{"id":3830,"date":"2026-09-18T10:47:59","date_gmt":"2026-09-18T10:47:59","guid":{"rendered":"https:\/\/qualitanceindia.com\/?p=3830"},"modified":"2026-09-18T10:47:59","modified_gmt":"2026-09-18T10:47:59","slug":"bis-crs-certification-for-led-luminaires-for-road-street-lighting-is-10322-part-5-section-32012-bis-consultancy","status":"publish","type":"post","link":"https:\/\/qualitanceindia.com\/bis-crs-certification-for-led-luminaires-for-road-street-lighting-is-10322-part-5-section-32012-bis-consultancy\/","title":{"rendered":"BIS CRS Certification for LED Luminaires for Road &#038; Street Lighting | IS 10322 (Part 5\/Section 3):2012 | BIS Consultancy"},"content":{"rendered":"<h2>Introduction<\/h2>\n<p class=\"isSelectedEnd\">LED Luminaires for Road and Street Lighting are widely used for roads, streets, highways, public outdoor areas, tunnels, infrastructure projects and other applications where reliable outdoor illumination is required. Because these luminaires are normally installed outdoors and are exposed to electrical, thermal, mechanical and environmental conditions, appropriate product safety and construction requirements are important.<\/p>\n<p class=\"isSelectedEnd\">Under the Bureau of Indian Standards (BIS) Compulsory Registration Scheme (CRS), <strong>LED Luminaires for Road and Street Lighting<\/strong> are covered under <strong>IS 10322 (Part 5\/Section 3):2012<\/strong>. BIS&#8217;s current CRS standard table also lists the revised <strong>IS 10322 (Part 5\/Sec 3):2026<\/strong> for the same product category.<\/p>\n<p class=\"isSelectedEnd\">The original 2012 standard specifies requirements for road and street lighting luminaires for use with tungsten filament, tubular fluorescent, LED, LED modules and other discharge lamps on supply voltages not exceeding <strong>1,000 V<\/strong>. Its scope also includes tunnel lighting and certain column-integrated luminaires.<\/p>\n<h3>Important BIS Update for 2026<\/h3>\n<p class=\"isSelectedEnd\">BIS revised:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 3):2012 \u2192 IS 10322 (Part 5\/Sec 3):2026<\/strong><\/p>\n<p class=\"isSelectedEnd\">The revised standard is listed as the <strong>Second Revision<\/strong>. BIS&#8217;s 31 July 2026 circular extended the concurrent-running period for the old and revised standards until <strong>02 February 2027<\/strong>. The revised standard is associated with <strong>IEC 60598-2-3:2002 + Amendment 1:2011 (CSV)<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">For Section 3 specifically, BIS identifies the main technical changes in the 2026 revision as:<\/p>\n<ul data-spread=\"false\">\n<li>Updated references to IS 10322 (Part 1)<\/li>\n<li>Additional marking requirements<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The revised IS 10322 Part 1:2026 also contains wider changes affecting luminaires, including updated marking provisions, IPX9, EMF safety requirements, PELV provisions, touch-current\/touch-voltage requirements, battery\/EDLC provisions and extended photobiological requirements.<\/p>\n<p class=\"isSelectedEnd\">Manufacturers therefore need to consider the applicable version carefully when planning testing or updating an existing CRS registration.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What Is BIS CRS Certification for LED Road and Street Lighting Luminaires?<\/h1>\n<p class=\"isSelectedEnd\">BIS CRS Certification is a registration-based conformity assessment system for specified electronic and electrical products.<\/p>\n<p class=\"isSelectedEnd\">LED Luminaires for Road and Street Lighting are specifically identified in the BIS CRS product list under:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Section 3):2012<\/strong><\/p>\n<p class=\"isSelectedEnd\">The BIS CRS standard table currently shows both the 2012 and 2026 editions for this product category.<\/p>\n<p class=\"isSelectedEnd\">For registration, the manufacturer has the product tested through an appropriate BIS-recognized laboratory and then submits the required application and documents to BIS.<\/p>\n<p class=\"isSelectedEnd\">After successful registration, the manufacturer can use the applicable CRS registration marking and registration number in accordance with BIS requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS Standard for LED Luminaires for Road and Street Lighting<\/h1>\n<p class=\"isSelectedEnd\">The earlier applicable standard is:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Section 3):2012<\/strong><br \/>\n<strong>Luminaires \u2013 Part 5: Particular Requirements \u2013 Section 3: Luminaires for Road and Street Lighting<\/strong><\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s official standard preview states that the standard covers road, street and other public outdoor lighting applications, tunnel lighting and column-integrated luminaires with a minimum total height above normal ground level of <strong>2.5 m<\/strong>, with applicable supply voltage up to <strong>1,000 V<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s current CRS table lists the revised:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 3):2026 \u2013 Luminaires Part 5: Particular Requirements Section 3: Luminaires for Road and Street Lighting (Second Revision)<\/strong>.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>When Did BIS CRS Requirements Start for LED Road and Street Lighting?<\/h1>\n<p class=\"isSelectedEnd\">The LED Luminaires for Road and Street Lighting category was incorporated into the CRS framework in the applicable 2017 notification, with an effective date of <strong>17 October 2017<\/strong>. The notified product used the standard marking format associated with IS 10322 Part 5 Section 3.<\/p>\n<p class=\"isSelectedEnd\">The BIS CRS information continues to identify LED Luminaires for Road and Street Lighting against IS 10322 (Part 5\/Section 3):2012.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Scope of IS 10322 Part 5 Section 3<\/h1>\n<p class=\"isSelectedEnd\">The 2012 standard covers luminaires intended for:<\/p>\n<ul data-spread=\"false\">\n<li>Road lighting<\/li>\n<li>Street lighting<\/li>\n<li>Other public outdoor lighting applications<\/li>\n<li>Tunnel lighting<\/li>\n<li>Certain column-integrated lighting applications<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">It applies to luminaires using:<\/p>\n<ul data-spread=\"false\">\n<li>LED<\/li>\n<li>LED modules<\/li>\n<li>Tungsten filament lamps<\/li>\n<li>Tubular fluorescent lamps<\/li>\n<li>Other discharge lamps<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The standard covers supply voltages not exceeding <strong>1,000 V<\/strong>. Column-integrated luminaires covered by the stated scope have a minimum total height of <strong>2.5 m<\/strong> above normal ground level.<\/p>\n<p class=\"isSelectedEnd\">For a particular LED product, the exact scope should be confirmed from its design, intended use and applicable current standard.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>What Are LED Road and Street Lighting Luminaires?<\/h1>\n<p class=\"isSelectedEnd\">LED road and street lighting luminaires are complete lighting assemblies designed to illuminate roadways and public outdoor areas. Typical products may contain:<\/p>\n<ul data-spread=\"false\">\n<li>LED modules<\/li>\n<li>LED driver\/control gear<\/li>\n<li>Optical lenses<\/li>\n<li>Reflectors<\/li>\n<li>Housing\/enclosure<\/li>\n<li>Heat sink<\/li>\n<li>Mounting brackets<\/li>\n<li>Cable and terminals<\/li>\n<li>Earthing arrangements<\/li>\n<li>Protective covers<\/li>\n<li>Sealing\/gasket arrangements<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The product may be supplied in multiple wattages, sizes, optical distributions, mounting arrangements and ingress-protection configurations.<\/p>\n<p class=\"isSelectedEnd\">These differences can affect the applicable testing and model coverage.