{"id":3362,"date":"2026-08-07T07:44:29","date_gmt":"2026-08-07T07:44:29","guid":{"rendered":"https:\/\/qualitanceindia.com\/?p=3362"},"modified":"2026-08-07T07:44:29","modified_gmt":"2026-08-07T07:44:29","slug":"bis-certification-for-electric-centrifugal-juicers-in-india-complete-guide-is-302-part-12024","status":"publish","type":"post","link":"https:\/\/qualitanceindia.com\/bis-certification-for-electric-centrifugal-juicers-in-india-complete-guide-is-302-part-12024\/","title":{"rendered":"BIS Certification for Electric Centrifugal Juicers in India: Complete Guide (IS 302 Part 1:2024)"},"content":{"rendered":"<h1 class=\"mt-3 -mb-1 text-[1.375rem] font-bold\" dir=\"ltr\" data-sourcepos=\"1:1-1:99;0-98\">BIS Certification for Electric Centrifugal Juicers in India: Complete Guide (IS 302 Part 1:2024)<\/h1>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"3:1-3:490;100-589\">If you manufacture, import, or sell electric centrifugal juicers in India, there&#8217;s a compliance deadline you can&#8217;t afford to ignore. Under the government&#8217;s new Quality Control Order for household and commercial electrical appliances, electric centrifugal juicers sold in the country will need to carry the BIS ISI Mark starting 1st October 2026. This guide breaks down exactly what that means for your business, what the standard covers, and how to get certified without last-minute panic.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"5:1-5:24;591-614\">Why This Matters Now<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"7:1-7:429;616-1044\">The Ministry of Commerce and Industry notified the Safety of Household, Commercial and Similar Electrical Appliances (Quality Control) Order, 2026 on 6th April 2026. It replaces the earlier 2025 order and brings over 90 categories of electrical appliances under mandatory BIS certification \u2014 including juicers and food processors used in kitchens, alongside mixers, cooking ranges, ovens, and dozens of other household products.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"9:1-9:40;1046-1085\">The rollout is phased by business size:<\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3 print:block print:space-y-1\" dir=\"ltr\" data-sourcepos=\"10:1-12:61;1086-1272\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"10:1-10:63;1086-1148\">Large enterprises: compliance required from 1st October 2026<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"11:1-11:63;1149-1211\">Small enterprises: compliance required from 1st January 2027<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"12:1-12:61;1212-1272\">Micro enterprises: compliance required from 1st April 2027<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"14:1-14:403;1274-1676\">Once your deadline hits, manufacturing, importing, or selling an electric centrifugal juicer without a valid BIS license and ISI Mark is illegal \u2014 and enforcement isn&#8217;t just theoretical. Non-compliant products can be seized, businesses can face fines and legal action under the BIS Act, 2016, and major e-commerce platforms are already tightening requirements around BIS proof before allowing listings.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"16:1-16:25;1678-1702\">What Standard Applies<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"18:1-18:403;1704-2106\">Electric centrifugal juicers are certified against <strong>IS 302 (Part 1):2024<\/strong>, which is India&#8217;s version of the international safety standard <strong>IEC 60335-1:2020<\/strong> for household and similar electrical appliances. This is the &#8220;general safety&#8221; standard \u2014 it covers things like protection against electric shock, safe temperature limits, internal wiring, mechanical stability, insulation, and fire resistance.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"20:1-20:489;2108-2596\">On top of this general standard, every appliance also needs to meet a product-specific &#8220;Part 2&#8221; standard. For centrifugal juicers, this adds requirements specific to the high-speed rotating shredder disc and mesh basket at the core of the machine \u2014 including lid and feed-chute interlocks so the motor can&#8217;t run with the lid open, guarding around the fast-spinning basket, motor overload cut-off during continuous use, and pulp-container\/base stability while the unit is running at speed.