>\n<p class=\"isSelectedEnd\">The BIS uniform test-report format identifies the corresponding international reference as:<\/p>\n<p class=\"isSelectedEnd\"><strong>IEC 60598-2-20:2014<\/strong><\/p>\n<p class=\"isSelectedEnd\">and uses the test report form:<\/p>\n<p class=\"isSelectedEnd\"><strong>BIS_LUM\/LC_IS10322-5-7_V1.0<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">The standard specifies particular requirements for lighting chains relating to:<\/p>\n<ul data-spread=\"false\">\n<li>Classification<\/li>\n<li>Construction<\/li>\n<li>Marking<\/li>\n<li>Creepage distances and clearances<\/li>\n<li>Earthing<\/li>\n<li>Terminals<\/li>\n<li>External and internal wiring<\/li>\n<li>Protection against electric shock<\/li>\n<li>Endurance and thermal tests<\/li>\n<li>Resistance to dust and moisture<\/li>\n<li>Insulation resistance<\/li>\n<li>Electric strength<\/li>\n<li>Resistance to heat, fire and tracking<\/li>\n<li>Interconnecting connectors<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What Is an LED Lighting Chain?<\/h1>\n<p class=\"isSelectedEnd\">A lighting chain is an electrical lighting assembly consisting of lamps connected in series, parallel or series\/parallel arrangements with interconnecting insulated conductors.<\/p>\n<p class=\"isSelectedEnd\">Examples include:<\/p>\n<ul data-spread=\"false\">\n<li>Decorative LED string lights<\/li>\n<li>Christmas lights<\/li>\n<li>Festival lights<\/li>\n<li>Celebration lighting chains<\/li>\n<li>Decorative indoor light chains<\/li>\n<li>Decorative outdoor light chains<\/li>\n<li>Event lighting chains<\/li>\n<li>Seasonal decorative lighting<\/li>\n<li>LED chain lights used for architectural decoration<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The exact product classification depends on the actual construction and intended use.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>LED Lighting Chains Under BIS CRS<\/h1>\n<p class=\"isSelectedEnd\">BIS identifies <strong>LED Lighting Chains<\/strong> under the Compulsory Registration Scheme.<\/p>\n<p class=\"isSelectedEnd\">The official BIS CRS standard table lists:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 7):2017 \/ IEC 60598-2-20:2014 \u2013 LED Lighting Chains<\/strong><\/p>\n<p class=\"isSelectedEnd\">and also separately lists the revised:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 7):2026 \u2013 LED Lighting Chains<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">The original MeitY framework also specifically addressed LED Lighting Chains as part of the compulsory registration regime. MeitY&#8217;s guidance confirms that lighting chains are within the CRO scope.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Implementation of LED Lighting Chains Under CRS<\/h1>\n<p class=\"isSelectedEnd\">LED Lighting Chains were brought under the compulsory-registration framework through the Electronics and Information Technology goods regulatory framework.<\/p>\n<p class=\"isSelectedEnd\">The MeitY material identifies <strong>LED Lighting Chains<\/strong> under the relevant IS 10322 Part 5 Section 7 category.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s current CRS database continues to identify the product category and now records both the 2017 and revised 2026 standards.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Current Status of IS 10322 (Part 5\/Sec 7):2017<\/h1>\n<p class=\"isSelectedEnd\">This is an important section for manufacturers.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s <strong>Guidelines for Implementation of Revised Standards for LED Luminaires<\/strong>, dated <strong>20 March 2026<\/strong>, state:<\/p>\n<p class=\"isSelectedEnd\"><strong>Current Standard:<\/strong> IS 10322 (Part 5\/Sec 7):2017<\/p>\n<p class=\"isSelectedEnd\"><strong>Revised Standard:<\/strong> IS 10322 (Part 5\/Sec 7):2026 \/ IEC 60598-2-20:2022<\/p>\n<p class=\"isSelectedEnd\"><strong>Last date of concurrent running:<\/strong> <strong>2 August 2026<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">For existing licensees:<\/p>\n<ul data-spread=\"false\">\n<li>Compliance with the revised standard had to be implemented by 2 August 2026.<\/li>\n<li>Complete test reports from BIS-recognized laboratories were required for lead models previously tested under the old standard.<\/li>\n<li>An undertaking regarding implementation in other existing series models was also required.<\/li>\n<li>Failure to complete the required transition actions could lead to licence cancellation or deletion of models from the licence scope.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">For new applicants:<\/p>\n<ul data-spread=\"false\">\n<li>Applications already having samples submitted\/test reports issued could continue under the old standard during the transition.<\/li>\n<li>New applications could be processed under the old or revised standard only up to 2 August 2026.<\/li>\n<li>Beyond 2 August 2026, no new licence can be granted under the old standard.<\/li>\n<\/ul>\n<h3>What This Means for Manufacturers Today<\/h3>\n<p class=\"isSelectedEnd\">For a <strong>new BIS CRS application in September 2026<\/strong>, manufacturers should plan against:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 7):2026 \/ IEC 60598-2-20:2022<\/strong><\/p>\n<p class=\"isSelectedEnd\">rather than starting a new application under the 2017 edition.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What Changed in the 2026 Standard?<\/h1>\n<p class=\"isSelectedEnd\">BIS identifies several specific changes for Section 7.<\/p>\n<p class=\"isSelectedEnd\">The revised <strong>IS 10322 (Part 5\/Sec 7):2026<\/strong> introduces:<\/p>\n<ul data-spread=\"false\">\n<li>Specific provisions for <strong>Temporarily Installed Protected Lighting (TPL) chains<\/strong><\/li>\n<li>New terms and definitions<\/li>\n<li>Updated references to <strong>IS 10322 Part 1<\/strong><\/li>\n<li>Use of the revised Part 1 framework.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The revised 2026 standard is aligned with:<\/p>\n<p class=\"isSelectedEnd\"><strong>IEC 60598-2-20:2022<\/strong><\/p>\n<p class=\"isSelectedEnd\">rather than the 2014 edition referenced by the 2017 Indian Standard.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Main Safety Requirements Under the 2017 Standard<\/h1>\n<p class=\"isSelectedEnd\">For historical\/legacy 2017 certification and transition understanding, the major requirements included:<\/p>\n<ul data-spread=\"false\">\n<li>General test requirements<\/li>\n<li>Classification<\/li>\n<li>Marking<\/li>\n<li>Construction<\/li>\n<li>Creepage distances and clearances<\/li>\n<li>Provision for earthing<\/li>\n<li>Terminals<\/li>\n<li>External and internal wiring<\/li>\n<li>Protection against electric shock<\/li>\n<li>Endurance tests<\/li>\n<li>Thermal tests<\/li>\n<li>Resistance to dust and moisture<\/li>\n<li>Insulation resistance<\/li>\n<li>Electric strength<\/li>\n<li>Resistance to heat, fire and tracking<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS laboratory listings continue to show these clause-wise requirements for the 2017 version.