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Major Technical Requirements for LED Street Light BIS Certification<\/h1>\n<p class=\"isSelectedEnd\">BIS LIMS listings for the 2012 standard identify a broad testing structure covering:<\/p>\n<ol start=\"1\" data-spread=\"false\">\n<li>General Test Requirements<\/li>\n<li>Classification of Luminaires<\/li>\n<li>Marking<\/li>\n<li>Construction<\/li>\n<li>Creepage Distances and Clearances<\/li>\n<li>Provision for Earthing<\/li>\n<li>Terminals<\/li>\n<li>External and Internal Wiring<\/li>\n<li>Protection Against Electric Shock<\/li>\n<li>Endurance Tests and Thermal Tests<\/li>\n<li>Resistance to Dust and Moisture<\/li>\n<li>Insulation Resistance and Electric Strength<\/li>\n<li>Resistance to Heat, Fire and Tracking<\/li>\n<li>Photometric Test<\/li>\n<\/ol>\n<p class=\"isSelectedEnd\">These tests are important for both electrical safety and the performance-related characteristics of road and street lighting luminaires.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>1. General Test Requirements<\/h1>\n<p class=\"isSelectedEnd\">The laboratory first establishes the relevant test conditions and assesses the product against the applicable general requirements.<\/p>\n<p class=\"isSelectedEnd\">The exact test program depends on the product&#8217;s construction, electrical characteristics and declared configuration.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>2. Classification of Luminaires<\/h1>\n<p class=\"isSelectedEnd\">The classification of the luminaire is important because different construction and application characteristics can result in different requirements.<\/p>\n<p class=\"isSelectedEnd\">The laboratory may consider matters such as:<\/p>\n<ul data-spread=\"false\">\n<li>Protection against electric shock<\/li>\n<li>Ingress protection<\/li>\n<li>Mounting arrangement<\/li>\n<li>Electrical classification<\/li>\n<li>Intended operating conditions<\/li>\n<li>Construction characteristics<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The manufacturer should ensure that the declared product configuration accurately reflects the actual production model.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>3. Marking Requirements<\/h1>\n<p class=\"isSelectedEnd\">Correct marking is essential for BIS CRS testing and registration.<\/p>\n<p class=\"isSelectedEnd\">Depending on the applicable requirements, product marking can include information such as:<\/p>\n<ul data-spread=\"false\">\n<li>Manufacturer identification<\/li>\n<li>Model\/reference number<\/li>\n<li>Rated voltage<\/li>\n<li>Rated frequency<\/li>\n<li>Rated power<\/li>\n<li>Electrical characteristics<\/li>\n<li>Applicable symbols<\/li>\n<li>Required warnings<\/li>\n<li>Product-specific information<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The product marking, packaging, test report and CRS application should be consistent.<\/p>\n<p class=\"isSelectedEnd\">The 2026 revision specifically introduces <strong>additional marking requirements<\/strong> for Section 3.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>4. Construction Requirements<\/h1>\n<p class=\"isSelectedEnd\">Construction is one of the most important technical areas for outdoor LED street lights.<\/p>\n<p class=\"isSelectedEnd\">The laboratory may examine:<\/p>\n<ul data-spread=\"false\">\n<li>Luminaire housing<\/li>\n<li>LED modules<\/li>\n<li>Driver\/control gear<\/li>\n<li>Heat sink<\/li>\n<li>Optical components<\/li>\n<li>Lens\/cover<\/li>\n<li>Reflectors where applicable<\/li>\n<li>Mounting arrangements<\/li>\n<li>Internal components<\/li>\n<li>Insulating materials<\/li>\n<li>Cable entry<\/li>\n<li>Sealing arrangements<\/li>\n<li>Mechanical construction<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The product should remain mechanically and electrically safe under the applicable operating conditions.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>5. Creepage Distances and Clearances<\/h1>\n<p class=\"isSelectedEnd\">Adequate electrical insulation distances are required between relevant conductive and insulating parts.<\/p>\n<p class=\"isSelectedEnd\">The laboratory checks the applicable creepage and clearance distances.<\/p>\n<p class=\"isSelectedEnd\">Incorrect PCB spacing, driver construction or component arrangement can lead to non-conformity.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>6. Provision for Earthing<\/h1>\n<p class=\"isSelectedEnd\">Where the luminaire requires protective earthing, the earthing arrangement must comply with the applicable requirements.<\/p>\n<p class=\"isSelectedEnd\">The laboratory can assess:<\/p>\n<ul data-spread=\"false\">\n<li>Earth terminal arrangement<\/li>\n<li>Earth conductor connection<\/li>\n<li>Mechanical security<\/li>\n<li>Continuity<\/li>\n<li>Accessible metal parts<\/li>\n<li>Protective connection<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Proper earthing is particularly important for metal-bodied street-light luminaires.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>7. Terminals<\/h1>\n<p class=\"isSelectedEnd\">Terminals used for power supply and other applicable connections are evaluated for compliance.<\/p>\n<p class=\"isSelectedEnd\">The assessment may include:<\/p>\n<ul data-spread=\"false\">\n<li>Terminal construction<\/li>\n<li>Conductor accommodation<\/li>\n<li>Mechanical security<\/li>\n<li>Insulation<\/li>\n<li>Connection arrangements<\/li>\n<li>Accessibility<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>8. External and Internal Wiring<\/h1>\n<p class=\"isSelectedEnd\">Electrical wiring is assessed for suitability and safety.<\/p>\n<p class=\"isSelectedEnd\">The laboratory can evaluate:<\/p>\n<ul data-spread=\"false\">\n<li>Cable type<\/li>\n<li>Conductor size<\/li>\n<li>Insulation<\/li>\n<li>Internal routing<\/li>\n<li>Cable entry<\/li>\n<li>Strain relief<\/li>\n<li>Protection from sharp edges<\/li>\n<li>Protection from heat<\/li>\n<li>Connection security<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">For outdoor street lights, the wiring design should be suitable for the intended operating environment.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>9. Protection Against Electric Shock<\/h1>\n<p class=\"isSelectedEnd\">A road or street lighting luminaire must be constructed so that hazardous live parts are adequately protected.<\/p>\n<p class=\"isSelectedEnd\">The test program evaluates the applicable protective arrangements under relevant test conditions.<\/p>\n<p class=\"isSelectedEnd\">This may involve assessment of:<\/p>\n<ul data-spread=\"false\">\n<li>Accessible conductive parts<\/li>\n<li>Insulation<\/li>\n<li>Enclosure<\/li>\n<li>Protective earthing<\/li>\n<li>Electrical barriers<\/li>\n<li>Protection under operating conditions<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>10. Endurance and Thermal Tests<\/h1>\n<p class=\"isSelectedEnd\">LED street lights generate heat through LED modules and their electronic control gear, making thermal design important.<\/p>\n<p class=\"isSelectedEnd\">The applicable testing evaluates endurance and thermal performance.<\/p>\n<p class=\"isSelectedEnd\">Areas that may be assessed include:<\/p>\n<ul data-spread=\"false\">\n<li>LED operating temperature<\/li>\n<li>Driver temperature<\/li>\n<li>Insulation temperature<\/li>\n<li>Heat sink performance<\/li>\n<li>Enclosure temperature<\/li>\n<li>Thermal stability<\/li>\n<li>Performance after endurance conditions<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Good thermal management is particularly important for high-wattage outdoor luminaires.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>11. Resistance to Dust and Moisture<\/h1>\n<p class=\"isSelectedEnd\">Outdoor street lights are normally exposed to rain, dust, humidity and other environmental conditions.<\/p>\n<p class=\"isSelectedEnd\">The BIS test structure includes resistance to dust and moisture.