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"22:1-22:30;2598-2627\">Who Needs to Get Certified<\/h2>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3 print:block print:space-y-1\" dir=\"ltr\" data-sourcepos=\"24:1-28:72;2629-3169\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"24:1-24:114;2629-2742\">Indian manufacturers producing electric centrifugal juicers under their own brand or as a contract manufacturer<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"25:1-25:159;2743-2901\">Foreign manufacturers exporting centrifugal juicers into India (via the Foreign Manufacturers Certification Scheme, with a locally appointed representative)<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"26:1-26:99;2902-3000\">Private-label sellers and brands selling through Amazon, Flipkart, Meesho, or other marketplaces<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"27:1-27:97;3001-3097\">Small appliance workshops supplying to kitchenware retailers and juice bar equipment suppliers<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"28:1-28:72;3098-3169\">Anyone repackaging or rebranding imported units for the Indian market<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"30:1-30:139;3171-3309\">If your product reaches an Indian kitchen or juice business, this applies to you \u2014 regardless of whether you make it locally or import it.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"32:1-32:43;3311-3353\">The Certification Process, Step by Step<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"34:1-35:257;3355-3633\"><strong>1. Gap Assessment<\/strong> Before spending money on lab testing, your product design, wiring, motor rating, and lid\/feed-chute interlock mechanism are checked against the standard to catch problems early \u2014 things like a missing lid interlock or an inadequately guarded shredder disc.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"37:1-38:278;3635-3931\"><strong>2. Lab Testing<\/strong> Sample units go to a BIS-recognized laboratory for testing: electric shock protection, leakage current, temperature rise during continuous operation, mechanical strength and stability, lid interlock and basket guard reliability, and moisture resistance, among other parameters.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"40:1-41:158;3933-4116\"><strong>3. Application Filing<\/strong> Once test reports are in hand, the application goes in through the BIS portal, along with your factory details, technical documentation, and the lab reports.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"43:1-44:235;4118-4373\"><strong>4. Factory Audit<\/strong> A BIS inspector visits your factory to confirm that what&#8217;s actually being produced matches the tested sample \u2014 checking your quality control systems, test equipment (or a valid outsourcing arrangement), and traceability of components.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"46:1-47:110;4375-4505\"><strong>5. License Grant<\/strong> Once everything checks out, BIS issues the license and you&#8217;re authorized to put the ISI Mark on your product.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"49:1-50:143;4507-4675\"><strong>6. Ongoing Compliance<\/strong> Certification isn&#8217;t a one-time event \u2014 expect periodic surveillance audits, re-testing, and license renewal to keep your certification active.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"52:1-52:25;4677-4701\">Documents You&#8217;ll Need<\/h2>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3 print:block print:space-y-1\" dir=\"ltr\" data-sourcepos=\"54:1-61:90;4703-5184\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"54:1-54:46;4703-4748\">GST registration and Udyam\/MSME certificate<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"55:1-55:39;4749-4787\">Factory registration and layout plan<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"56:1-56:41;4788-4828\">Technical drawings and wiring diagrams<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"57:1-57:103;4829-4931\">Bill of materials with supplier\/component details (including motor and shredder disc specifications)<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"58:1-58:85;4932-5016\">Details of in-house test equipment, or an agreement with an accredited outside lab<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"59:1-59:31;5017-5047\">Authorized signatory details<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"60:1-60:47;5048-5094\">Trademark\/brand documentation, if applicable<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"61:1-61:90;5095-5184\">For foreign manufacturers: appointment letter for your Authorised Indian Representative<\/li>\n<\/ul>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"63:1-63:33;5186-5218\">Why Applications Get Rejected<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"65:1-65:58;5220-5277\">Most rejections and delays come down to avoidable issues:<\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3 print:block print:space-y-1\" dir=\"ltr\" data-sourcepos=\"66:1-72:67;5278-5787\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"66:1-66:88;5278-5365\">Applying under Part 1 alone and missing the correct Part 2 standard for the appliance<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"67:1-67:65;5366-5430\">Test samples that don&#8217;t actually match the units in production<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"68:1-68:85;5431-5515\">Missing or poorly