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Classification of LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">Under the 2017 framework, lighting chains are classified according to the type of protection against electric shock.<\/p>\n<p class=\"isSelectedEnd\">The BIS product information identifies:<\/p>\n<h3>Class II Lighting Chains<\/h3>\n<p class=\"isSelectedEnd\">Products designed with protection against electric shock based on double or reinforced insulation rather than protective earthing.<\/p>\n<h3>Class III Lighting Chains<\/h3>\n<p class=\"isSelectedEnd\">Products designed for operation at Safety Extra-Low Voltage or the applicable low-voltage safety arrangement.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s technical product description specifically identifies Class II and Class III lighting chains.<\/p>\n<p class=\"isSelectedEnd\">The exact classification must be established according to the product&#8217;s electrical design.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Construction Requirements<\/h1>\n<p class=\"isSelectedEnd\">Construction is a major part of lighting-chain safety.<\/p>\n<p class=\"isSelectedEnd\">The product should be designed so that:<\/p>\n<ul data-spread=\"false\">\n<li>Electrical connections are secure<\/li>\n<li>Live parts are properly protected<\/li>\n<li>Components are suitably enclosed<\/li>\n<li>Wiring is properly routed<\/li>\n<li>Mechanical stress does not create unsafe conditions<\/li>\n<li>Control devices are safely enclosed<\/li>\n<li>The chain remains safe during intended use<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS notes that control units and similar devices integral to lighting chains should be enclosed in <strong>non-flammable insulating material<\/strong> and securely fixed to the cable.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Protection Against Electrification of Decorations<\/h1>\n<p class=\"isSelectedEnd\">One important feature of lighting-chain safety is prevention of hazardous energization of nearby decorative metallic materials.<\/p>\n<p class=\"isSelectedEnd\">BIS specifically states that:<\/p>\n<p class=\"isSelectedEnd\"><strong>Lighting chains shall not electrify tinsel or other metallic decorations with which they are used.<\/strong><\/p>\n<p class=\"isSelectedEnd\">This requirement is particularly relevant for festive and decorative lighting applications where chains may be installed around metallic decorative objects.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Cable Requirements for Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">The BIS technical description for the 2017 standard states that the cable used is <strong>single-core<\/strong> and may have:<\/p>\n<ul data-spread=\"false\">\n<li>PVC insulation<\/li>\n<li>Rubber insulation<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">For Class II chains, the cable requirements reference the relevant requirements of <strong>IEC 60227 or IEC 60245<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">For Class III chains, the cable should meet the applicable insulation requirements specified for Class III chains.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Cable Length Requirements<\/h1>\n<p class=\"isSelectedEnd\">The 2017 test-report format includes specific cable requirements.<\/p>\n<p class=\"isSelectedEnd\">For outdoor use:<\/p>\n<ul data-spread=\"false\">\n<li>A splash-proof plug or permanent connection is required as applicable.<\/li>\n<li>The length between the plug and the first lamp or lampholder is required to be at least <strong>1.5 m<\/strong>.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The test report also records maximum lengths for extendable Class II lighting chains:<\/p>\n<ul data-spread=\"false\">\n<li><strong>100 m<\/strong> for 0.5 mm\u00b2 cable<\/li>\n<li><strong>150 m<\/strong> for 0.75 mm\u00b2 cable<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">These are requirements appearing in the published 2017 test-report format.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Creepage Distances and Clearances<\/h1>\n<p class=\"isSelectedEnd\">Creepage distance and clearance requirements are important for preventing unintended electrical arcing and surface leakage.<\/p>\n<p class=\"isSelectedEnd\">The BIS laboratory testing framework identifies <strong>Clause 20.8 \u2013 Creepage Distance and Clearances<\/strong> for the 2017 standard.<\/p>\n<p class=\"isSelectedEnd\">The required distances depend on:<\/p>\n<ul data-spread=\"false\">\n<li>Working voltage<\/li>\n<li>Insulation type<\/li>\n<li>Pollution conditions<\/li>\n<li>Material characteristics<\/li>\n<li>Product construction<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Manufacturers should verify the applicable values using the relevant standard.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Provision for Earthing<\/h1>\n<p class=\"isSelectedEnd\">Where earthing is applicable, the product&#8217;s protective-earth arrangement is evaluated.<\/p>\n<p class=\"isSelectedEnd\">BIS laboratory listings identify <strong>Provision for Earthing<\/strong> as a specific test\/inspection area for the 2017 lighting-chain standard.<\/p>\n<p class=\"isSelectedEnd\">Products classified as Class II have different protection arrangements from products requiring protective earthing.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>External and Internal Wiring<\/h1>\n<p class=\"isSelectedEnd\">The wiring system must be designed and assembled so that it remains safe during operation.<\/p>\n<p class=\"isSelectedEnd\">Testing\/inspection can cover:<\/p>\n<ul data-spread=\"false\">\n<li>Wire type<\/li>\n<li>Insulation<\/li>\n<li>Cross-sectional area<\/li>\n<li>Connection quality<\/li>\n<li>Wire routing<\/li>\n<li>Mechanical protection<\/li>\n<li>Strain protection<\/li>\n<li>Terminal connections<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The published 2017 test-report format specifically records cable properties and mechanical requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Protection Against Electric Shock<\/h1>\n<p class=\"isSelectedEnd\">The product must prevent users from coming into contact with dangerous live parts during intended use.<\/p>\n<p class=\"isSelectedEnd\">BIS identifies:<\/p>\n<p class=\"isSelectedEnd\"><strong>Clause 20.12 \u2013 Protection against electric shock<\/strong><\/p>\n<p class=\"isSelectedEnd\">as part of the lighting-chain testing framework.<\/p>\n<p class=\"isSelectedEnd\">This can include evaluation of:<\/p>\n<ul data-spread=\"false\">\n<li>Accessibility of live parts<\/li>\n<li>Insulation<\/li>\n<li>Connectors<\/li>\n<li>Plugs<\/li>\n<li>Lampholders<\/li>\n<li>Divisible connections<\/li>\n<li>Decorative-metal electrification risks<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Endurance and Thermal Tests<\/h1>\n<p class=\"isSelectedEnd\">Endurance and thermal performance are particularly important for decorative lighting because chains may operate for long periods.<\/p>\n<p class=\"isSelectedEnd\">The BIS technical description explains that endurance and thermal testing represent cyclic heating and cooling conditions encountered in service, and the luminaire\/wiring should not become unsafe under those conditions.