<\/p>\n<p class=\"isSelectedEnd\">Depending on the declared protection, the laboratory may assess:<\/p>\n<ul data-spread=\"false\">\n<li>Dust ingress<\/li>\n<li>Solid-object protection<\/li>\n<li>Water ingress<\/li>\n<li>Moisture resistance<\/li>\n<li>Post-test electrical safety<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The declared IP rating should accurately represent the configuration submitted for testing.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>12. Insulation Resistance and Electric Strength<\/h1>\n<p class=\"isSelectedEnd\">Electrical insulation is assessed to ensure adequate separation between applicable conductive parts.<\/p>\n<p class=\"isSelectedEnd\">Testing can include:<\/p>\n<ul data-spread=\"false\">\n<li>Insulation resistance<\/li>\n<li>Electric strength<\/li>\n<li>Applicable leakage-related safety checks<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The insulation system must withstand the prescribed test conditions without unsafe breakdown.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>13. Resistance to Heat, Fire and Tracking<\/h1>\n<p class=\"isSelectedEnd\">The materials and construction are examined against applicable heat, fire and tracking requirements.<\/p>\n<p class=\"isSelectedEnd\">The laboratory may evaluate relevant:<\/p>\n<ul data-spread=\"false\">\n<li>Insulating materials<\/li>\n<li>Enclosure materials<\/li>\n<li>Terminal areas<\/li>\n<li>Internal components<\/li>\n<li>Heat-exposed components<\/li>\n<li>Fire-related characteristics<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">This is particularly important where polymeric materials are used inside the luminaire.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>14. Photometric Testing<\/h1>\n<p class=\"isSelectedEnd\">Photometric performance is a major consideration for road and street lighting.<\/p>\n<p class=\"isSelectedEnd\">The 2012 test structure separately identifies <strong>Photometric Test<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">The original BIS standard preview emphasizes the importance of:<\/p>\n<ul data-spread=\"false\">\n<li>Photometric properties<\/li>\n<li>Accurate photometric data<\/li>\n<li>Light distribution<\/li>\n<li>Glare control<\/li>\n<li>Light-controlling components<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The standard describes a <strong>Specific Luminaire Index (SLI)<\/strong> and a three-way classification related to how light is distributed along and across a road and the control of light emitted at high angles. It also discusses correct orientation and maintenance of light-controlling components such as refractors and reflectors.<\/p>\n<p class=\"isSelectedEnd\">For LED street lights, the optical system, LED arrangement, lens and reflector configuration should therefore match the tested model.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Road and Street Lighting Optical Performance<\/h1>\n<p class=\"isSelectedEnd\">Unlike a basic decorative luminaire, a road and street lighting product must generally be designed around controlled light distribution.<\/p>\n<p class=\"isSelectedEnd\">The 2012 BIS material discusses:<\/p>\n<ul data-spread=\"false\">\n<li>Throw of light along the road<\/li>\n<li>Sideways spread across the road<\/li>\n<li>Control of high-angle light<\/li>\n<li>Glare-related characteristics<\/li>\n<li>Photometric data<\/li>\n<li>Refractors and reflectors<\/li>\n<li>Correct optical orientation<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">These characteristics are important when evaluating whether a luminaire is suitable for its intended road-lighting application.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Wind and Mechanical Considerations<\/h1>\n<p class=\"isSelectedEnd\">Outdoor road and street lights are mounted at height and may be exposed to wind loads.<\/p>\n<p class=\"isSelectedEnd\">The BIS technical material for IS 10322 Part 5 Section 3 discusses <strong>drag coefficient measurements in wind tunnels<\/strong> as part of the considerations for luminaire safety and performance.<\/p>\n<p class=\"isSelectedEnd\">Manufacturers should therefore consider the mechanical design, mounting arrangement and intended installation conditions when preparing the product for conformity testing.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Important 2026 Revision for LED Road and Street Lighting<\/h1>\n<p class=\"isSelectedEnd\">The revised <strong>IS 10322 (Part 5\/Sec 3):2026<\/strong> is now listed by BIS alongside the 2012 version.<\/p>\n<p class=\"isSelectedEnd\">For Section 3, BIS identifies these specific changes:<\/p>\n<h3>Updated References to IS 10322 Part 1<\/h3>\n<p class=\"isSelectedEnd\">References have been updated to reflect the revised general luminaire standard.<\/p>\n<h3>Additional Marking Requirements<\/h3>\n<p class=\"isSelectedEnd\">New marking requirements have been introduced for the revised Section 3 standard.<\/p>\n<p class=\"isSelectedEnd\">In addition, the revised IS 10322 Part 1:2026 includes wider changes to general luminaire requirements, including IPX9, EMF safety, PELV, touch-current\/touch-voltage requirements, battery\/EDLC requirements and expanded photobiological provisions.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>2012 vs 2026 Standard<\/h1>\n<p class=\"isSelectedEnd\"><strong>Product:<\/strong> LED Luminaires for Road and Street Lighting<\/p>\n<p class=\"isSelectedEnd\"><strong>Existing Standard:<\/strong> IS 10322 (Part 5\/Sec 3):2012<\/p>\n<p class=\"isSelectedEnd\"><strong>Revised Standard:<\/strong> IS 10322 (Part 5\/Sec 3):2026<\/p>\n<p class=\"isSelectedEnd\"><strong>Revision Status:<\/strong> Second Revision<\/p>\n<p class=\"isSelectedEnd\"><strong>Associated IEC Reference:<\/strong> IEC 60598-2-3:2002 + Amendment 1:2011 (CSV)<\/p>\n<p class=\"isSelectedEnd\"><strong>Original Concurrent-Running Date:<\/strong> 02 August 2026<\/p>\n<p class=\"isSelectedEnd\"><strong>Extended Concurrent-Running Date:<\/strong> 02 February 2027<\/p>\n<p class=\"isSelectedEnd\">As of September 2026, manufacturers should take the revised standard into account when planning new testing, renewal-related work, model changes or implementation of the new standard.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Is IS 10322 Part 5 Section 3:2012 Still Relevant in 2026?<\/h1>\n<p class=\"isSelectedEnd\">Yes, the standard remains relevant during the BIS transition period.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s July 2026 circular specifically extended the concurrent-running period of IS 10322 (Part 5\/Sec 3):2012 and the revised 2026 standard until <strong>02 February 2027<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s March 2026 changeover guideline explains that:<\/p>\n<ul data-spread=\"false\">\n<li>Existing licensees must implement the revised standard in accordance with the transition provisions.<\/li>\n<li>Existing applications meeting the stated conditions may be processed under the old standard.<\/li>\n<li>During the concurrent-running period, new applications may be processed under the old or revised standard as permitted by the guideline.<\/li>\n<li>Beyond the applicable last date of concurrent running, registration cannot be granted under the old standard.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Because the deadline was subsequently extended, manufacturers should rely on the <strong>latest BIS circular<\/strong>, rather than the original August 2026 deadline.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS Model and Licence Coverage for LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">BIS&#8217;s CRS documentation states that for <strong>LED Luminaires for Road and Street Lighting<\/strong>, a single licence is provided for all LED Luminaires for Road and Street Lighting under the relevant product category.<\/p>\n<p class=\"isSelectedEnd\">However, the actual models covered within a registration should still be properly identified and documented in the application and test report.