designed lid interlocks that let the motor run with the lid open<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"69:1-69:79;5516-5594\">Motor overheating during extended juicing cycles not addressed in the design<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"70:1-70:41;5595-5635\">Incomplete or mismatched documentation<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"71:1-71:85;5636-5720\">Not having adequate in-house testing capability or a valid outsourcing arrangement<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"72:1-72:67;5721-5787\">Factory audit findings that show inconsistent production quality<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"74:1-74:100;5789-5888\">Getting these right the first time is the difference between an 8-week process and a 4-6 month one.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"76:1-76:39;5890-5928\">How Long It Takes and What It Costs<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"78:1-78:453;5930-6382\">For a domestic manufacturer with documentation ready and a design that clears testing on the first try, the whole process usually takes <strong>8 to 16 weeks<\/strong>. More complex cases \u2014 foreign manufacturer applications, or products that need redesign after failing a test \u2014 can stretch to 4-6 months. Costs depend on your product, the testing lab, and how many test cycles are needed, so it&#8217;s worth getting a clear, itemized quote before you commit to anything.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"80:1-80:162;6384-6545\">Given the phased deadlines are already public and enforcement dates are fixed, starting early isn&#8217;t just advisable \u2014 it&#8217;s the only way to avoid a scramble later.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"82:1-82:35;6547-6581\">The Upside of Getting Certified<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"84:1-84:497;6583-7079\">Beyond just staying on the right side of the law, BIS certification opens doors: it&#8217;s now a prerequisite for listing on most major e-commerce platforms, it builds trust with retailers and consumers who recognize the ISI Mark, and it reduces your liability if something ever goes wrong with a unit in the field. Manufacturers who get ahead of the deadline also avoid the bottleneck that&#8217;s likely to hit testing labs and BIS offices as the October 2026 date gets closer and everyone rushes at once.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"86:1-86:30;7081-7110\">How Qualitance India Helps<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"88:1-88:200;7112-7311\">Getting through this process smoothly comes down to documentation accuracy, picking the right lab, and being fully prepared before the factory audit \u2014 this is exactly where Qualitance India steps in.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"90:1-90:11;7313-7323\">We handle:<\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3 print:block print:space-y-1\" dir=\"ltr\" data-sourcepos=\"91:1-95:66;7324-7580\">\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"91:1-91:50;7324-7373\">Full gap assessment before you spend on testing<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"92:1-92:40;7374-7413\">Coordination with BIS-recognized labs<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"93:1-93:44;7414-7457\">Complete application filing and follow-up<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"94:1-94:57;7458-7514\">Factory audit preparation, including mock walkthroughs<\/li>\n<li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"95:1-95:66;7515-7580\">Post-certification support for renewals and surveillance audits<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"97:1-97:152;7582-7733\">Based in Noida, Uttar Pradesh, we work with manufacturers across India \u2014 whether you&#8217;re just starting your BIS journey or renewing an existing license.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"99:1-99:30;7735-7764\">Frequently Asked Questions<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"101:1-102:181;7766-8022\"><strong>Is BIS certification really mandatory for electric centrifugal juicers?<\/strong> Yes. As a household electrical appliance covered under the 2026 QCO, electric centrifugal juicers need a valid ISI Mark before they can be manufactured, imported, or sold in India.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"104:1-105:113;8024-8181\"><strong>What standard is used for certification?<\/strong> IS 302 (Part 1):2024, aligned with IEC 60335-1:2020, along with the applicable product-specific Part 2 standard.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"107:1-108:122;8183-8349\"><strong>When exactly does this become mandatory?<\/strong> 1st October 2026 for large enterprises, 1st January 2027 for small enterprises, and 1st April 2027 for micro enterprises.