<\/p>\n<p class=\"isSelectedEnd\">BIS laboratory listings identify:<\/p>\n<p class=\"isSelectedEnd\"><strong>Clause 20.13 \u2013 Endurance Tests and Thermal Tests<\/strong><\/p>\n<p class=\"isSelectedEnd\">for the 2017 standard.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Resistance to Dust and Moisture<\/h1>\n<p class=\"isSelectedEnd\">Outdoor or exposed lighting chains may encounter humidity, rain, splashing or dust.<\/p>\n<p class=\"isSelectedEnd\">The 2017 BIS test framework includes:<\/p>\n<p class=\"isSelectedEnd\"><strong>Clause 20.14 \u2013 Resistance to Dust &amp; Moisture.<\/strong><\/p>\n<p class=\"isSelectedEnd\">The applicable protection requirements depend on the product construction and intended use.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Insulation Resistance and Electric Strength<\/h1>\n<p class=\"isSelectedEnd\">Electrical insulation must withstand the required electrical stresses.<\/p>\n<p class=\"isSelectedEnd\">The 2017 testing framework includes:<\/p>\n<p class=\"isSelectedEnd\"><strong>Clause 20.15 \u2013 Insulation Resistance and Electric Strength.<\/strong><\/p>\n<p class=\"isSelectedEnd\">These tests are intended to assess whether the insulation system provides adequate protection during operation.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Resistance to Heat, Fire and Tracking<\/h1>\n<p class=\"isSelectedEnd\">Materials used within lighting chains can be exposed to heat generated by lamps, control devices and electrical components.<\/p>\n<p class=\"isSelectedEnd\">The 2017 standard includes:<\/p>\n<p class=\"isSelectedEnd\"><strong>Clause 20.16 \u2013 Resistance to Heat, Fire and Tracking.<\/strong><\/p>\n<p class=\"isSelectedEnd\">This helps assess whether relevant materials remain safe under specified thermal and electrical conditions.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Interconnecting Connectors<\/h1>\n<p class=\"isSelectedEnd\">The 2017 standard includes a dedicated <strong>Annex A<\/strong> for requirements relating to interconnecting connectors used in lighting chains.<\/p>\n<p class=\"isSelectedEnd\">The BIS test-report format covers matters such as:<\/p>\n<ul data-spread=\"false\">\n<li>Connector classification<\/li>\n<li>Connector style<\/li>\n<li>Additional characteristics<\/li>\n<li>Identification<\/li>\n<li>Non-accessibility of live parts<\/li>\n<li>Polarization<\/li>\n<li>Prevention of improper connection<\/li>\n<li>Compatibility between different connector systems<\/li>\n<li>Prevention of unsafe connection to other plug\/socket systems.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Manufacturers using detachable or interconnecting connectors should therefore pay particular attention to the connector design.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Marking Requirements<\/h1>\n<p class=\"isSelectedEnd\">The 2017 BIS product information states that lighting chains should carry information such as:<\/p>\n<ul data-spread=\"false\">\n<li>Rated voltage<\/li>\n<li>Wattage<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS identifies <strong>marking<\/strong> as a specific conformity requirement.<\/p>\n<p class=\"isSelectedEnd\">For CRS products, applicable self-declaration marking requirements also have to be followed according to the current BIS\/CRS procedure.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS Testing for LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">Testing must be performed through a laboratory having the applicable BIS-recognized testing scope.<\/p>\n<p class=\"isSelectedEnd\">The BIS LIMS database currently contains multiple laboratory entries for the lighting-chain standard. Recognized laboratories listed by BIS include facilities such as:<\/p>\n<ul data-spread=\"false\">\n<li>Electronic Regional Test Laboratory (North), Delhi<\/li>\n<li>Intertek India, New Delhi<\/li>\n<li>UL India, Gurugram<\/li>\n<li>National Test House<\/li>\n<li>Other BIS-recognized laboratories with the applicable scope.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Before submission, manufacturers should check the current laboratory scope because the revised 2026 standard is now the applicable route for new applications.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Sample Requirement for LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">The exact number and configuration of test samples should be confirmed with the selected BIS-recognized laboratory before submission.<\/p>\n<p class=\"isSelectedEnd\">Sample selection can depend on:<\/p>\n<ul data-spread=\"false\">\n<li>Product construction<\/li>\n<li>Class II or Class III design<\/li>\n<li>Rated voltage<\/li>\n<li>Control arrangement<\/li>\n<li>Connector arrangement<\/li>\n<li>Outdoor\/indoor intended use<\/li>\n<li>Product series<\/li>\n<li>Model configuration<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS CRS procedures require the applicant to submit the product for testing to a BIS-recognized laboratory according to the applicable guidelines and testing requirements.<\/p>\n<p class=\"isSelectedEnd\">Manufacturers should avoid dispatching samples before the laboratory confirms the current applicable standard and sample arrangement.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS Registration Process for LED Lighting Chains<\/h1>\n<h2>Step 1 \u2013 Product Classification<\/h2>\n<p class=\"isSelectedEnd\">Determine whether the product is a lighting chain and identify:<\/p>\n<ul data-spread=\"false\">\n<li>Class<\/li>\n<li>Voltage<\/li>\n<li>Wattage<\/li>\n<li>Indoor\/outdoor use<\/li>\n<li>Connector configuration<\/li>\n<li>Control unit<\/li>\n<li>Lamp type<\/li>\n<li>Model\/series<\/li>\n<\/ul>\n<h2>Step 2 \u2013 Applicable Standard Verification<\/h2>\n<p class=\"isSelectedEnd\">For a new application after 2 August 2026, verify the applicable revised standard:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 7):2026 \/ IEC 60598-2-20:2022.<\/strong><\/p>\n<h2>Step 3 \u2013 Manufacturer Verification<\/h2>\n<p class=\"isSelectedEnd\">The actual manufacturing unit must be correctly identified.<\/p>\n<h2>Step 4 \u2013 Brand and Model Finalisation<\/h2>\n<p class=\"isSelectedEnd\">Finalize the:<\/p>\n<p class=\"isSelectedEnd\"><strong>Manufacturer + Brand + Product + Model + Technical Configuration<\/strong><\/p>\n<p class=\"isSelectedEnd\">before laboratory testing.<\/p>\n<h2>Step 5 \u2013 Obtain CRS Login<\/h2>\n<p class=\"isSelectedEnd\">The manufacturer follows the BIS CRS procedure to obtain\/login with the required credentials.<\/p>\n<h2>Step 6 \u2013 Generate Test Request<\/h2>\n<p class=\"isSelectedEnd\">The manufacturer enters sample details and selects an approved laboratory through the CRS system.<\/p>\n<h2>Step 7 \u2013 Submit Sample<\/h2>\n<p class=\"isSelectedEnd\">The product sample and Test Request are submitted to the selected laboratory.<\/p>\n<p class=\"isSelectedEnd\">BIS currently instructs applicants to send the sample and Test Request within <strong>60 days of Test Request generation<\/strong>.<\/p>\n<h2>Step 8 \u2013 Product Testing<\/h2>\n<p class=\"isSelectedEnd\">The laboratory tests the LED Lighting Chain against the applicable standard.