<\/p>\n<p class=\"isSelectedEnd\">Differences in:<\/p>\n<ul data-spread=\"false\">\n<li>Wattage<\/li>\n<li>LED module<\/li>\n<li>Driver<\/li>\n<li>Housing<\/li>\n<li>Optical system<\/li>\n<li>Lens<\/li>\n<li>IP rating<\/li>\n<li>Mounting arrangement<\/li>\n<li>Input rating<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">should be reviewed before testing and inclusion.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Sample Requirements for LED Road and Street Lighting<\/h1>\n<p class=\"isSelectedEnd\">The exact sample requirement should be confirmed with the selected BIS-recognized laboratory according to the product construction and application.<\/p>\n<p class=\"isSelectedEnd\">BIS CRS documents for this product category have historically identified a <strong>20-sample series value<\/strong> for the product group, while the practical laboratory requirement for a particular test program should be confirmed at the time of sample submission.<\/p>\n<p class=\"isSelectedEnd\">Before sending samples, manufacturers should confirm:<\/p>\n<ul data-spread=\"false\">\n<li>Number of complete luminaires<\/li>\n<li>Representative models<\/li>\n<li>Driver configuration<\/li>\n<li>LED module configuration<\/li>\n<li>Optical accessories<\/li>\n<li>Mounting accessories<\/li>\n<li>Cables and connectors<\/li>\n<li>Label\/marking<\/li>\n<li>Any special components required for testing<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Do not dispatch samples based only on a generic sample assumption; the selected laboratory should confirm the exact requirement.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS Testing Process for LED Street Lights<\/h1>\n<h2>Step 1 \u2013 Product Assessment<\/h2>\n<p class=\"isSelectedEnd\">Review the technical characteristics of the LED street light.<\/p>\n<h2>Step 2 \u2013 Identify the Applicable Standard<\/h2>\n<p class=\"isSelectedEnd\">Determine whether the application should be processed under:<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 3):2012<\/strong><\/p>\n<p class=\"isSelectedEnd\">or<\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 (Part 5\/Sec 3):2026<\/strong><\/p>\n<p class=\"isSelectedEnd\">taking into account the current transition requirements.<\/p>\n<h2>Step 3 \u2013 Select BIS-Recognized Laboratory<\/h2>\n<p class=\"isSelectedEnd\">The product must be tested through an appropriate BIS-recognized laboratory for the applicable CRS standard. BIS&#8217;s laboratory system currently shows multiple laboratories with testing scope for this product.<\/p>\n<h2>Step 4 \u2013 Generate Test Request<\/h2>\n<p class=\"isSelectedEnd\">The applicant generates the Test Request through the CRS portal, enters sample details and selects an approved laboratory.<\/p>\n<h2>Step 5 \u2013 Submit Samples<\/h2>\n<p class=\"isSelectedEnd\">The sample and Test Request should be submitted to the laboratory within <strong>60 days of generation of the Test Request<\/strong>. BIS also requires the QR code to be displayed\/pasted on the sample or packet for laboratory processing.<\/p>\n<h2>Step 6 \u2013 Laboratory Testing<\/h2>\n<p class=\"isSelectedEnd\">The laboratory carries out the applicable electrical, construction, environmental and photometric tests.<\/p>\n<h2>Step 7 \u2013 Test Report Verification<\/h2>\n<p class=\"isSelectedEnd\">The manufacturer should verify the report carefully for:<\/p>\n<ul data-spread=\"false\">\n<li>Manufacturer name<\/li>\n<li>Factory address<\/li>\n<li>Brand<\/li>\n<li>Model numbers<\/li>\n<li>Product description<\/li>\n<li>Ratings<\/li>\n<li>Applicable standard<\/li>\n<li>Test results<\/li>\n<li>Representative models<\/li>\n<\/ul>\n<h2>Step 8 \u2013 Online CRS Application<\/h2>\n<p class=\"isSelectedEnd\">BIS requires the application to be submitted online using the prescribed CRS process.<\/p>\n<p class=\"isSelectedEnd\">The test report must be <strong>within 90 days of issue<\/strong> at the time of online submission.<\/p>\n<h2>Step 9 \u2013 Hard Copy Submission<\/h2>\n<p class=\"isSelectedEnd\">The hard copy of the application along with the original test report and prescribed affidavit-cum-undertaking must be submitted within <strong>15 days<\/strong> of online submission.<\/p>\n<h2>Step 10 \u2013 BIS Scrutiny<\/h2>\n<p class=\"isSelectedEnd\">BIS reviews the application and may raise queries.<\/p>\n<h2>Step 11 \u2013 Query Resolution<\/h2>\n<p class=\"isSelectedEnd\">The applicant must provide the required clarification or documents online.<\/p>\n<h2>Step 12 \u2013 CRS Registration<\/h2>\n<p class=\"isSelectedEnd\">After satisfactory completion of scrutiny and compliance requirements, BIS grants registration.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Test Report Validity for BIS CRS<\/h1>\n<p class=\"isSelectedEnd\">BIS states that the test report should not be more than <strong>90 days old at the time of online submission<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">This means testing and application submission should be planned carefully.<\/p>\n<p class=\"isSelectedEnd\">A technically successful report may still create a procedural problem if it becomes too old before the application is submitted.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Documents Required for BIS CRS Certification<\/h1>\n<p class=\"isSelectedEnd\">Typical documents for LED Road and Street Lighting CRS registration may include:<\/p>\n<ul data-spread=\"false\">\n<li>Manufacturer company documents<\/li>\n<li>Factory\/business licence<\/li>\n<li>Manufacturing address proof<\/li>\n<li>Brand\/trademark documents<\/li>\n<li>Product technical specifications<\/li>\n<li>Model list<\/li>\n<li>Product photographs<\/li>\n<li>Circuit diagram<\/li>\n<li>Technical datasheet<\/li>\n<li>Product label artwork<\/li>\n<li>User manual, where applicable<\/li>\n<li>Details of LED modules and control gear<\/li>\n<li>Test report from BIS-recognized laboratory<\/li>\n<li>Authorized signatory documents<\/li>\n<li>Prescribed affidavit-cum-undertaking<\/li>\n<li>Authorization documents where applicable<\/li>\n<li>AIR documents for eligible foreign manufacturers<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS requires Indian applicants to submit the prescribed <strong>Format C affidavit-cum-undertaking<\/strong>. Foreign applicants without an eligible Indian liaison office or branch must appoint an <strong>Authorized Indian Representative (AIR)<\/strong> and comply with the applicable prescribed formats.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS for Foreign Manufacturers of LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">Foreign manufacturers can apply for CRS registration for covered LED luminaires.<\/p>\n<p class=\"isSelectedEnd\">Where a foreign applicant has no liaison office or branch office in India, BIS requires the appointment of an <strong>Authorized Indian Representative (AIR)<\/strong> according to the applicable CRS guidelines.<\/p>\n<p class=\"isSelectedEnd\">The AIR serves as the Indian contact point for the registration and related communication with BIS.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>CRS Marking Requirements for LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">After registration, the manufacturer must follow BIS CRS marking requirements.<\/p>\n<p class=\"isSelectedEnd\">BIS guidance states that the self-declaration should preferably be marked on the product. Where product-size limitations make product marking impractical, it may be placed on the packaging. The marking should be indelible, legible and clearly visible.<\/p>\n<p class=\"isSelectedEnd\">The prescribed declaration includes the applicable Indian Standard and registration number.<\/p>\n<p class=\"isSelectedEnd\">The IS number shown on the product should correspond to the standard under which the product is registered.<\/p>\n<p class=\"isSelectedEnd\">During the 2012-to-2026 transition, manufacturers must pay particular attention to the standard version and applicable marking provisions.