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"110:1-111:197;8351-8608\"><strong>Can I keep selling my existing stock after the deadline?<\/strong> There are provisions for pre-implementation stock with proper declaration to BIS, but the rules can be specific \u2014 it&#8217;s worth confirming your exact situation with a consultant rather than assuming.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"113:1-114:150;8610-8824\"><strong>Do imported centrifugal juicers need this certification too?<\/strong> Yes \u2014 foreign manufacturers apply through the Foreign Manufacturers Certification Scheme, which requires a locally appointed representative in India.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"116:1-117:110;8826-8977\"><strong>How long does the whole process take?<\/strong> Usually 8 to 16 weeks for a straightforward domestic application, longer if redesign or re-testing is needed.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"119:1-120:139;8979-9186\"><strong>What happens if I sell without certification after the deadline?<\/strong> You risk product seizure, fines, and legal action under the BIS Act, 2016 \u2014 and you&#8217;ll likely be locked out of major e-commerce platforms.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"122:1-123:210;9188-9440\"><strong>Is the factory audit really necessary?<\/strong> Yes, it&#8217;s a mandatory part of the process \u2014 lab testing alone isn&#8217;t enough; BIS also needs to confirm your factory can consistently produce what was tested, including the lid interlock and basket guard design.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"125:1-126:242;9442-9790\"><strong>How is a centrifugal juicer different from a masticating\/cold-press juicer for certification purposes?<\/strong> Centrifugal juicers run a high-speed spinning shredder disc, which brings specific guarding and interlock requirements that differ from slower masticating models \u2014 confirm which Part 2 clauses apply to your exact mechanism with a consultant.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"128:1-129:167;9792-10025\"><strong>Do different capacity or model variants need separate testing?<\/strong> Generally, each distinct model or significant design variant needs its own testing coverage \u2014 it&#8217;s best to confirm the exact scope with your consultant before filing.<\/p>\n<h2 class=\"mt-3 -mb-1 text-[1.125rem] font-bold\" dir=\"ltr\" data-sourcepos=\"131:1-131:25;10027-10051\">Ready to Get Started?<\/h2>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"133:1-133:245;10053-10297\">The deadline is fixed, and certification isn&#8217;t something you can rush through at the last minute. Get in touch with Qualitance India for a free assessment of what your electric centrifugal juicer needs before you can legally carry the ISI Mark.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\" dir=\"ltr\" data-sourcepos=\"135:1-135:84;10299-10382\"><strong>Qualitance India \u2014 BIS\/ISI Mark Certification Consultancy, Noida, Uttar Pradesh<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BIS Certification for Electric Centrifugal Juicers in India: Complete Guide (IS 302 Part 1:2024) If you manufacture, import, or sell electric centrifugal juicers in India, there&#8217;s a compliance deadline you can&#8217;t afford to ignore. Under the government&#8217;s new Quality Control Order for household and commercial electrical appliances, electric centrifugal juicers sold in the country will [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3363,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"inline_featured_image":false,"slim_seo":{"title":"BIS Certification for Electric Centrifugal Juicers in India: Complete Guide (IS 302 Part 1:2024) - Qualitance India","description":"BIS Certification for Electric Centrifugal Juicers in India: Complete Guide (IS 302 Part 1:2024) If you manufacture, import, or sell electric centrifugal juicer"},"_slim_seo_primary_term_category":0,"_slim_seo_primary_term_post_tag":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/comments?post=3362"}],"version-history":[{"count":1,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3362\/revisions"}],"predecessor-version":[{"id":3364,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/posts\/3362\/revisions\/3364"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media\/3363"}],"wp:attachment":[{"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/media?parent=3362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/categories?post=3362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualitanceindia.com\/wp-json\/wp\/v2\/tags?post=3362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<!-- This website is optimized by Airlift. Learn more: https://airlift.net. Template:. Learn more: https://airlift.net. Template: 6a4cebdea01328942bf8f471. Config Timestamp: 2026-07-07 12:06:54 UTC, Cached Timestamp: 2026-09-13 00:13:35 UTC, Optimization Time: 1.85ms -->