<\/p>\n<h2>Step 9 \u2013 Test Report<\/h2>\n<p class=\"isSelectedEnd\">The laboratory issues the applicable test report.<\/p>\n<h2>Step 10 \u2013 Verify Test Report<\/h2>\n<p class=\"isSelectedEnd\">The report is verified on the CRS portal.<\/p>\n<h2>Step 11 \u2013 Online Application<\/h2>\n<p class=\"isSelectedEnd\">The manufacturer submits the registration application using the verified report.<\/p>\n<h2>Step 12 \u2013 Documents and Undertaking<\/h2>\n<p class=\"isSelectedEnd\">The required technical, legal, manufacturer, brand and undertaking documents are submitted.<\/p>\n<h2>Step 13 \u2013 BIS Scrutiny<\/h2>\n<p class=\"isSelectedEnd\">BIS examines the application.<\/p>\n<h2>Step 14 \u2013 Clarification<\/h2>\n<p class=\"isSelectedEnd\">Any query raised by BIS is addressed with appropriate supporting documents.<\/p>\n<h2>Step 15 \u2013 CRS Registration<\/h2>\n<p class=\"isSelectedEnd\">After satisfactory processing, BIS grants registration for the approved scope.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Test Report Validity<\/h1>\n<p class=\"isSelectedEnd\">The current BIS CRS instructions state that the test report submitted at the time of online application should <strong>not be more than 90 days old<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">This means manufacturers should plan testing and application submission carefully.<\/p>\n<p class=\"isSelectedEnd\">For a revised-standard application, the report should also correspond to the standard applicable to the application.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS Documents Required for LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">Common documents may include:<\/p>\n<ul data-spread=\"false\">\n<li>Manufacturer business licence<\/li>\n<li>Factory name and address proof<\/li>\n<li>Product technical specification<\/li>\n<li>Product photographs<\/li>\n<li>Rating label<\/li>\n<li>User manual<\/li>\n<li>Circuit diagram<\/li>\n<li>Block diagram<\/li>\n<li>PCB details, where applicable<\/li>\n<li>Control-unit details<\/li>\n<li>LED\/lamp specifications<\/li>\n<li>Cable specifications<\/li>\n<li>Connector specifications<\/li>\n<li>Critical component list<\/li>\n<li>Power supply information<\/li>\n<li>Transformer information, where applicable<\/li>\n<li>Test report from BIS-recognized laboratory<\/li>\n<li>Brand registration certificate<\/li>\n<li>Brand authorization letter, where applicable<\/li>\n<li>Authorized signatory details<\/li>\n<li>Affidavit-cum-undertaking<\/li>\n<li>Other documents specified by BIS<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS requires evidence establishing the manufacturing unit&#8217;s name and address and applicable manufacturing activity for CRS login\/application.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Requirements for Foreign Manufacturers<\/h1>\n<p class=\"isSelectedEnd\">Foreign manufacturers without a liaison office or branch office in India generally need to appoint an <strong>Authorized Indian Representative (AIR)<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s current CRS instructions expressly require such foreign applicants to appoint an AIR according to the prescribed BIS procedure.<\/p>\n<p class=\"isSelectedEnd\">The AIR arrangement should be completed before proceeding with the CRS application.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Requirements for Indian Manufacturers<\/h1>\n<p class=\"isSelectedEnd\">Indian manufacturers should ensure that:<\/p>\n<ul data-spread=\"false\">\n<li>Factory name is correct<\/li>\n<li>Factory address is correct<\/li>\n<li>Brand is correctly documented<\/li>\n<li>Model number is final<\/li>\n<li>Product description is consistent<\/li>\n<li>Test report matches the product<\/li>\n<li>Label matches the application<\/li>\n<li>Technical documentation is complete<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Consistency between the sample, test report and application is important for avoiding clarification.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Brand Requirements<\/h1>\n<p class=\"isSelectedEnd\">LED Lighting Chains can be manufactured under:<\/p>\n<ul data-spread=\"false\">\n<li>Manufacturer-owned brand<\/li>\n<li>OEM brand<\/li>\n<li>Private-label brand<\/li>\n<li>Third-party brand<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Where another entity owns the brand, the applicable authorization documents should be prepared.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s CRS process includes brand registration and authorization documentation where applicable.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Model and Series Considerations<\/h1>\n<p class=\"isSelectedEnd\">A manufacturer may have several LED Lighting Chain models with differences in:<\/p>\n<ul data-spread=\"false\">\n<li>Number of LEDs<\/li>\n<li>Cable length<\/li>\n<li>Wattage<\/li>\n<li>Voltage<\/li>\n<li>Control unit<\/li>\n<li>Flashing modes<\/li>\n<li>Connector<\/li>\n<li>Plug<\/li>\n<li>Enclosure<\/li>\n<li>Indoor\/outdoor configuration<\/li>\n<li>Waterproofing<\/li>\n<li>Cable size<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Model-series coverage should be reviewed before testing.<\/p>\n<p class=\"isSelectedEnd\">BIS allows registered manufacturers to request inclusion of new models of the same product and brand under the same registration, subject to the applicable procedure. The current inclusion procedure states that the relevant test report should be within 90 days of issue at online submission.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Electrical Safety of LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">Electrical safety is a major focus of the applicable standard.<\/p>\n<p class=\"isSelectedEnd\">Important design areas include:<\/p>\n<ul data-spread=\"false\">\n<li>Operating voltage<\/li>\n<li>Insulation<\/li>\n<li>Wiring<\/li>\n<li>Clearances<\/li>\n<li>Creepage distances<\/li>\n<li>Earthing where applicable<\/li>\n<li>Connectors<\/li>\n<li>Plugs<\/li>\n<li>Control units<\/li>\n<li>Enclosures<\/li>\n<li>Strain relief<\/li>\n<li>Protection against electric shock<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Manufacturers should finalize the electrical architecture before testing.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Outdoor LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">Outdoor lighting chains require particular attention to:<\/p>\n<ul data-spread=\"false\">\n<li>Moisture protection<\/li>\n<li>Plug construction<\/li>\n<li>Cable insulation<\/li>\n<li>Connector protection<\/li>\n<li>Enclosure<\/li>\n<li>Strain relief<\/li>\n<li>Water ingress<\/li>\n<li>Mechanical durability<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The 2017 test-report format specifically records requirements for splash-proof plugs or permanent connections when the chain is intended for outdoor use.<\/p>\n<p class=\"isSelectedEnd\">The applicable moisture and protection requirements under the current 2026 standard should be verified with the testing laboratory.