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS Testing Charges for LED Luminaires for Road and Street Lighting<\/h1>\n<p class=\"isSelectedEnd\">Testing charges vary from laboratory to laboratory and depend on the complete test scope.<\/p>\n<p class=\"isSelectedEnd\">For the older <strong>IS 10322 (Part 5\/Sec 3):2012<\/strong>, current BIS LIMS listings show examples including:<\/p>\n<ul data-spread=\"false\">\n<li>\u20b933,400<\/li>\n<li>\u20b940,000<\/li>\n<li>\u20b950,000<\/li>\n<li>\u20b955,000<\/li>\n<li>\u20b970,000<\/li>\n<li>\u20b975,000<\/li>\n<li>\u20b977,000<\/li>\n<li>\u20b980,000<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">These are laboratory-specific figures and are generally shown exclusive of taxes. Some laboratories also specify exclusions or discounts.<\/p>\n<p class=\"isSelectedEnd\">For the revised <strong>IS 10322 (Part 5\/Sec 3):2026<\/strong>, current BIS LIMS entries show examples including:<\/p>\n<ul data-spread=\"false\">\n<li>\u20b940,000<\/li>\n<li>\u20b941,000<\/li>\n<li>\u20b950,000<\/li>\n<li>\u20b975,000<\/li>\n<li>\u20b985,000<\/li>\n<li>\u20b91,36,500<\/li>\n<li>\u20b91,50,000<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Again, these are laboratory-specific charges and may have exclusions or different effective dates.<\/p>\n<p class=\"isSelectedEnd\">Therefore, manufacturers should obtain a current quotation from the selected BIS-recognized laboratory before finalizing the testing budget.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS Government Fees for CRS Registration<\/h1>\n<p class=\"isSelectedEnd\">The published BIS CRS fee schedule lists:<\/p>\n<p class=\"isSelectedEnd\"><strong>Application Fee:<\/strong> \u20b91,000<\/p>\n<p class=\"isSelectedEnd\"><strong>Application Processing Fee:<\/strong> \u20b950,000, inclusive of one test report<\/p>\n<p class=\"isSelectedEnd\"><strong>Annual Registration Fee:<\/strong> \u20b91,000<\/p>\n<p class=\"isSelectedEnd\"><strong>Additional Test Report Fee:<\/strong> \u20b920,000 per additional test report<\/p>\n<p class=\"isSelectedEnd\">These government fees are separate from laboratory testing charges and professional consultancy charges.<\/p>\n<p class=\"isSelectedEnd\">The published fee document also provides an MSME concession on the processing fee, subject to the applicable eligibility requirements.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Total Cost of BIS CRS Certification for LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">The overall project cost can include:<\/p>\n<p class=\"isSelectedEnd\"><strong>Laboratory Testing Charges + BIS Government Fees + Additional Test Report Charges, if any + Consultancy Charges + Applicable Taxes<\/strong><\/p>\n<p class=\"isSelectedEnd\">The exact cost depends on:<\/p>\n<ul data-spread=\"false\">\n<li>Product design<\/li>\n<li>Number of representative models<\/li>\n<li>Standard version<\/li>\n<li>Laboratory selected<\/li>\n<li>Testing scope<\/li>\n<li>Additional reports<\/li>\n<li>Model inclusion<\/li>\n<li>Retesting, if required<\/li>\n<li>Foreign-manufacturer\/AIR requirements<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Because the current 2026 laboratory charges vary considerably, an exact fixed project price should not be assumed without reviewing the product.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>BIS CRS Registration Timeline for LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">BIS states a normal processing time of <strong>20 working days for grant of Registration<\/strong>, subject to satisfactory completion of the process. BIS also notes that incomplete applications and delayed responses to queries can increase the overall time.<\/p>\n<p class=\"isSelectedEnd\">The complete project additionally includes the laboratory testing period.<\/p>\n<p class=\"isSelectedEnd\">A typical sequence is:<\/p>\n<p class=\"isSelectedEnd\"><strong>Technical Review \u2192 Sample Preparation \u2192 Test Request \u2192 Laboratory Testing \u2192 Test Report \u2192 Online CRS Application \u2192 Hard Copy Submission \u2192 BIS Scrutiny \u2192 Query Resolution \u2192 Registration<\/strong><\/p>\n<p class=\"isSelectedEnd\">The laboratory testing timeline depends on the selected laboratory, test scope and availability of facilities.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Common Reasons for LED Street Light CRS Testing or Registration Delays<\/h1>\n<p class=\"isSelectedEnd\">Manufacturers may experience delays because of:<\/p>\n<ul data-spread=\"false\">\n<li>Incorrect standard identification<\/li>\n<li>Failure to consider the 2026 revision<\/li>\n<li>Incorrect model grouping<\/li>\n<li>Manufacturer address mismatch<\/li>\n<li>Brand mismatch<\/li>\n<li>Incorrect model numbers<\/li>\n<li>Incomplete technical datasheet<\/li>\n<li>Incorrect label artwork<\/li>\n<li>Wiring problems<\/li>\n<li>Insufficient creepage\/clearance<\/li>\n<li>Earthing problems<\/li>\n<li>Insulation failure<\/li>\n<li>Thermal test failure<\/li>\n<li>Dust\/moisture test failure<\/li>\n<li>Photometric problems<\/li>\n<li>Construction non-conformity<\/li>\n<li>Incorrect IP declaration<\/li>\n<li>Incomplete documentation<\/li>\n<li>Delayed hard-copy submission<\/li>\n<li>Delayed response to BIS queries<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS specifically places responsibility on the applicant for delays resulting from incomplete applications or delayed responses to queries.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Technical Checks Before Sending LED Street Light Samples<\/h1>\n<p class=\"isSelectedEnd\">Manufacturers should review the following before laboratory submission.<\/p>\n<h3>Electrical Design<\/h3>\n<p class=\"isSelectedEnd\">Check:<\/p>\n<ul data-spread=\"false\">\n<li>Rated voltage<\/li>\n<li>Rated frequency<\/li>\n<li>Input current<\/li>\n<li>Power rating<\/li>\n<li>Driver configuration<\/li>\n<li>Protective components<\/li>\n<\/ul>\n<h3>PCB and Driver<\/h3>\n<p class=\"isSelectedEnd\">Verify:<\/p>\n<ul data-spread=\"false\">\n<li>Creepage<\/li>\n<li>Clearance<\/li>\n<li>Insulation<\/li>\n<li>Component placement<\/li>\n<li>Driver temperature<\/li>\n<li>Protective arrangements<\/li>\n<\/ul>\n<h3>Mechanical Construction<\/h3>\n<p class=\"isSelectedEnd\">Check:<\/p>\n<ul data-spread=\"false\">\n<li>Housing<\/li>\n<li>Heat sink<\/li>\n<li>Mounting bracket<\/li>\n<li>Fasteners<\/li>\n<li>Lens\/cover<\/li>\n<li>Sealing<\/li>\n<li>Cable entry<\/li>\n<\/ul>\n<h3>Environmental Protection<\/h3>\n<p class=\"isSelectedEnd\">Confirm:<\/p>\n<ul data-spread=\"false\">\n<li>Declared IP rating<\/li>\n<li>Gaskets<\/li>\n<li>Sealing surfaces<\/li>\n<li>Drainage provisions where applicable<\/li>\n<li>Resistance to water and dust<\/li>\n<\/ul>\n<h3>Optical System<\/h3>\n<p class=\"isSelectedEnd\">Check:<\/p>\n<ul data-spread=\"false\">\n<li>LED configuration<\/li>\n<li>Lens<\/li>\n<li>Reflector<\/li>\n<li>Beam distribution<\/li>\n<li>Optical orientation<\/li>\n<li>Photometric configuration<\/li>\n<\/ul>\n<h3>Marking<\/h3>\n<p class=\"isSelectedEnd\">Verify that all declared ratings and required product information match the application and test report.<\/p>\n<h3>Model List<\/h3>\n<p class=\"isSelectedEnd\">Finalize model numbers before testing so that the test report and registration documents remain consistent.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Model Variations in LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">Manufacturers often offer several street-light variants based on:<\/p>\n<ul data-spread=\"false\">\n<li>20 W<\/li>\n<li>30 W<\/li>\n<li>40 W<\/li>\n<li>50 W<\/li>\n<li>60 W<\/li>\n<li>70 W<\/li>\n<li>90 W<\/li>\n<li>100 W<\/li>\n<li>120 W<\/li>\n<li>150 W<\/li>\n<li>180 W<\/li>\n<li>200 W<\/li>\n<li>Higher-power configurations<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">They may also vary according to:<\/p>\n<ul data-spread=\"false\">\n<li>Housing size<\/li>\n<li>LED manufacturer<\/li>\n<li>Driver<\/li>\n<li>Lens<\/li>\n<li>Beam angle<\/li>\n<li>Colour temperature<\/li>\n<li>IP rating<\/li>\n<li>Mounting type<\/li>\n<li>Input voltage<\/li>\n<li>Dimming function<\/li>\n<li>Control interface<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">Model coverage should be finalized based on the applicable BIS requirements and the technical relationship between the variants.