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>LED Lighting Chains with Control Units<\/h1>\n<p class=\"isSelectedEnd\">Many decorative lighting chains include:<\/p>\n<ul data-spread=\"false\">\n<li>Flashing controller<\/li>\n<li>Mode selector<\/li>\n<li>Remote-control receiver<\/li>\n<li>Electronic control unit<\/li>\n<li>Dimming function<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Where the control unit forms an integral part of the lighting chain, BIS&#8217;s product description requires it to be enclosed in non-flammable insulating material and securely fixed to the cable.<\/p>\n<p class=\"isSelectedEnd\">The control architecture should therefore be properly documented before testing.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>LED Lighting Chains with Interconnecting Connectors<\/h1>\n<p class=\"isSelectedEnd\">Where a lighting chain includes detachable or extendable connectors, connector safety becomes important.<\/p>\n<p class=\"isSelectedEnd\">The 2017 Annex A contains specific requirements for:<\/p>\n<ul data-spread=\"false\">\n<li>Live-part accessibility<\/li>\n<li>Polarization<\/li>\n<li>Compatibility<\/li>\n<li>Prevention of improper connection<\/li>\n<li>Interconnection safety.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Manufacturers should provide complete connector specifications and photographs to the laboratory.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Product Label and CRS Marking<\/h1>\n<p class=\"isSelectedEnd\">For CRS products, the self-declaration marking requirements must be followed according to the current BIS procedure.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s CRS FAQ states that the declaration should preferably be marked on the product, but where product size makes this impractical it may be marked on the packaging. The marking should be indelible, legible and visible.<\/p>\n<p class=\"isSelectedEnd\">For the lighting-chain product itself, the applicable standard information can include rated voltage and wattage under the relevant product requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS Testing Charges for LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">Testing charges vary by laboratory.<\/p>\n<p class=\"isSelectedEnd\">The BIS LIMS database still displays several legacy 2017 testing entries. Examples include:<\/p>\n<ul data-spread=\"false\">\n<li><strong>\u20b930,000<\/strong> at Atharva Laboratories, Noida<\/li>\n<li><strong>\u20b933,000<\/strong> at Vardhamana Testing Laboratory<\/li>\n<li><strong>\u20b940,000<\/strong> at another current laboratory entry<\/li>\n<li><strong>\u20b945,000<\/strong> at Planet Electro Labs<\/li>\n<li><strong>\u20b950,000<\/strong> at other listed laboratories<\/li>\n<li><strong>\u20b955,000<\/strong> at Bluesky Lab, Ghaziabad<\/li>\n<li><strong>\u20b956,625<\/strong> at another current laboratory listing<\/li>\n<li><strong>\u20b975,000<\/strong> at another listed laboratory.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">These are <strong>laboratory-specific charges excluding applicable taxes<\/strong>.<\/p>\n<h3>Important 2026 Cost Note<\/h3>\n<p class=\"isSelectedEnd\">For the revised <strong>IS 10322 (Part 5\/Sec 7):2026<\/strong>, current BIS LIMS listings also show different laboratory-specific charges, including examples of:<\/p>\n<ul data-spread=\"false\">\n<li><strong>\u20b920,000<\/strong><\/li>\n<li><strong>\u20b935,000<\/strong><\/li>\n<li><strong>\u20b950,000<\/strong><\/li>\n<li><strong>\u20b955,000<\/strong><\/li>\n<li><strong>\u20b971,500<\/strong><\/li>\n<li><strong>\u20b975,000<\/strong><\/li>\n<li><strong>\u20b985,000<\/strong><\/li>\n<li><strong>\u20b91,50,000<\/strong><\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">depending on the laboratory and test scope.<\/p>\n<p class=\"isSelectedEnd\">Because the 2017 standard&#8217;s concurrent period ended on 2 August 2026, manufacturers starting a new application now should obtain a quotation against the <strong>2026 standard<\/strong> rather than budgeting solely on legacy 2017 pricing.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What Is the Total Cost of BIS CRS Registration?<\/h1>\n<p class=\"isSelectedEnd\">Laboratory testing is only one component.<\/p>\n<p class=\"isSelectedEnd\">The total project cost can include:<\/p>\n<ul data-spread=\"false\">\n<li>Laboratory testing<\/li>\n<li>BIS registration-related charges<\/li>\n<li>Sample transportation<\/li>\n<li>Technical documentation<\/li>\n<li>Brand authorization<\/li>\n<li>AIR support for foreign manufacturers<\/li>\n<li>Additional testing<\/li>\n<li>Retesting, if required<\/li>\n<li>Consultant charges<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The final cost depends on the product design, number of models, laboratory and current BIS requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>How Long Does BIS CRS Registration Take?<\/h1>\n<p class=\"isSelectedEnd\">The overall timeline depends on:<\/p>\n<ul data-spread=\"false\">\n<li>Product readiness<\/li>\n<li>Laboratory availability<\/li>\n<li>Testing duration<\/li>\n<li>Documentation completeness<\/li>\n<li>Test result<\/li>\n<li>Application accuracy<\/li>\n<li>BIS scrutiny<\/li>\n<li>Query resolution<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS&#8217;s current CRS process states that the test report should be within 90 days at online application, while the sample and Test Request should be sent to the laboratory within 60 days of Test Request generation.<\/p>\n<p class=\"isSelectedEnd\">Therefore, manufacturers should avoid unnecessary delay between testing and application submission.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Common Reasons for BIS CRS Delays<\/h1>\n<h2>Incorrect Standard Version<\/h2>\n<p class=\"isSelectedEnd\">Starting a new application under the 2017 standard after the 2 August 2026 transition date can create a regulatory problem.<\/p>\n<h2>Incorrect Product Classification<\/h2>\n<p class=\"isSelectedEnd\">The product should correctly fall within the lighting-chain category.<\/p>\n<h2>Model Mismatch<\/h2>\n<p class=\"isSelectedEnd\">The model in the report should match the model in the application.<\/p>\n<h2>Brand Mismatch<\/h2>\n<p class=\"isSelectedEnd\">Brand information should remain consistent.<\/p>\n<h2>Manufacturing Address Mismatch<\/h2>\n<p class=\"isSelectedEnd\">Factory details should match supporting documentation.<\/p>\n<h2>Non-Conforming Sample<\/h2>\n<p class=\"isSelectedEnd\">The lighting chain must comply with the applicable safety requirements.<\/p>\n<h2>Connector Problems<\/h2>\n<p class=\"isSelectedEnd\">Interconnecting connectors can create safety issues if live parts, polarization or compatibility requirements are not satisfied.<\/p>\n<h2>Cable Problems<\/h2>\n<p class=\"isSelectedEnd\">Cable type, insulation, cross-sectional area or length may not satisfy applicable requirements.<\/p>\n<h2>Outdoor Use Without Appropriate Protection<\/h2>\n<p class=\"isSelectedEnd\">Outdoor products require appropriate moisture and connection arrangements.<\/p>\n<h2>Incomplete Technical File<\/h2>\n<p class=\"isSelectedEnd\">Missing circuit diagrams, control-unit information, component details or product specifications can cause queries.<\/p>\n<h2>Old Test Report<\/h2>\n<p class=\"isSelectedEnd\">The current BIS CRS system requires a report not more than 90 days old at online submission.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Is Factory Inspection Required Under BIS CRS?<\/h1>\n<p class=\"isSelectedEnd\">BIS CRS follows a registration-and-testing model and differs from the conventional Scheme-I ISI Mark product-certification process.<\/p>\n<p class=\"isSelectedEnd\">The primary basis is the recognized-laboratory test report and documentary registration process.<\/p>\n<p class=\"isSelectedEnd\">Manufacturers should nevertheless maintain consistent product quality and ensure that registered products remain compliant with the applicable requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS Renewal for LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\">CRS registration must be managed according to the applicable renewal process.<\/p>\n<p class=\"isSelectedEnd\">BIS provides an online renewal mechanism through the CRS portal.<\/p>\n<p class=\"isSelectedEnd\">Manufacturers should monitor:<\/p>\n<ul data-spread=\"false\">\n<li>Registration validity<\/li>\n<li>Product models<\/li>\n<li>Brand<\/li>\n<li>Manufacturing location<\/li>\n<li>Product modifications<\/li>\n<li>Current applicable standard<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Difference Between BIS CRS Registration and BIS ISI Mark Certification<\/h1>\n<p class=\"isSelectedEnd\">BIS CRS Registration and conventional BIS ISI Mark certification are different conformity-assessment systems.<\/p>\n<h3>BIS CRS Registration<\/h3>\n<p class=\"isSelectedEnd\">Used for specified electronic and IT products and based primarily on laboratory testing and registration.<\/p>\n<h3>BIS Scheme-I \/ ISI Mark<\/h3>\n<p class=\"isSelectedEnd\">Used for specified products under the BIS product-certification framework and generally involves broader manufacturing and continuing-conformity requirements.<\/p>\n<p class=\"isSelectedEnd\">LED Lighting Chains covered by the MeitY CRS framework follow the <strong>CRS registration route<\/strong>.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Quick BIS CRS Process for LED Lighting Chains<\/h1>\n<p class=\"isSelectedEnd\"><strong>Product Applicability Check<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Current Standard Verification<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Class &amp; Electrical Configuration Assessment<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Brand &amp; Model Finalisation<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Technical Documentation<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>BIS-Recognized Laboratory Selection<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Generate Test Request<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Sample Submission<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Testing<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Test Report<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Report Verification<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Online CRS Application<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Document Submission<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>BIS Scrutiny<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Query Compliance<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>CRS Registration<\/strong><\/p>\n<p class=\"isSelectedEnd\">\u2193<\/p>\n<p class=\"isSelectedEnd\"><strong>Maintain Ongoing Compliance<\/strong><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Frequently Asked Questions<\/h1>\n<h2>1. What is BIS CRS Certification for LED Lighting Chains?<\/h2>\n<p class=\"isSelectedEnd\">It is the BIS Compulsory Registration Scheme process applicable to LED Lighting Chains covered under the relevant CRS requirements.<\/p>\n<h2>2. Which standard was applicable to LED Lighting Chains before the 2026 revision?<\/h2>\n<p class=\"isSelectedEnd\">The earlier standard was <strong>IS 10322 (Part 5\/Sec 7):2017 \/ IEC 60598-2-20:2014<\/strong>.<\/p>\n<h2>3. What is the current standard for new applications?<\/h2>\n<p class=\"isSelectedEnd\">The revised standard is <strong>IS 10322 (Part 5\/Sec 7):2026 \/ IEC 60598-2-20:2022<\/strong>.<\/p>\n<h2>4. When did the 2017 standard&#8217;s concurrent-running period end?<\/h2>\n<p class=\"isSelectedEnd\"><strong>2 August 2026.<\/strong><\/p>\n<h2>5. Can a new BIS CRS licence still be granted under the 2017 standard?<\/h2>\n<p class=\"isSelectedEnd\">No. BIS&#8217;s March 2026 implementation guideline states that beyond 2 August 2026, no licence shall be granted as per the old standard.<\/p>\n<h2>6. What is IEC 60598-2-20?<\/h2>\n<p class=\"isSelectedEnd\">It is the corresponding IEC particular standard for lighting chains. The 2017 Indian version referenced <strong>IEC 60598-2-20:2014<\/strong>, while the 2026 revision references <strong>IEC 60598-2-20:2022<\/strong>.<\/p>\n<h2>7. What products are considered lighting chains?<\/h2>\n<p class=\"isSelectedEnd\">Products consisting of series-connected, parallel-connected or series\/parallel-connected lamps with interconnecting insulated conductors are described as lighting chains.<\/p>\n<h2>8. Are Christmas and festival LED lights covered?<\/h2>\n<p class=\"isSelectedEnd\">Yes. BIS&#8217;s technical information gives decorative festival and celebratory lighting as examples of lighting chains, and MeitY guidance confirms LED Lighting Chains are covered under the CRO.<\/p>\n<h2>9. What are the main tests under the 2017 standard?<\/h2>\n<p class=\"isSelectedEnd\">Major areas include marking, construction, creepage and clearances, earthing, terminals, wiring, electric-shock protection, endurance and thermal tests, dust and moisture resistance, insulation\/electric strength and resistance to heat, fire and tracking.<\/p>\n<h2>10. Are lighting chains classified as Class II or Class III?<\/h2>\n<p class=\"isSelectedEnd\">Yes. The BIS product description identifies Class II and Class III according to protection against electric shock.<\/p>\n<h2>11. Are control units covered?<\/h2>\n<p class=\"isSelectedEnd\">Yes. Integral control units are part of the lighting-chain safety assessment; BIS states that integral control units should be enclosed in non-flammable insulating material and securely fixed to the cable.<\/p>\n<h2>12. What cable requirements apply?<\/h2>\n<p class=\"isSelectedEnd\">The 2017 technical description identifies single-core cable with PVC or rubber insulation. The test-report format also records cable requirements for Class II and Class III chains.<\/p>\n<h2>13. What is the minimum cable distance between the plug and first lamp for outdoor use?<\/h2>\n<p class=\"isSelectedEnd\">The 2017 test-report format specifies at least <strong>1.5 m<\/strong> between the plug and first lamp or lampholder.<\/p>\n<h2>14. What maximum lengths are listed for extendable Class II chains?<\/h2>\n<p class=\"isSelectedEnd\">The 2017 test-report format lists <strong>100 m for 0.5 mm\u00b2 cable<\/strong> and <strong>150 m for 0.75 mm\u00b2 cable<\/strong>.<\/p>\n<h2>15. Are interconnecting connectors tested?<\/h2>\n<p class=\"isSelectedEnd\">Yes. Annex A of the 2017 test-report format contains specific connector requirements.