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Can Different Wattage LED Street Lights Be Covered?<\/h1>\n<p class=\"isSelectedEnd\">Different wattage models may be considered under the applicable model\/series provisions, but they should not automatically be assumed to have identical coverage.<\/p>\n<p class=\"isSelectedEnd\">Differences in wattage can affect:<\/p>\n<ul data-spread=\"false\">\n<li>Driver rating<\/li>\n<li>LED quantity<\/li>\n<li>Thermal design<\/li>\n<li>Housing size<\/li>\n<li>Internal wiring<\/li>\n<li>Electrical stress<\/li>\n<li>Photometric characteristics<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">A technical review before sample submission is therefore important.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Can Different IP-Rated Street Lights Be Covered Together?<\/h1>\n<p class=\"isSelectedEnd\">Different IP ratings should be carefully reviewed because ingress-protection performance depends on the actual enclosure, sealing and construction.<\/p>\n<p class=\"isSelectedEnd\">The manufacturer should not assume that one tested configuration automatically covers every different IP construction.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Is Photometric Testing Important for LED Street Lights?<\/h1>\n<p class=\"isSelectedEnd\">Yes. The BIS testing structure for the 2012 standard specifically includes a Photometric Test.<\/p>\n<p class=\"isSelectedEnd\">The standard&#8217;s technical material discusses accurate photometric data, distribution of light, glare control and the classification of light distribution across and along the road.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Is BIS CRS Certification the Same as ISI Mark Certification?<\/h1>\n<p class=\"isSelectedEnd\">No.<\/p>\n<p class=\"isSelectedEnd\">LED Luminaires for Road and Street Lighting are included under the <strong>BIS Compulsory Registration Scheme (CRS \/ Scheme-II)<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">This is different from a conventional BIS Scheme-I licence generally associated with the ISI Mark.<\/p>\n<p class=\"isSelectedEnd\">For this product category, the CRS process involves:<\/p>\n<ul data-spread=\"false\">\n<li>Testing at an appropriate BIS-recognized laboratory<\/li>\n<li>Submission of the CRS application<\/li>\n<li>BIS scrutiny<\/li>\n<li>Grant of registration<\/li>\n<li>Applicable CRS marking<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS&#8217;s Scheme-II information specifically lists LED Luminaires for Road and Street Lighting against IS 10322 Part 5 Section 3.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>CRS Registration for Imported LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">Imported LED street lights are also subject to the applicable CRS framework when covered by the relevant compulsory registration requirement.<\/p>\n<p class=\"isSelectedEnd\">BIS guidance states that registration is for the manufacturer\/factory. For imported products, the foreign manufacturer is responsible for obtaining the required testing and registration, with the importer able to act on behalf of the manufacturer only under the applicable authorization.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Manufacturing Location and CRS Registration<\/h1>\n<p class=\"isSelectedEnd\">The CRS registration number is associated with a unique manufacturing location.<\/p>\n<p class=\"isSelectedEnd\">BIS guidance states that if the same product is manufactured at another location, a separate application is required for that manufacturing location.<\/p>\n<p class=\"isSelectedEnd\">Therefore, manufacturers operating multiple factories should review the registration structure separately for each manufacturing site.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Renewal of BIS CRS Registration<\/h1>\n<p class=\"isSelectedEnd\">BIS states that CRS registration is initially granted for <strong>two years<\/strong> and is renewed thereafter.<\/p>\n<p class=\"isSelectedEnd\">BIS provides an online process for renewal through the CRS portal.<\/p>\n<p class=\"isSelectedEnd\">Manufacturers should also monitor changes in the applicable standard, product models and BIS requirements during renewal.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Model Inclusion After CRS Registration<\/h1>\n<p class=\"isSelectedEnd\">Registered manufacturers can request inclusion of additional models of the same product and brand under the same registration number, subject to the applicable requirements.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s inclusion procedure requires the product to be tested through a BIS-recognized laboratory, with the test report within the applicable 90-day period at online submission.<\/p>\n<p class=\"isSelectedEnd\">The normal BIS processing time indicated for inclusion is <strong>10 working days<\/strong>, subject to satisfactory processing.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>2026 Transition for Existing LED Street Light CRS Holders<\/h1>\n<p class=\"isSelectedEnd\">Existing CRS holders should review the revised 2026 standard rather than waiting until the end of the transition.<\/p>\n<p class=\"isSelectedEnd\">BIS&#8217;s changeover guideline states that existing licensees must ensure conformance to the revised standard through complete test reports for applicable lead models and provide an undertaking regarding implementation for other series models in the existing scope.<\/p>\n<p class=\"isSelectedEnd\">Since BIS extended the concurrent-running period to <strong>02 February 2027<\/strong>, manufacturers now have the revised transition window specified in the July 2026 circular.<\/p>\n<p class=\"isSelectedEnd\">Important areas to review include:<\/p>\n<ul data-spread=\"false\">\n<li>Updated Part 1 references<\/li>\n<li>Additional marking requirements<\/li>\n<li>General Part 1 safety changes<\/li>\n<li>Product construction<\/li>\n<li>Electrical insulation<\/li>\n<li>Environmental protection<\/li>\n<li>Model scope<\/li>\n<li>Test-report requirements<\/li>\n<\/ul>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Benefits of BIS CRS Registration for LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\">Proper BIS CRS registration helps manufacturers maintain compliance with the applicable Indian regulatory framework.<\/p>\n<p class=\"isSelectedEnd\">It also provides a structured conformity process covering:<\/p>\n<ul data-spread=\"false\">\n<li>Electrical safety<\/li>\n<li>Product construction<\/li>\n<li>Thermal performance<\/li>\n<li>Environmental resistance<\/li>\n<li>Insulation<\/li>\n<li>Earthing<\/li>\n<li>Photometric evaluation<\/li>\n<li>Product marking<\/li>\n<li>Regulatory registration<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">For manufacturers participating in projects, procurement programs and commercial supply chains, maintaining the appropriate BIS registration is an important part of product compliance.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>How Qualitance India Helps with BIS CRS Certification for LED Road &amp; Street Lighting<\/h1>\n<p class=\"isSelectedEnd\"><strong>Qualitance India<\/strong> provides BIS CRS consultancy support for manufacturers seeking registration for LED Road and Street Lighting Luminaires.<\/p>\n<p class=\"isSelectedEnd\">Our support can include:<\/p>\n<h3>Standard Identification<\/h3>\n<p class=\"isSelectedEnd\">Reviewing the product and identifying the applicable BIS standard and current 2012-to-2026 transition requirements.