<\/p>\n<h2>16. Is testing required?<\/h2>\n<p class=\"isSelectedEnd\">Yes. The CRS process requires the product to be tested through a BIS-recognized laboratory.<\/p>\n<h2>17. How old can the test report be?<\/h2>\n<p class=\"isSelectedEnd\">At online submission, the test report should not be more than <strong>90 days old<\/strong>.<\/p>\n<h2>18. How long do I have to send a sample after generating the Test Request?<\/h2>\n<p class=\"isSelectedEnd\">The BIS CRS process currently specifies <strong>60 days<\/strong> for sending the sample and Test Request to the selected laboratory.<\/p>\n<h2>19. Is a foreign manufacturer required to appoint an AIR?<\/h2>\n<p class=\"isSelectedEnd\">A foreign manufacturer without an Indian liaison office or branch office generally needs an Authorized Indian Representative.<\/p>\n<h2>20. Can multiple models be included?<\/h2>\n<p class=\"isSelectedEnd\">Model inclusion may be possible under the applicable BIS procedure, provided the products meet the relevant requirements. BIS provides a formal model-inclusion process.<\/p>\n<h2>21. What documents are required?<\/h2>\n<p class=\"isSelectedEnd\">Typical documents include manufacturing-unit proof, product specifications, labels, circuit\/block diagrams, component information, brand documentation and the recognized-laboratory test report.<\/p>\n<h2>22. What is the current testing cost?<\/h2>\n<p class=\"isSelectedEnd\">Testing charges differ between laboratories. Current BIS LIMS listings show different legacy 2017 charges and separate current 2026 charges.<\/p>\n<h2>23. Is \u20b930,000 the fixed BIS testing charge?<\/h2>\n<p class=\"isSelectedEnd\">No. \u20b930,000 is only one laboratory-specific displayed testing charge for the 2017 version. Other laboratories display different amounts.<\/p>\n<h2>24. Does the testing charge include BIS registration fees?<\/h2>\n<p class=\"isSelectedEnd\">No. Laboratory testing and BIS registration-related expenses are separate.<\/p>\n<h2>25. Is factory inspection conducted under CRS?<\/h2>\n<p class=\"isSelectedEnd\">CRS primarily follows a recognized-laboratory testing and registration framework rather than the routine factory-inspection model associated with many Scheme-I licences.<\/p>\n<h2>26. What happens to an existing 2017 licence?<\/h2>\n<p class=\"isSelectedEnd\">Existing licensees had to implement the revised standard by <strong>2 August 2026<\/strong>, including submission of complete test reports for relevant lead models and the required undertaking for other models.<\/p>\n<h2>27. Can an old 2017 test report be used for a new 2026 application?<\/h2>\n<p class=\"isSelectedEnd\">A new application after the transition date should be planned against the revised 2026 standard. The 2017 report does not automatically establish conformity with the revised requirements.<\/p>\n<h2>28. What is TPL lighting chain under the 2026 standard?<\/h2>\n<p class=\"isSelectedEnd\">The 2026 revision introduces specific provisions for <strong>Temporarily Installed Protected Lighting (TPL) chains<\/strong>.<\/p>\n<h2>29. Do outdoor LED lighting chains need moisture-related testing?<\/h2>\n<p class=\"isSelectedEnd\">Applicable moisture and protection requirements depend on the product&#8217;s construction and intended use. The 2017 framework included resistance-to-dust-and-moisture testing.<\/p>\n<h2>30. Can Qualitance India help with the revised 2026 standard?<\/h2>\n<p class=\"isSelectedEnd\">Yes. Qualitance India can assist with current standard verification, testing coordination, technical documentation and BIS CRS application support.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>People Also Ask<\/h1>\n<h3>Is BIS registration mandatory for LED Lighting Chains?<\/h3>\n<p class=\"isSelectedEnd\">LED Lighting Chains are included in the BIS CRS framework notified for the product category.<\/p>\n<h3>Which IS code is used for LED Lighting Chains?<\/h3>\n<p class=\"isSelectedEnd\">The earlier standard was <strong>IS 10322 (Part 5\/Sec 7):2017<\/strong>. The current revised standard is <strong>IS 10322 (Part 5\/Sec 7):2026<\/strong>.<\/p>\n<h3>What is the IEC standard for LED Lighting Chains?<\/h3>\n<p class=\"isSelectedEnd\">The 2017 Indian standard references <strong>IEC 60598-2-20:2014<\/strong>; the revised 2026 standard references <strong>IEC 60598-2-20:2022<\/strong>.<\/p>\n<h3>Are Christmas LED lights covered by BIS CRS?<\/h3>\n<p class=\"isSelectedEnd\">Decorative festival and celebratory lights are examples of lighting chains, and MeitY&#8217;s CRS guidance confirms LED Lighting Chains are covered by the compulsory-registration framework.<\/p>\n<h3>What tests are required for LED lighting chains?<\/h3>\n<p class=\"isSelectedEnd\">The legacy 2017 framework covered construction, marking, clearances, wiring, electric-shock protection, endurance\/thermal performance, dust and moisture resistance, insulation\/electric strength and heat\/fire\/tracking.<\/p>\n<h3>Can LED string lights be certified under the 2017 standard now?<\/h3>\n<p class=\"isSelectedEnd\">For a new application after <strong>2 August 2026<\/strong>, the revised 2026 standard should be followed because BIS no longer grants new licences under the old 2017 standard.<\/p>\n<h3>What is the LED Lighting Chain BIS testing cost?<\/h3>\n<p class=\"isSelectedEnd\">Legacy 2017 LIMS listings show laboratory-specific charges such as \u20b930,000, \u20b933,000, \u20b940,000, \u20b945,000, \u20b950,000, \u20b955,000 and higher; current 2026 listings also vary widely by laboratory and scope.<\/p>\n<h3>Does an imported LED Lighting Chain need BIS registration?<\/h3>\n<p class=\"isSelectedEnd\">Where the product falls under the compulsory-registration requirements, the applicable CRS registration must be addressed for the manufacturer and manufacturing location.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Frequently Searched Keywords<\/h1>\n<ul data-spread=\"false\">\n<li>BIS CRS Certification for LED Lighting Chains<\/li>\n<li>BIS Registration for LED Lighting Chains<\/li>\n<li>IS 10322 (Part 5\/Sec 7):2017<\/li>\n<li>IS 10322 (Part 5\/Sec 7):2026<\/li>\n<li>IEC 60598-2-20:2014<\/li>\n<li>IEC 60598-2-20:2022<\/li>\n<li>LED Lighting Chain BIS Registration<\/li>\n<li>LED String Lights BIS Certification<\/li>\n<li>Christmas Lights BIS Registration<\/li>\n<li>Festival LED Lights BIS Certification<\/li>\n<li>Decorative LED Lights CRS<\/li>\n<li>LED Chain Lights Testing<\/li>\n<li>Lighting Chain Safety Testing<\/li>\n<li>BIS CRS for Decorative Lights<\/li>\n<li>BIS Consultant for LED Lighting Chains<\/li>\n<li>Compulsory Registration Scheme<\/li>\n<li>BIS Registration Consultancy<\/li>\n<li>LED Lighting Chain Testing Laboratory<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Related BIS CRS Products<\/h1>\n<p class=\"isSelectedEnd\">Other lighting products under the IS 10322 series include:<\/p>\n<ul data-spread=\"false\">\n<li>Fixed General Purpose LED Luminaires<\/li>\n<li>Recessed LED Luminaires<\/li>\n<li>LED Luminaires for Road and Street Lighting<\/li>\n<li>LED Flood Lights<\/li>\n<li>LED Hand Lamps<\/li>\n<li>LED Lighting Chains<\/li>\n<li>LED Luminaires for Emergency Lighting<\/li>\n<li>Rope Lights<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS&#8217;s CRS standard database currently records both earlier and revised 2026 versions for several IS 10322 sections.