<\/p>\n<h3>Technical Pre-Assessment<\/h3>\n<p class=\"isSelectedEnd\">Reviewing product construction, electrical design, model range, optical system and marking before laboratory testing.<\/p>\n<h3>Laboratory Coordination<\/h3>\n<p class=\"isSelectedEnd\">Assisting with selection of an appropriate BIS-recognized laboratory and coordinating Test Request and sample submission.<\/p>\n<h3>Documentation Support<\/h3>\n<p class=\"isSelectedEnd\">Guidance for preparing manufacturer, brand, technical and application documents.<\/p>\n<h3>Test Report Review<\/h3>\n<p class=\"isSelectedEnd\">Checking the laboratory report for manufacturer details, models, ratings, standard references and other application-related information.<\/p>\n<h3>CRS Application Support<\/h3>\n<p class=\"isSelectedEnd\">Assistance with online CRS application and required documents.<\/p>\n<h3>BIS Query Support<\/h3>\n<p class=\"isSelectedEnd\">Assistance with responding to deficiencies or queries raised during BIS scrutiny.<\/p>\n<h3>Model Inclusion<\/h3>\n<p class=\"isSelectedEnd\">Support for adding eligible models under an existing registration.<\/p>\n<h3>Renewal<\/h3>\n<p class=\"isSelectedEnd\">Assistance with CRS renewal and documentation.<\/p>\n<h3>Revised Standard Transition<\/h3>\n<p class=\"isSelectedEnd\">Support for manufacturers moving from <strong>IS 10322 (Part 5\/Sec 3):2012<\/strong> to <strong>IS 10322 (Part 5\/Sec 3):2026<\/strong>.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Quick Process for BIS CRS Certification of LED Street Lights<\/h1>\n<p class=\"isSelectedEnd\"><strong>Product Assessment \u2192 Standard Identification \u2192 Technical Review \u2192 BIS-Recognized Laboratory \u2192 Test Request \u2192 Sample Submission \u2192 Testing \u2192 Test Report \u2192 CRS Online Application \u2192 Hard Copy Submission \u2192 BIS Scrutiny \u2192 Query Resolution \u2192 Registration<\/strong><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Frequently Asked Questions About BIS CRS Certification for LED Road &amp; Street Lighting<\/h1>\n<h3>1. Is BIS CRS Certification required for LED Road and Street Lighting Luminaires?<\/h3>\n<p class=\"isSelectedEnd\">LED Luminaires for Road and Street Lighting are listed under the BIS CRS framework against IS 10322 (Part 5\/Section 3):2012.<\/p>\n<h3>2. What is the BIS standard for LED Street Lights?<\/h3>\n<p class=\"isSelectedEnd\">The earlier applicable standard is <strong>IS 10322 (Part 5\/Sec 3):2012<\/strong> and BIS currently also lists the revised <strong>IS 10322 (Part 5\/Sec 3):2026<\/strong>.<\/p>\n<h3>3. What is the title of IS 10322 Part 5 Section 3?<\/h3>\n<p class=\"isSelectedEnd\"><strong>Luminaires \u2013 Part 5: Particular Requirements \u2013 Section 3: Luminaires for Road and Street Lighting.<\/strong><\/p>\n<h3>4. What voltage range does the 2012 standard cover?<\/h3>\n<p class=\"isSelectedEnd\">The standard covers applicable lighting products for supply voltages not exceeding <strong>1,000 V<\/strong>.<\/p>\n<h3>5. Does the standard cover tunnel lighting?<\/h3>\n<p class=\"isSelectedEnd\">Yes. Tunnel lighting is specifically included in the scope.<\/p>\n<h3>6. Does it cover column-integrated luminaires?<\/h3>\n<p class=\"isSelectedEnd\">Yes. The 2012 scope includes column-integrated luminaires with a minimum total height above normal ground level of <strong>2.5 m<\/strong>.<\/p>\n<h3>7. What is the revised standard?<\/h3>\n<p class=\"isSelectedEnd\">The revised standard is <strong>IS 10322 (Part 5\/Sec 3):2026<\/strong>.<\/p>\n<h3>8. Is the 2012 standard still relevant in September 2026?<\/h3>\n<p class=\"isSelectedEnd\">Yes. BIS has extended concurrent running of the 2012 and 2026 standards until <strong>02 February 2027<\/strong>.<\/p>\n<h3>9. What are the major 2026 changes specific to Section 3?<\/h3>\n<p class=\"isSelectedEnd\">BIS identifies updated references to IS 10322 Part 1 and additional marking requirements.<\/p>\n<h3>10. Does the revised Part 1 also affect road and street lighting?<\/h3>\n<p class=\"isSelectedEnd\">Yes. Section 3 works together with the applicable general requirements of Part 1, which has also been revised in 2026.<\/p>\n<h3>11. Is photometric testing required?<\/h3>\n<p class=\"isSelectedEnd\">The 2012 BIS testing structure includes a separate Photometric Test.<\/p>\n<h3>12. Is thermal testing required?<\/h3>\n<p class=\"isSelectedEnd\">Yes. Endurance and thermal testing is one of the listed test areas.<\/p>\n<h3>13. Is dust and moisture testing required?<\/h3>\n<p class=\"isSelectedEnd\">The testing structure includes resistance to dust and moisture.<\/p>\n<h3>14. Is insulation testing required?<\/h3>\n<p class=\"isSelectedEnd\">Yes. Insulation resistance and electric-strength testing are included.<\/p>\n<h3>15. Is earthing checked?<\/h3>\n<p class=\"isSelectedEnd\">Yes. Provision for earthing is a separate compliance area in the BIS test structure.<\/p>\n<h3>16. Are creepage and clearances checked?<\/h3>\n<p class=\"isSelectedEnd\">Yes. Creepage distances and clearances are separately evaluated.<\/p>\n<h3>17. Does wiring form part of testing?<\/h3>\n<p class=\"isSelectedEnd\">Yes. External and internal wiring is separately assessed.<\/p>\n<h3>18. Can different wattage street lights be included together?<\/h3>\n<p class=\"isSelectedEnd\">Model coverage depends on technical similarity and applicable BIS requirements. Different wattages should be evaluated before deciding representative models.<\/p>\n<h3>19. Can different IP ratings be grouped together?<\/h3>\n<p class=\"isSelectedEnd\">This should be technically assessed. The IP construction and sealing arrangements may differ between models.<\/p>\n<h3>20. How many samples are required?<\/h3>\n<p class=\"isSelectedEnd\">Historical CRS documentation lists a series value of <strong>20<\/strong> for this product category, but the exact laboratory sample requirement should be confirmed for the specific application and test program.<\/p>\n<h3>21. Which laboratories can test LED Street Lights?<\/h3>\n<p class=\"isSelectedEnd\">BIS&#8217;s laboratory database lists laboratories recognized for IS 10322 Part 5 Section 3, including laboratories with scope for the 2012 and now 2026 editions.<\/p>\n<h3>22. How old can the test report be?<\/h3>\n<p class=\"isSelectedEnd\">The test report should be within <strong>90 days of issue<\/strong> at the time of online application submission.<\/p>\n<h3>23. How quickly must the sample be sent to the laboratory?<\/h3>\n<p class=\"isSelectedEnd\">The sample and Test Request should be sent within <strong>60 days<\/strong> of Test Request generation.<\/p>\n<h3>24. How soon must hard copies be submitted?<\/h3>\n<p class=\"isSelectedEnd\">Hard copies must be submitted within <strong>15 days<\/strong> of online application submission.<\/p>\n<h3>25. What is the normal BIS processing time?<\/h3>\n<p class=\"isSelectedEnd\">BIS states a normal time of <strong>20 working days<\/strong> for grant of Registration, subject to satisfactory processing.<\/p>\n<h3>26. What is the testing cost under IS 10322 Part 5 Section 3:2012?<\/h3>\n<p class=\"isSelectedEnd\">Current BIS LIMS listings show laboratory-specific examples ranging from roughly <strong>\u20b933,400 to \u20b980,000<\/strong>, with some facilities showing different scope and exclusions.<\/p>\n<h3>27. What is the testing cost under the 2026 standard?<\/h3>\n<p class=\"isSelectedEnd\">Current BIS LIMS examples range from approximately <strong>\u20b940,000 to \u20b91,50,000<\/strong>, depending on the laboratory and test scope.<\/p>\n<h3>28. What are the BIS government fees?<\/h3>\n<p class=\"isSelectedEnd\">The published CRS fee schedule lists \u20b91,000 application fee, \u20b950,000 processing fee including one test report and \u20b91,000 annual registration fee, with additional-test-report and other provisions as applicable.<\/p>\n<h3>29. Is AIR required for foreign manufacturers?