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Why Choose Qualitance India for BIS CRS Consultancy?<\/h1>\n<p class=\"isSelectedEnd\">Qualitance India provides professional consultancy support for electronic and lighting products requiring BIS CRS registration.<\/p>\n<p class=\"isSelectedEnd\">For <strong>LED Lighting Chains<\/strong>, our support can include:<\/p>\n<ul data-spread=\"false\">\n<li>Product applicability assessment<\/li>\n<li>Current standard verification<\/li>\n<li>2017-to-2026 transition assessment<\/li>\n<li>Product classification<\/li>\n<li>Class II \/ Class III review<\/li>\n<li>Technical specification review<\/li>\n<li>Model and brand assessment<\/li>\n<li>Laboratory selection<\/li>\n<li>Sample submission coordination<\/li>\n<li>Testing coordination<\/li>\n<li>Test report support<\/li>\n<li>Technical document preparation<\/li>\n<li>Brand documentation support<\/li>\n<li>CRS application filing<\/li>\n<li>BIS query handling<\/li>\n<li>Model inclusion support<\/li>\n<li>Renewal guidance<\/li>\n<li>Post-registration compliance support<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Our objective is to help manufacturers align their product design, testing and documentation with the applicable BIS CRS requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS Certification for LED Lighting Chains \u2013 Contact Qualitance India<\/h1>\n<p class=\"isSelectedEnd\">Are you a <strong>LED Lighting Chain manufacturer, OEM, brand owner or importer<\/strong> looking for BIS CRS Registration?<\/p>\n<p class=\"isSelectedEnd\">For new applications, Qualitance India can assist with the current <strong>IS 10322 (Part 5\/Sec 7):2026 \/ IEC 60598-2-20:2022<\/strong> requirements while also helping existing manufacturers understand their transition from the earlier 2017 standard.<\/p>\n<p class=\"isSelectedEnd\"><strong>Qualitance India<\/strong><br \/>\nBIS CRS Certification Consultancy<\/p>\n<p class=\"isSelectedEnd\"><strong>Phone:<\/strong> +91 93106 15170<br \/>\n<strong>Email:<\/strong> <a href=\"mailto:info@qualitanceindia.com\">info@qualitanceindia.com<\/a><br \/>\n<strong>Website:<\/strong> <a href=\"https:\/\/qualitanceindia.com\/\" data-rich-text-autolink=\"\">https:\/\/qualitanceindia.com\/<\/a><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Conclusion<\/h1>\n<p class=\"isSelectedEnd\">LED Lighting Chains are an important category of decorative lighting products and are covered under the BIS Compulsory Registration Scheme framework. The earlier applicable Indian Standard was <strong>IS 10322 (Part 5\/Sec 7):2017 \/ IEC 60598-2-20:2014<\/strong>, which addressed lighting-chain construction, classification, wiring, protection against electric shock, endurance and thermal performance, moisture resistance, insulation, electric strength and resistance to heat, fire and tracking.<\/p>\n<p class=\"isSelectedEnd\">The 2017 framework also contained important requirements for <strong>Class II and Class III lighting chains, cable construction, outdoor-use connections, maximum extendable lengths and interconnecting connectors<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">However, the regulatory position has now changed. BIS revised the standard to <strong>IS 10322 (Part 5\/Sec 7):2026 \/ IEC 60598-2-20:2022<\/strong> and specified <strong>2 August 2026<\/strong> as the last date of concurrent running. BIS states that no new licence can be granted under the 2017 standard after that date, while existing licensees were required to implement the revised standard by the same deadline.<\/p>\n<p class=\"isSelectedEnd\">The revised 2026 standard introduces specific provisions for <strong>Temporarily Installed Protected Lighting (TPL) chains<\/strong>, new terminology and updated references to IS 10322 Part 1.<\/p>\n<p class=\"isSelectedEnd\">Therefore, manufacturers planning a <strong>new BIS CRS application today should use the 2026 standard<\/strong> and confirm the current laboratory testing scope before submitting samples.<\/p>\n<p class=\"isSelectedEnd\">BIS LIMS continues to show laboratory-specific testing charges for the legacy 2017 version as well as the revised 2026 version. The charges vary substantially between laboratories, so the exact quotation should be confirmed according to the applicable current standard and product configuration.<\/p>\n<p class=\"isSelectedEnd\">For professional assistance with <strong>BIS CRS Certification for LED Lighting Chains<\/strong>, Qualitance India provides end-to-end support covering product assessment, current-standard verification, testing coordination, technical documentation, application filing and BIS registration support.<\/p>\n<p><strong>Qualitance India<\/strong><br \/>\n<strong>Phone:<\/strong> +91 93106 15170<br \/>\n<strong>Email:<\/strong> <a href=\"mailto:info@qualitanceindia.com\">info@qualitanceindia.com<\/a><br \/>\n<strong>Website:<\/strong> qualitanceindia.com<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction LED Lighting Chains are widely used for decorative, festive and celebratory lighting in homes, commercial establishments, events, exhibitions, hotels, shopping areas and public spaces. They are commonly known as LED string lights, decorative light chains, festival lights or Christmas lights depending on their design and application. A lighting chain generally consists of a series [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3822,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_total_topic_count_hidden":0,"_bbp_total_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"inline_featured_image":false,"slim_seo":{"title":"BIS CRS Certification for LED Lighting Chains | IS 10322 (Part 5\/Section 7):2017 | BIS Consultancy - Qualitance India","description":"Introduction LED Lighting Chains are widely used for decorative, festive and celebratory lighting in homes, commercial establishments, events, exhibitions, hote"},"_slim_seo_primary_term_category":0,"_slim_seo_primary_term_post_tag":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3821","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/comments?post=3821"}],"version-history":[{"count":1,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3821\/revisions"}],"predecessor-version":[{"id":3823,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3821\/revisions\/3823"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media\/3822"}],"wp:attachment":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media?parent=3821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/categories?post=3821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/tags?post=3821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<!-- This website is optimized by Airlift. Learn more: https://airlift.net. Template:. Learn more: https://airlift.net. Template: 6a4cebdea01328942bf8f471. Config Timestamp: 2026-07-07 12:06:54 UTC, Cached Timestamp: 2026-09-18 12:14:24 UTC, Optimization Time: 4ms -->