<\/h3>\n<p class=\"isSelectedEnd\">Foreign applicants without an eligible Indian liaison office or branch must appoint an Authorized Indian Representative according to BIS requirements.<\/p>\n<h3>30. Is CRS the same as an ISI Mark licence?<\/h3>\n<p class=\"isSelectedEnd\">No. This product category is covered under the BIS CRS\/Registration framework rather than the conventional Scheme-I ISI Mark licensing system.<\/p>\n<h3>31. Can additional models be added later?<\/h3>\n<p class=\"isSelectedEnd\">Registered manufacturers can apply for inclusion of new models of the same product and brand under the same registration, subject to BIS requirements.<\/p>\n<h3>32. How long is CRS registration valid?<\/h3>\n<p class=\"isSelectedEnd\">BIS states that registration is initially granted for <strong>two years<\/strong> and is renewed thereafter.<\/p>\n<h3>33. Does manufacturing location matter?<\/h3>\n<p class=\"isSelectedEnd\">Yes. BIS guidance states that a separate manufacturing location requires a separate application.<\/p>\n<h3>34. Can imported LED Street Lights receive CRS registration?<\/h3>\n<p class=\"isSelectedEnd\">Yes, provided the applicable CRS requirements are fulfilled by the foreign manufacturer and related parties.<\/p>\n<h3>35. What can cause laboratory failure?<\/h3>\n<p class=\"isSelectedEnd\">Potential issues include electrical insulation, creepage\/clearance, wiring, earthing, thermal performance, moisture ingress, construction, fire\/material characteristics and photometric performance.<\/p>\n<h3>36. Why is the 2026 transition important?<\/h3>\n<p class=\"isSelectedEnd\">Because the revised Section 3 standard introduces additional marking requirements and updated Part 1 references, while the general Part 1 standard itself has undergone significant revision.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Frequently Searched Topics Related to LED Street Light BIS Certification<\/h1>\n<p class=\"isSelectedEnd\"><strong>BIS CRS Certification for LED Street Lights<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>LED Street Light BIS Registration<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322 Part 5 Section 3 Certification<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322:2012 Road and Street Lighting<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>IS 10322:2026 Road and Street Lighting<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>BIS Testing for LED Street Lights<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>BIS Recognized Laboratory for Street Lights<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>BIS CRS Consultant for LED Lighting<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Road Lighting BIS Certification<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>Street Light Certification in India<\/strong><\/p>\n<p class=\"isSelectedEnd\"><strong>BIS Registration for Outdoor LED Luminaires<\/strong><\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Related BIS CRS Lighting Products<\/h1>\n<p class=\"isSelectedEnd\">Manufacturers of LED lighting products may also need to evaluate other categories under the IS 10322 series, including:<\/p>\n<ul data-spread=\"false\">\n<li>Fixed General Purpose LED Luminaires<\/li>\n<li>Recessed LED Luminaires<\/li>\n<li>LED Flood Lights<\/li>\n<li>LED Hand Lamps<\/li>\n<li>LED Lighting Chains<\/li>\n<li>LED Luminaires for Emergency Lighting<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">BIS&#8217;s current CRS table lists both legacy and revised standards across these product categories.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Contact Qualitance India for BIS CRS Certification<\/h1>\n<p class=\"isSelectedEnd\"><strong>Qualitance India<\/strong><br \/>\nBIS Certification &amp; Compliance Consultancy<\/p>\n<p class=\"isSelectedEnd\"><strong>Phone:<\/strong> +91 93106 15170<br \/>\n<strong>Email:<\/strong> <a href=\"mailto:info@qualitanceindia.com\">info@qualitanceindia.com<\/a><br \/>\n<strong>Website:<\/strong> qualitanceindia.com<\/p>\n<p class=\"isSelectedEnd\">For manufacturers of LED Road and Street Lighting Luminaires, Qualitance India provides consultancy support covering standard identification, laboratory coordination, product testing, technical documentation, CRS application, BIS query support, model inclusion, renewal and revised-standard transition.<\/p>\n<div contenteditable=\"false\">\n<hr \/>\n<\/div>\n<h1>Conclusion<\/h1>\n<p class=\"isSelectedEnd\">BIS CRS Certification is an important compliance requirement for <strong>LED Luminaires for Road and Street Lighting<\/strong> covered under <strong>IS 10322 (Part 5\/Section 3)<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">The earlier standard, <strong>IS 10322 (Part 5\/Sec 3):2012<\/strong>, has been revised to <strong>IS 10322 (Part 5\/Sec 3):2026<\/strong>, and BIS has extended the concurrent-running period until <strong>02 February 2027<\/strong>.<\/p>\n<p class=\"isSelectedEnd\">The certification process involves identifying the applicable standard, reviewing the product design and model range, selecting a BIS-recognized laboratory, conducting the required electrical, construction, environmental and photometric testing, obtaining the test report, submitting the CRS application and completing BIS scrutiny.<\/p>\n<p class=\"isSelectedEnd\">For manufacturers currently working with the 2012 standard, the 2026 revision should be considered carefully, particularly the <strong>updated Part 1 references and additional marking requirements<\/strong> identified by BIS.<\/p>\n<p><strong>Qualitance India<\/strong> provides professional consultancy support for <strong>BIS CRS Certification for LED Luminaires for Road &amp; Street Lighting, IS 10322 Part 5 Section 3 testing, CRS Registration, model inclusion, renewal and 2012-to-2026 standard transition compliance.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction LED Luminaires for Road and Street Lighting are widely used for roads, streets, highways, public outdoor areas, tunnels, infrastructure projects and other applications where reliable outdoor illumination is required. Because these luminaires are normally installed outdoors and are exposed to electrical, thermal, mechanical and environmental conditions, appropriate product safety and construction requirements are important. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3831,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_total_topic_count_hidden":0,"_bbp_total_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"inline_featured_image":false,"slim_seo":{"title":"BIS CRS Certification for LED Luminaires for Road & Street Lighting | IS 10322 (Part 5\/Section 3):2012 | BIS Consultancy - Qualitance India","description":"Introduction LED Luminaires for Road and Street Lighting are widely used for roads, streets, highways, public outdoor areas, tunnels, infrastructure projects an"},"_slim_seo_primary_term_category":0,"_slim_seo_primary_term_post_tag":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3830","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/comments?post=3830"}],"version-history":[{"count":1,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3830\/revisions"}],"predecessor-version":[{"id":3832,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3830\/revisions\/3832"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media\/3831"}],"wp:attachment":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media?parent=3830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/categories?post=3830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/tags?post=3830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<!-- This website is optimized by Airlift. Learn more: https://airlift.net. Template:. Learn more: https://airlift.net. Template: 6a4cebdea01328942bf8f471. Config Timestamp: 2026-07-07 12:06:54 UTC, Cached Timestamp: 2026-09-18 13:00:59 UTC, Optimization Time: 2.07ms -->